{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T19:55:40Z","timestamp":1743105340843,"version":"3.40.3"},"publisher-location":"Cham","reference-count":13,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030299996"},{"type":"electronic","value":"9783030300005"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-30000-5_27","type":"book-chapter","created":{"date-parts":[[2019,8,23]],"date-time":"2019-08-23T19:02:24Z","timestamp":1566586944000},"page":"206-213","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["A DRC Scheduling for Social Sustainability: Trade-Off Between Tardiness and Workload Balance"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-5736-4313","authenticated-orcid":false,"given":"Muhammad","family":"Akbar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2040-9703","authenticated-orcid":false,"given":"Takashi","family":"Irohara","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,8,24]]},"reference":[{"key":"27_CR1","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1016\/j.ejor.2011.03.004","volume":"215","author":"J Xu","year":"2011","unstructured":"Xu, J., Xu, X., Xie, S.Q.: Recent developments in Dual Resource Constrained (DRC) system research. Eur. J. Oper. Res. 215, 309\u2013318 (2011)","journal-title":"Eur. J. Oper. Res."},{"key":"27_CR2","unstructured":"Akbar, M., Irohara, T.: A social-conscious scheduling model of dual resources constrained identical parallel machine to minimize tardiness and maximize operator productivity. In: Proceedings of International Conference on Computers and Industrial Engineering, CIE, December 2018"},{"key":"27_CR3","doi-asserted-by":"publisher","first-page":"225","DOI":"10.1007\/s10951-010-0162-4","volume":"14","author":"A Agnetis","year":"2011","unstructured":"Agnetis, A., Flamini, M., Nicosia, G., Pacifici, A.: A job-shop problem with one additional resource type. J. Sched. 14, 225\u2013237 (2011)","journal-title":"J. Sched."},{"key":"27_CR4","doi-asserted-by":"crossref","unstructured":"Paksi, A.B.N., Ma\u2019ruf, A.: Flexible job-shop scheduling with dual-resource constraints to minimize tardiness using genetic algorithm. In: IOP Conference Series: Materials Science and Engineering, vol. 114 p. 012060, Yogyakarta (2016)","DOI":"10.1088\/1757-899X\/114\/1\/012060"},{"key":"27_CR5","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.ejor.2016.05.062","volume":"256","author":"P Baptiste","year":"2017","unstructured":"Baptiste, P., Rebaine, D., Zouba, M.: FPTAS for the two identical parallel machine problem with a single operator under the free changing mode. Eur. J. Oper. Res. 256, 55\u201361 (2017)","journal-title":"Eur. J. Oper. Res."},{"key":"27_CR6","doi-asserted-by":"publisher","first-page":"2799","DOI":"10.1007\/s00170-013-5221-5","volume":"69","author":"A Costa","year":"2013","unstructured":"Costa, A., Cappadonna, F.A., Fichera, S.: A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times. Int. J. Adv. Manuf. Technol. 69, 2799\u20132817 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"27_CR7","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"464","DOI":"10.1007\/978-3-319-99704-9_57","volume-title":"Advances in Production Management Systems. Production Management for Data-Driven, Intelligent, Collaborative, and Sustainable Manufacturing","author":"M Akbar","year":"2018","unstructured":"Akbar, M., Irohara, T.: Dual resource constrained scheduling considering operator working modes and moving in identical parallel machines using a permutation-based genetic algorithm. In: Moon, I., Lee, G.M., Park, J., Kiritsis, D., von Cieminski, G. (eds.) APMS 2018. IAICT, vol. 535, pp. 464\u2013472. Springer, Cham (2018). https:\/\/doi.org\/10.1007\/978-3-319-99704-9_57"},{"key":"27_CR8","doi-asserted-by":"publisher","first-page":"866","DOI":"10.1016\/j.jclepro.2018.09.100","volume":"205","author":"M Akbar","year":"2018","unstructured":"Akbar, M., Irohara, T.: Scheduling for sustainable manufacturing: a review. J. Clean. Prod. 205, 866\u2013883 (2018)","journal-title":"J. Clean. Prod."},{"key":"27_CR9","unstructured":"Akbar, M., Irohara, T.: A social-conscious scheduling model of dual resources constrained identical parallel machine to minimize makespan and operator workload balance. In: Proceedings of the Asia Pacific Industrial Engineering & Management System Conference 2018, APIEMS (2018)"},{"key":"27_CR10","unstructured":"GRI (Global Reporting Initiative) Sustainability Reporting Standards - Non-Discrimination (GRI 406). https:\/\/www.globalreporting.org\/standards\/gri-standards-download-center\/. Accessed 28 Mar 2019"},{"issue":"2","key":"27_CR11","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transact. Evol. Comput. 6(2), 182\u2013195 (2002)","journal-title":"IEEE Transact. Evol. Comput."},{"issue":"8","key":"27_CR12","first-page":"1727","volume":"6","author":"YK Lin","year":"2012","unstructured":"Lin, Y.K., Hsieh, H.T., Hsieh, F.Y.: Unrelated parallel machines scheduling problem using an ant colony optimization approach. Int. J. Ind. Manuf. Eng. 6(8), 1727\u20131732 (2012)","journal-title":"Int. J. Ind. Manuf. Eng."},{"key":"27_CR13","doi-asserted-by":"publisher","first-page":"1269","DOI":"10.1007\/s10845-015-1049-1","volume":"28","author":"A Costa","year":"2017","unstructured":"Costa, A., Cappadonna, F.A., Fichera, S.: A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem. J. Intell. Manuf. 28, 1269\u20131283 (2017)","journal-title":"J. Intell. Manuf."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management for the Factory of the Future"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-30000-5_27","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,7]],"date-time":"2024-03-07T17:39:36Z","timestamp":1709833176000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-30000-5_27"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030299996","9783030300005"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-30000-5_27","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"24 August 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Austin, TX","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"USA","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"1 September 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 September 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2019a","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}