{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T07:48:01Z","timestamp":1768549681778,"version":"3.49.0"},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030299996","type":"print"},{"value":"9783030300005","type":"electronic"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-30000-5_31","type":"book-chapter","created":{"date-parts":[[2019,8,23]],"date-time":"2019-08-23T19:02:24Z","timestamp":1566586944000},"page":"239-247","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Simple Assembly Line Balancing Problem with Power Peak Minimization"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-5457-3689","authenticated-orcid":false,"given":"Paolo","family":"Gianessi","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9465-1255","authenticated-orcid":false,"given":"Xavier","family":"Delorme","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0100-536X","authenticated-orcid":false,"given":"Oussama","family":"Masmoudi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,8,24]]},"reference":[{"key":"31_CR1","unstructured":"International energy agency: tracking clean energy progress 2017: industry, 16 May 2017. https:\/\/www.iea.org\/etp\/tracking2017\/industry\/"},{"issue":"2","key":"31_CR2","doi-asserted-by":"publisher","first-page":"247","DOI":"10.3390\/en12020247","volume":"12","author":"A Lawrence","year":"2019","unstructured":"Lawrence, A., Thollander, P., Andrei, M., Karlsson, M.: Specific energy consumption\/use (SEC) in energy management for improving energy efficiency in industry: meaning. Usage Differ. Energies 12(2), 247 (2019)","journal-title":"Usage Differ. Energies"},{"key":"31_CR3","doi-asserted-by":"publisher","first-page":"418","DOI":"10.1016\/j.rcim.2013.04.001","volume":"29","author":"M Dai","year":"2013","unstructured":"Dai, M., Tang, D., Giret, A., Salido, M.A., Li, W.D.: Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm. Robot Comput.-Int. Manuf. 29, 418\u2013429 (2013)","journal-title":"Robot Comput.-Int. Manuf."},{"issue":"8","key":"31_CR4","doi-asserted-by":"publisher","first-page":"909","DOI":"10.1287\/mnsc.32.8.909","volume":"32","author":"\u0130 Baybars","year":"1986","unstructured":"Baybars, \u0130.: A survey of exact algorithms for the simple assembly line balancing problem. Manag. Sci. 32(8), 909\u2013932 (1986)","journal-title":"Manag. Sci."},{"key":"31_CR5","unstructured":"Scholl, A.: Balancing and sequencing of assembly lines. Technical report, Darmstadt Technical University - Institute for Business Studies (BWL) (1999)"},{"key":"31_CR6","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1539266","author":"A Cerqueus","year":"2018","unstructured":"Cerqueus, A., Delorme, X.: A branch-and-bound method for the bi-objective simple line assembly balancing problem. Int. J. Prod. Res. (2018). https:\/\/doi.org\/10.1080\/00207543.2018.1539266","journal-title":"Int. J. Prod. Res."},{"key":"31_CR7","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1016\/j.ejor.2014.06.023","volume":"240","author":"T Pape","year":"2015","unstructured":"Pape, T.: Heuristics and lower bounds for the simple assembly line balancing problem type 1: overview, computational tests and improvements. Eur. J. Oper. Res. 240, 32\u201342 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"31_CR8","doi-asserted-by":"publisher","first-page":"433","DOI":"10.1287\/ijoc.1110.0462","volume":"24","author":"EC Sewell","year":"2012","unstructured":"Sewell, E.C., Jacobson, S.H.: A branch, bound, and remember algorithm for the simple assembly line balancing problem. INFORMS J. Comput. 24(3), 433\u2013442 (2012)","journal-title":"INFORMS J. Comput."},{"key":"31_CR9","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1016\/j.ijpe.2012.10.020","volume":"142","author":"O Batta\u00efa","year":"2013","unstructured":"Batta\u00efa, O., Dolgui, A.: A taxonomy of line balancing problems and their solution approaches. Int. J. Prod. Econ. 142, 259\u2013277 (2013)","journal-title":"Int. J. Prod. Econ."},{"key":"31_CR10","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1016\/j.ejor.2018.03.011","volume":"270","author":"L Borba","year":"2018","unstructured":"Borba, L., Ritt, M., Miralles, C.: Exact and heuristic methods for solving the robotic assembly line balancing problem. Eur. J. Oper. Res. 270, 146\u2013156 (2018)","journal-title":"Eur. J. Oper. Res."},{"key":"31_CR11","doi-asserted-by":"publisher","first-page":"508","DOI":"10.1016\/j.jclepro.2016.06.131","volume":"135","author":"Z Li","year":"2016","unstructured":"Li, Z., Tang, Q., Zhang, L.: Minimizing energy consumption and cycle time in two-sided robotic assembly line systems using restarted simulated annealing algorithm. J. Clean. Prod. 135, 508\u2013522 (2016)","journal-title":"J. Clean. Prod."},{"issue":"2","key":"31_CR12","doi-asserted-by":"publisher","first-page":"580","DOI":"10.1108\/EC-11-2014-0232","volume":"33","author":"MJ Nilakantan","year":"2016","unstructured":"Nilakantan, M.J., Ponnambalam, S.G., Jawahar, N.: Design of energy efficient RAL system using evolutionary algorithms. Eng. Comput. 33(2), 580\u2013602 (2016)","journal-title":"Eng. Comput."},{"issue":"2","key":"31_CR13","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1016\/j.jclepro.2014.11.041","volume":"90","author":"MJ Nilakantan","year":"2015","unstructured":"Nilakantan, M.J., Huang, G.Q., Ponnambalam, S.G.: An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems. J. Clean. Prod. 90(2), 311\u2013325 (2015)","journal-title":"J. Clean. Prod."},{"issue":"3","key":"31_CR14","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1016\/j.cie.2008.09.027","volume":"56","author":"J Gao","year":"2009","unstructured":"Gao, J., Sun, L., Wang, L., Gen, M.: An efficient approach for type II robotic assembly line balancing problems. Comput. Ind. Eng. 56(3), 1065\u20131080 (2009)","journal-title":"Comput. Ind. Eng."},{"issue":"4","key":"31_CR15","doi-asserted-by":"publisher","first-page":"234","DOI":"10.1016\/j.jmsy.2011.08.004","volume":"30","author":"K Fang","year":"2011","unstructured":"Fang, K., Uhan, N., Zhao, F., Sutherland, J.W.: A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. J. Manuf. Syst. 30(4), 234\u2013240 (2011)","journal-title":"J. Manuf. Syst."},{"issue":"1","key":"31_CR16","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1016\/j.cirp.2012.03.084","volume":"61","author":"AG Bruzzone","year":"2012","unstructured":"Bruzzone, A.G., Anghinolfi, D., Paolucci, M., Tonelli, F.: Energy-aware scheduling for improving manufacturing process sustainability: a mathematical model for flexible flow shops. CIRP Ann-Manuf. Tech. 61(1), 459\u2013462 (2012)","journal-title":"CIRP Ann-Manuf. Tech."},{"issue":"20","key":"31_CR17","doi-asserted-by":"publisher","first-page":"6011","DOI":"10.1080\/00207543.2017.1321801","volume":"55","author":"S Kemmoe","year":"2017","unstructured":"Kemmoe, S., Lamy, D., Tchernev, N.: Job-shop like manufacturing system with variable power threshold and operations with power requirements. Int. J. Prod. Res. 55(20), 6011\u20136032 (2017)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"31_CR18","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ijpe.2010.09.030","volume":"143","author":"C Artigues","year":"2013","unstructured":"Artigues, C., Lopez, P., Ha\u00eft, A.: The energy scheduling problem: Industrial case-study and constraint propagation techniques. Int. J. Prod. Econ. 143(1), 13\u201323 (2013)","journal-title":"Int. J. Prod. Econ."},{"key":"31_CR19","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.ijpe.2019.03.021","volume":"216","author":"O Masmoudi","year":"2019","unstructured":"Masmoudi, O., Delorme, X., Gianessi, P.: Job-shop scheduling problem with energy consideration. Int. J. Prod. Econ. 216, 12\u201322 (2019)","journal-title":"Int. J. Prod. Econ."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management for the Factory of the Future"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-30000-5_31","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,7]],"date-time":"2024-03-07T17:39:48Z","timestamp":1709833188000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-30000-5_31"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030299996","9783030300005"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-30000-5_31","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"24 August 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Austin, TX","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"USA","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"1 September 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 September 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2019a","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}