{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,11]],"date-time":"2024-09-11T14:59:38Z","timestamp":1726066778897},"publisher-location":"Cham","reference-count":31,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030341510"},{"type":"electronic","value":"9783030341527"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-34152-7_10","type":"book-chapter","created":{"date-parts":[[2020,2,3]],"date-time":"2020-02-03T09:43:16Z","timestamp":1580722996000},"page":"130-145","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Integrated-Optimization of Production, Preventive Maintenance and Spare Parts Inventory of Continuous Operating Series Systems"],"prefix":"10.1007","author":[{"given":"Debasis Das","family":"Adhikary","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dipak Kumar","family":"Jana","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,2,1]]},"reference":[{"key":"10_CR1","doi-asserted-by":"publisher","first-page":"817","DOI":"10.1016\/j.cie.2008.03.004","volume":"55","author":"A Sachdeva","year":"2008","unstructured":"Sachdeva, A., Kumar, D., Kumar, P.: Planning and optimizing the maintenance of paper production systems in a paper plant. Comput. Ind. Eng. 55, 817\u2013829 (2008)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"10_CR2","doi-asserted-by":"publisher","first-page":"883","DOI":"10.1080\/00207543.2012.677070","volume":"51","author":"CS Wong","year":"2013","unstructured":"Wong, C.S., Chan, F.T.S., Chung, S.H.: A joint production scheduling approach considering multiple resources and preventive maintenance tasks. Int. J. Prod. Res. 51(3), 883\u2013896 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"10_CR3","doi-asserted-by":"publisher","first-page":"751","DOI":"10.1016\/S0307-904X(00)00011-1","volume":"24","author":"R Sarker","year":"2000","unstructured":"Sarker, R., Haque, A.: Optimization of maintenance and spare provisioning policy using simulation. Appl. Math. Model. 24, 751\u2013760 (2000)","journal-title":"Appl. Math. Model."},{"issue":"1","key":"10_CR4","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1016\/0377-2217(94)00246-0","volume":"90","author":"ABMZ Kabir","year":"1996","unstructured":"Kabir, A.B.M.Z., Al-Olayan, A.S.: A stocking policy for spare part provisioning under age based preventive replacement. Eur. J. Oper. Res. 90(1), 171\u2013181 (1996)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"10_CR5","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1016\/0951-8320(96)00013-0","volume":"52","author":"ABMZ Kabir","year":"1996","unstructured":"Kabir, A.B.M.Z., Farrash, S.H.A.: Simulation of an integrated age replacement and spare provisioning policy using SLAM. Reliab. Eng. Syst. Saf. 52(2), 129\u2013138 (1996)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10_CR6","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/j.ejor.2003.06.026","volume":"161","author":"TS Vaughan","year":"2005","unstructured":"Vaughan, T.S.: Failure replacement and preventive maintenance spare parts ordering policy. Eur. J. Oper. Res. 161, 183\u2013190 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"10_CR7","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1080\/02533839.2006.9671125","volume":"23","author":"MC Chen","year":"2006","unstructured":"Chen, M.C., Hsu, C.M., Chen, S.W.: Optimizing joint maintenance and stock provisioning policy for a multi-echelon spare part logistics network. J. Chinese Inst. Ind. Eng. 23(4), 289\u2013302 (2006)","journal-title":"J. Chinese Inst. Ind. Eng."},{"key":"10_CR8","doi-asserted-by":"publisher","first-page":"594","DOI":"10.1007\/s00170-006-0618-z","volume":"34","author":"M Ilgin","year":"2007","unstructured":"Ilgin, M., Tunali, S.: Joint optimization of spare parts inventory and maintenance policies using genetic algorithms. Int. J. Adv. Manuf. Technol. 34, 594\u2013604 (2007)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"10_CR9","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.ijpe.2008.08.058","volume":"118","author":"KS Smidt-Destombes de","year":"2009","unstructured":"de Smidt-Destombes, K.S., van der Heijden, M.C., van Harten, A.: Joint optimization of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems. Int. J. Prod. Econ. 118, 260\u2013268 (2009)","journal-title":"Int. J. Prod. Econ."},{"key":"10_CR10","doi-asserted-by":"publisher","first-page":"1157","DOI":"10.1016\/j.apm.2010.08.003","volume":"35","author":"II Nosoohi","year":"2011","unstructured":"Nosoohi, I.I., Hejazi, S.R.: A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times. Appl. Math. Model. 35, 1157\u20131166 (2011)","journal-title":"Appl. Math. Model."},{"key":"10_CR11","doi-asserted-by":"publisher","unstructured":"Alrabghi, A., Tiwari, A., Alabdulkarim, A.: Simulation based optimization of joint maintenance and inventory for multi-components manufacturing systems. In: Proceedings of the 2013 Winter Simulation Conference, Washington, DC, pp. 1109\u20131119. IEEE (2013). \nhttps:\/\/doi.org\/10.1109\/wsc.2013.6721500","DOI":"10.1109\/wsc.2013.6721500"},{"key":"10_CR12","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1016\/j.cie.2013.03.005","volume":"65","author":"P Lynch","year":"2013","unstructured":"Lynch, P., Adendorff, K., Yadavalli, V.S.S., Adetunji, O.: Optimal spares and preventive maintenance frequencies for constrained industrial systems. Comput. Ind. Eng. 65, 378\u2013387 (2013)","journal-title":"Comput. Ind. Eng."},{"issue":"19","key":"10_CR13","doi-asserted-by":"publisher","first-page":"6032","DOI":"10.1016\/j.apm.2015.01.035","volume":"39","author":"S Gan","year":"2015","unstructured":"Gan, S., Zhang, Z., Zhou, Y., Jinfei, S.: Joint optimization of maintenance, buffer, and spare parts for a production system. Appl. Math. Model. 39(19), 6032\u20136042 (2015)","journal-title":"Appl. Math. Model."},{"key":"10_CR14","doi-asserted-by":"publisher","first-page":"1535","DOI":"10.1016\/j.ress.2011.07.004","volume":"96","author":"W Wang","year":"2011","unstructured":"Wang, W.: A joint spare part and maintenance inspection optimization model using the Delay-Time concept. Reliab. Eng. Syst. Saf. 96, 1535\u20131541 (2011)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10_CR15","doi-asserted-by":"publisher","first-page":"127","DOI":"10.1016\/j.ejor.2011.07.031","volume":"216","author":"W Wang","year":"2012","unstructured":"Wang, W.: A stochastic model for joint spare parts inventory and planned maintenance optimization. Eur. J. Oper. Res. 216, 127\u2013139 (2012)","journal-title":"Eur. J. Oper. Res."},{"key":"10_CR16","doi-asserted-by":"publisher","first-page":"184","DOI":"10.1016\/j.ejor.2007.12.012","volume":"194","author":"L Wang","year":"2009","unstructured":"Wang, L., Chu, J., Mao, W.: A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure. Eur. J. Oper. Res. 194, 184\u2013205 (2009)","journal-title":"Eur. J. Oper. Res."},{"key":"10_CR17","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/j.ress.2013.07.009","volume":"12","author":"MC Fitouhi","year":"2014","unstructured":"Fitouhi, M.C., Nourelfath, M.: Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems. Reliab. Eng. Syst. Saf. 12, 175\u2013186 (2014)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10_CR18","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.ress.2012.02.001","volume":"101","author":"M Nourelfath","year":"2012","unstructured":"Nourelfath, M., Ch\u00e2telet, E.: Integrating production, inventory and maintenance planning for a parallel system with dependent components. Reliab. Eng. Syst. Saf. 101, 59\u201366 (2012)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10_CR19","doi-asserted-by":"publisher","first-page":"1584","DOI":"10.1016\/j.cor.2009.11.017","volume":"37","author":"A Berrichi","year":"2010","unstructured":"Berrichi, A., Yalaoui, F., Amodeo, L., Mezghiche, M.: Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res. 37, 1584\u20131596 (2010)","journal-title":"Comput. Oper. Res."},{"key":"10_CR20","first-page":"949","volume":"21","author":"V Dadhich","year":"2010","unstructured":"Dadhich, V., Roy, S.: Availability \u2013based optimization of preventive maintenance schedule: a parametric study. Chem. Eng. Trans. 21, 949\u2013954 (2010)","journal-title":"Chem. Eng. Trans."},{"key":"10_CR21","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1016\/S0951-8320(01)00065-5","volume":"74","author":"YT Tsai","year":"2001","unstructured":"Tsai, Y.T., Wang, K.S., Teng, H.Y.: A study of availability-centered preventive maintenance for multi-component systems. Reliab. Eng. Syst. Saf. 74, 89\u201397 (2001)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10_CR22","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.ress.2003.11.011","volume":"84","author":"YT Tsai","year":"2004","unstructured":"Tsai, Y.T., Wang, K.S., Tsai, L.C.: Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliab. Eng. Syst. Saf. 84, 261\u2013270 (2004)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"20","key":"10_CR23","doi-asserted-by":"publisher","first-page":"5761","DOI":"10.1080\/00207540601182260","volume":"46","author":"S Panagiotidou","year":"2008","unstructured":"Panagiotidou, S., Tagaras, G.: Evaluation of maintenance policies for equipment subject to quality shifts and failures. Int. J. Prod. Res. 46(20), 5761\u20135779 (2008)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"10_CR24","doi-asserted-by":"publisher","first-page":"654","DOI":"10.1016\/j.cie.2010.12.021","volume":"60","author":"KS Moghaddam","year":"2011","unstructured":"Moghaddam, K.S., Usher, J.S.: Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming. Comput. Ind. Eng. 60(4), 654\u2013665 (2011)","journal-title":"Comput. Ind. Eng."},{"key":"10_CR25","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.ress.2014.01.010","volume":"126","author":"M Doostparast","year":"2014","unstructured":"Doostparast, M., Kolahan, F., Doostparast, M.: A reliability-based approach to optimize preventive maintenance scheduling for coherent systems. Reliab. Eng. Syst. Saf. 126, 98\u2013106 (2014)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"14","key":"10_CR26","doi-asserted-by":"publisher","first-page":"4132","DOI":"10.1080\/00207543.2013.835499","volume":"52","author":"A Khatab","year":"2014","unstructured":"Khatab, A., Ait-Kadi, D., Rezg, N.: Availability optimisation for stochastic degrading systems under imperfect\u00a0preventive\u00a0maintenance. Int. J. Prod. Res. 52(14), 4132\u20134141 (2014)","journal-title":"Int. J. Prod. Res."},{"key":"10_CR27","doi-asserted-by":"crossref","unstructured":"Behera, S.K., Dash, A.P.: Performance analysis of coal fired power plants in India. In: Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management, Bangladesh, Dhaka (2010)","DOI":"10.2139\/ssrn.2694154"},{"issue":"4","key":"10_CR28","doi-asserted-by":"publisher","first-page":"991","DOI":"10.1080\/00207543.2011.551844","volume":"50","author":"C Ruifeng","year":"2012","unstructured":"Ruifeng, C., Subramaniam, V.: Increasing production rate in Kanban controlled assembly lines through preventive maintenance. Int. J. Prod. Res. 50(4), 991\u20131008 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"10_CR29","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1108\/13552510510601366","volume":"11","author":"B Ghodrati","year":"2005","unstructured":"Ghodrati, B., Kumar, U.: Reliability and operating environment-based spare parts estimation approach, a case study in Kiruna Mine, Sweden. J. Qual. Maintenance Eng. 11(2), 169\u2013184 (2005)","journal-title":"J. Qual. Maintenance Eng."},{"key":"10_CR30","volume-title":"An Introduction to Reliability and Maintainability Engineering","author":"CE Ebeling","year":"2000","unstructured":"Ebeling, C.E.: An Introduction to Reliability and Maintainability Engineering, 10th edn. Tata McGraw-Hill, New Delhi (2000)","edition":"10"},{"key":"10_CR31","first-page":"423","volume":"3","author":"DD Adhikary","year":"2012","unstructured":"Adhikary, D.D., Bose, G.K., Chattopadhyay, S., Bose, D., Mitra, S.: RAM investigation of coal-fired thermal power plants: a case study. Int. J. Ind. Eng. Comput. 3, 423\u2013434 (2012)","journal-title":"Int. J. Ind. Eng. Comput."}],"container-title":["Studies in Computational Intelligence","Recent Advances in Intelligent Information Systems and Applied Mathematics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-34152-7_10","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,2,3]],"date-time":"2020-02-03T09:52:03Z","timestamp":1580723523000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-34152-7_10"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030341510","9783030341527"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-34152-7_10","relation":{},"ISSN":["1860-949X","1860-9503"],"issn-type":[{"type":"print","value":"1860-949X"},{"type":"electronic","value":"1860-9503"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"1 February 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICITAM","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Information Technology and Applied Mathematics","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Haldia","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"India","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7 March 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 March 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icitam2019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/hithaldia.co.in\/icitam2019\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}