{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T06:30:19Z","timestamp":1742970619929,"version":"3.40.3"},"publisher-location":"Cham","reference-count":15,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030484385"},{"type":"electronic","value":"9783030484392"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-48439-2_69","type":"book-chapter","created":{"date-parts":[[2020,9,24]],"date-time":"2020-09-24T15:04:52Z","timestamp":1600959892000},"page":"569-574","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Constructive Heuristics in Hybrid Flow Shop Scheduling with Unrelated Machines and Setup Times"],"prefix":"10.1007","author":[{"given":"Andreas","family":"Hipp","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jutta","family":"Geldermann","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,9,25]]},"reference":[{"issue":"2","key":"69_CR1","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi, A.: The third comprehensive survey on scheduling problems with setup times\/costs. Eur. J. Oper. Res. 246(2), 345\u2013378 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"9\u201310","key":"69_CR2","doi-asserted-by":"crossref","first-page":"2490","DOI":"10.1016\/j.apm.2013.10.061","volume":"38","author":"M Ebrahimi","year":"2014","unstructured":"Ebrahimi, M., Ghomi, S.M.T.F., Karimi, B.: Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Appl. Math. Model. 38(9\u201310), 2490\u20132504 (2014)","journal-title":"Appl. Math. Model."},{"key":"69_CR3","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/j.eswa.2018.07.055","volume":"114","author":"V Fernandez-Viagas","year":"2018","unstructured":"Fernandez-Viagas, V., Molina-Pariente, J.M., Frami\u00f1an, J.M.: New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics. Expert Syst. Appl. 114, 345\u2013356 (2018)","journal-title":"Expert Syst. Appl."},{"key":"69_CR4","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Discret. Math."},{"issue":"5","key":"69_CR5","first-page":"1","volume":"28","author":"J Jungwattanakit","year":"2005","unstructured":"Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., Werner, F.: An evaluation of sequencing heuristics for flexible flowshop scheduling problems with unrelated parallel machines and dual criteria. Otto-von-Guericke-Universitat Magdeburg 28(5), 1\u201323 (2005)","journal-title":"Otto-von-Guericke-Universitat Magdeburg"},{"issue":"3","key":"69_CR6","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0167-6377(94)90026-4","volume":"16","author":"C-Y Lee","year":"1994","unstructured":"Lee, C.-Y., Vairaktarakis, G.L.: Minimizing makespan in hybrid flowshops. Oper. Res. Lett. 16(3), 149\u2013158 (1994)","journal-title":"Oper. Res. Lett."},{"issue":"6","key":"69_CR7","doi-asserted-by":"crossref","first-page":"965","DOI":"10.1007\/s10845-009-0373-8","volume":"22","author":"HS Mirsanei","year":"2011","unstructured":"Mirsanei, H.S., Zandieh, M., Moayed, M.J., Khabbazi, M.R.: A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. J. Intell. Manuf. 22(6), 965\u2013978 (2011)","journal-title":"J. Intell. Manuf."},{"issue":"24","key":"69_CR8","doi-asserted-by":"crossref","first-page":"5767","DOI":"10.1016\/j.apm.2014.04.012","volume":"38","author":"B Naderi","year":"2014","unstructured":"Naderi, B., Gohari, S., Yazdani, M.: Hybrid flexible flowshop problems: Models and solution methods. Appl. Math. Model. 38(24), 5767\u20135780 (2014)","journal-title":"Appl. Math. Model."},{"issue":"6","key":"69_CR9","doi-asserted-by":"crossref","first-page":"9625","DOI":"10.1016\/j.eswa.2008.09.063","volume":"36","author":"B Naderi","year":"2009","unstructured":"Naderi, B., Zandieh, M., Balagh, A.K.G., Roshanaei, V.: An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness. Expert Syst. Appl. 36(6), 9625\u20139633 (2009)","journal-title":"Expert Syst. Appl."},{"issue":"1","key":"69_CR10","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz, M., Enscore, E.E., Ham, I.: A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega 11(1), 91\u201395 (1983)","journal-title":"Omega"},{"issue":"9\u201312","key":"69_CR11","doi-asserted-by":"crossref","first-page":"1129","DOI":"10.1007\/s00170-009-2475-z","volume":"49","author":"E Rashidi","year":"2010","unstructured":"Rashidi, E., Jahandar, M., Zandieh, M.: An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines. Int. J. Adv. Manuf. Technol. 49(9\u201312), 1129\u20131139 (2010)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"8","key":"69_CR12","doi-asserted-by":"crossref","first-page":"1439","DOI":"10.1016\/j.cor.2009.11.001","volume":"37","author":"I Ribas","year":"2010","unstructured":"Ribas, I., Leisten, R., Frami\u00f1an, J.M.: Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective. Comput. Oper. Res. 37(8), 1439\u20131454 (2010)","journal-title":"Comput. Oper. Res."},{"issue":"4","key":"69_CR13","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/j.cor.2006.07.014","volume":"35","author":"R Ruiz","year":"2008","unstructured":"Ruiz, R., \u015eerifo\u011flu, F.S., Urlings, T.: Modeling realistic hybrid flexible flowshop scheduling problems. Comput. Oper. Res. 35(4), 1151\u20131175 (2008)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"69_CR14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., V\u00e1zquez-Rodr\u00edguez, J.A.: The hybrid flow shop scheduling problem. Eur. J. Oper. Res. 205(1), 1\u201318 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"69_CR15","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/j.ijpe.2017.10.015","volume":"195","author":"O Shahvari","year":"2018","unstructured":"Shahvari, O., Logendran, R.: A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect. Int. J. Prod. Econ. 195, 227\u2013248 (2018)","journal-title":"Int. J. Prod. Econ."}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2019"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-48439-2_69","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,24]],"date-time":"2020-09-24T15:21:20Z","timestamp":1600960880000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-48439-2_69"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030484385","9783030484392"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-48439-2_69","relation":{},"ISSN":["0721-5924","2197-9294"],"issn-type":[{"type":"print","value":"0721-5924"},{"type":"electronic","value":"2197-9294"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"25 September 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}