{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,19]],"date-time":"2026-02-19T22:15:25Z","timestamp":1771539325069,"version":"3.50.1"},"publisher-location":"Cham","reference-count":28,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030501426","type":"print"},{"value":"9783030501433","type":"electronic"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-50143-3_52","type":"book-chapter","created":{"date-parts":[[2020,6,5]],"date-time":"2020-06-05T21:03:01Z","timestamp":1591390981000},"page":"663-676","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["A Genetic Approach to the Job Shop Scheduling Problem with Interval Uncertainty"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2615-0042","authenticated-orcid":false,"given":"Hern\u00e1n","family":"D\u00edaz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3266-009X","authenticated-orcid":false,"given":"In\u00e9s","family":"Gonz\u00e1lez-Rodr\u00edguez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0479-1490","authenticated-orcid":false,"given":"Juan Jos\u00e9","family":"Palacios","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3024-6605","authenticated-orcid":false,"given":"Irene","family":"D\u00edaz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9271-2360","authenticated-orcid":false,"given":"Camino R.","family":"Vela","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,6,5]]},"reference":[{"key":"52_CR1","doi-asserted-by":"publisher","first-page":"200","DOI":"10.1016\/j.cor.2014.06.003","volume":"51","author":"A Allahverdi","year":"2014","unstructured":"Allahverdi, A., Aydilek, H., Aydilek, A.: Single machine scheduling problem with interval processing times to minimize mean weighted completion time. Comput. Oper. Res. 51, 200\u2013207 (2014). \nhttps:\/\/doi.org\/10.1016\/j.cor.2014.06.003","journal-title":"Comput. Oper. Res."},{"key":"52_CR2","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1287\/ijoc.3.2.149","volume":"3","author":"D Applegate","year":"1991","unstructured":"Applegate, D., Cook, W.: A computational study of the job-shop scheduling problem. ORSA J. Comput. 3, 149\u2013156 (1991)","journal-title":"ORSA J. Comput."},{"key":"52_CR3","series-title":"International Handbooks on Information Systems","doi-asserted-by":"publisher","first-page":"911","DOI":"10.1007\/978-3-319-05915-0_11","volume-title":"Handbook on Project Management and Scheduling","author":"C Artigues","year":"2015","unstructured":"Artigues, C., Briand, C., Garaix, T.: Temporal analysis of projects under interval uncertainty. In: Schwindt, C., Zimmermann, J. (eds.) Handbook on Project Management and Scheduling. IHIS, vol. 2, pp. 911\u2013927. Springer, Cham (2015). \nhttps:\/\/doi.org\/10.1007\/978-3-319-05915-0_11"},{"key":"52_CR4","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","volume":"161","author":"H Aytung","year":"2005","unstructured":"Aytung, H., Lawley, M.A., McKay, K., Shantha, M., Uzsoy, R.: Executing production schedules in the face of uncertainties: a review and some future directions. Eur. J. Oper. Res. 161, 86\u2013110 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"52_CR5","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1007\/s10951-008-0080-x","volume":"12","author":"J Bidot","year":"2009","unstructured":"Bidot, J., Vidal, T., Laboire, P.: A theoretic and practical framework for scheduling in stochastic environment. J. Sched. 12, 315\u2013344 (2009)","journal-title":"J. Sched."},{"key":"52_CR6","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/BF01719250","volume":"17","author":"C Bierwirth","year":"1995","unstructured":"Bierwirth, C.: A generalized permutation approach to jobshop scheduling with genetic algorithms. OR Spectr. 17, 87\u201392 (1995)","journal-title":"OR Spectr."},{"key":"52_CR7","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1016\/j.fss.2012.07.015","volume":"220","author":"H Bustince","year":"2013","unstructured":"Bustince, H., Fernandez, J., Koles\u00e1rov\u00e1, A., Mesiar, R.: Generation of linear orders for intervals by means of aggregation functions. Fuzzy Sets Syst. 220, 69\u201377 (2013)","journal-title":"Fuzzy Sets Syst."},{"issue":"3","key":"52_CR8","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1109\/3468.487961","volume":"26","author":"D Dubois","year":"1996","unstructured":"Dubois, D., Prade, H., Smets, P.: Representing partial ignorance. IEEE Trans. Syst. Man Cybern. Part A 26(3), 361\u2013377 (1996)","journal-title":"IEEE Trans. Syst. Man Cybern. Part A"},{"key":"52_CR9","doi-asserted-by":"crossref","unstructured":"Dubois, D., Prade, H., Sandri, S.: On possibility\/probability transformations. In: Fuzzy Logic, Theory and Decision Library, vol. 12, pp. 103\u2013112. Kluwer Academic (1993)","DOI":"10.1007\/978-94-011-2014-2_10"},{"issue":"3","key":"52_CR10","doi-asserted-by":"publisher","first-page":"655","DOI":"10.1109\/TSMCA.2008.918603","volume":"38","author":"I Gonz\u00e1lez Rodr\u00edguez","year":"2008","unstructured":"Gonz\u00e1lez Rodr\u00edguez, I., Puente, J., Vela, C.R., Varela, R.: Semantics of schedules for the fuzzy job shop problem. IEEE Trans. Syst. Man Cybern. Part A 38(3), 655\u2013666 (2008)","journal-title":"IEEE Trans. Syst. Man Cybern. Part A"},{"key":"52_CR11","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1016\/j.asoc.2016.01.033","volume":"42","author":"Y Han","year":"2016","unstructured":"Han, Y., Gong, D., Yaochu, J., Pan, Q.K.: Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time. Appl. Soft Comput. 42, 229\u2013245 (2016)","journal-title":"Appl. Soft Comput."},{"key":"52_CR12","unstructured":"Hurwicz, L.: A class of criteria for decision-making under ignorance. Cowles Commission Discussion Paper. Statistics 370 (1951)"},{"issue":"1","key":"52_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2007.03.031","volume":"188","author":"C Jiang","year":"2008","unstructured":"Jiang, C., Han, X., Liu, G., Liu, G.: A nonlinear interval number programming method for uncertain optimization problems. Eur. J. Oper. Res. 188(1), 1\u201313 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"52_CR14","first-page":"38","volume":"16","author":"S Karmakar","year":"2012","unstructured":"Karmakar, S., Bhunia, A.K.: A comparative study of different order relations of intervals. Reliable Comput. 16, 38\u201372 (2012)","journal-title":"Reliable Comput."},{"key":"52_CR15","doi-asserted-by":"publisher","first-page":"1200","DOI":"10.1016\/j.cie.2011.07.010","volume":"61","author":"D Lei","year":"2011","unstructured":"Lei, D.: Population-based neighborhood search for job shop scheduling with interval processing time. Comput. Ind. Eng. 61, 1200\u20131208 (2011). \nhttps:\/\/doi.org\/10.1016\/j.cie.2011.07.010","journal-title":"Comput. Ind. Eng."},{"key":"52_CR16","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1007\/s00170-011-3600-3","volume":"60","author":"D Lei","year":"2012","unstructured":"Lei, D.: Interval job shop scheduling problems. Int. J. Adv. Manuf. Technol. 60, 291\u2013301 (2012). \nhttps:\/\/doi.org\/10.1007\/s00170-011-3600-3","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"52_CR17","doi-asserted-by":"publisher","first-page":"1835","DOI":"10.1007\/s00170-012-4463-y","volume":"66","author":"D Lei","year":"2013","unstructured":"Lei, D.: Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance. Int. J. Adv. Manuf. Technol. 66, 1835\u20131843 (2013). \nhttps:\/\/doi.org\/10.1007\/s00170-012-4463-y","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"52_CR18","doi-asserted-by":"crossref","unstructured":"Lei, D., Cao, S.: A novel shuffled frog-leaping algorithm for flexible job shop scheduling with interval processing time. In: Proceedings of the 36th Chinese Control Conference, pp. 2708\u20132713 (2017)","DOI":"10.23919\/ChiCC.2017.8027773"},{"key":"52_CR19","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1016\/j.ijpe.2014.07.026","volume":"159","author":"D Lei","year":"2015","unstructured":"Lei, D., Guo, X.: An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective. Int. J. Prod. Econ. 159, 296\u2013303 (2015). \nhttps:\/\/doi.org\/10.1016\/j.ijpe.2014.07.026","journal-title":"Int. J. Prod. Econ."},{"issue":"5","key":"52_CR20","doi-asserted-by":"publisher","first-page":"991","DOI":"10.1016\/j.mcm.2008.02.004","volume":"49","author":"N Matsveichuk","year":"2009","unstructured":"Matsveichuk, N., Sotskov, Y., Egorova, N., Lai, T.C.: Schedule execution for two-machine flow-shop with interval processing times. Math. Comput. Modell. 49(5), 991\u20131011 (2009). \nhttps:\/\/doi.org\/10.1016\/j.mcm.2008.02.004","journal-title":"Math. Comput. Modell."},{"key":"52_CR21","doi-asserted-by":"crossref","unstructured":"Moore, R.E., Kearfott, R.B., Cloud, M.J.: Introduction to Interval Analysis. Society for Industrial and Applied Mathematics (2009)","DOI":"10.1137\/1.9780898717716"},{"issue":"2","key":"52_CR22","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1007\/s11047-014-9413-1","volume":"13","author":"JJ Palacios","year":"2014","unstructured":"Palacios, J.J., Gonz\u00e1lez-Rodr\u00edguez, I., Vela, C.R., Puente, J.: Robust swarm optimisation for fuzzy open shop scheduling. Nat. Comput. 13(2), 145\u2013156 (2014). \nhttps:\/\/doi.org\/10.1007\/s11047-014-9413-1","journal-title":"Nat. Comput."},{"key":"52_CR23","doi-asserted-by":"publisher","first-page":"736","DOI":"10.1016\/j.ins.2015.09.042","volume":"329","author":"JJ Palacios","year":"2016","unstructured":"Palacios, J.J., Puente, J., Vela, C.R., Gonz\u00e1lez-Rodr\u00edguez, I.: Benchmarks for fuzzy job shop problems. Inf. Sci. 329, 736\u2013752 (2016). \nhttps:\/\/doi.org\/10.1016\/j.ins.2015.09.042","journal-title":"Inf. Sci."},{"key":"52_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-26580-3","volume-title":"Scheduling. Theory, Algorithms, and Systems","author":"ML Pinedo","year":"2016","unstructured":"Pinedo, M.L.: Scheduling. Theory, Algorithms, and Systems, 5th edn. Springer, Heidelberg (2016). \nhttps:\/\/doi.org\/10.1007\/978-3-319-26580-3","edition":"5"},{"key":"52_CR25","doi-asserted-by":"publisher","first-page":"629","DOI":"10.1016\/j.ejor.2008.12.036","volume":"200","author":"B Roy","year":"2010","unstructured":"Roy, B.: Robustness in operational research and decision aiding: a multi-faceted issue. Eur. J. Oper. Res. 200, 629\u2013638 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"5","key":"52_CR26","doi-asserted-by":"publisher","first-page":"66","DOI":"10.3390\/a11050066","volume":"11","author":"YN Sotskov","year":"2018","unstructured":"Sotskov, Y.N., Egorova, N.G.: Single machine scheduling problem with interval processing times and total completion time objective. Algorithms 11(5), 66 (2018)","journal-title":"Algorithms"},{"issue":"4","key":"52_CR27","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1080\/03081070600574353","volume":"35","author":"Z Xu","year":"2006","unstructured":"Xu, Z., Yager, R.R.: Some geometric aggregation operators based on intuitionistic fuzzy sets. Int. J. Gen. Syst. 35(4), 417\u2013433 (2006)","journal-title":"Int. J. Gen. Syst."},{"issue":"4","key":"52_CR28","doi-asserted-by":"publisher","first-page":"1809","DOI":"10.1007\/s10845-017-1350-2","volume":"30","author":"J Zhang","year":"2017","unstructured":"Zhang, J., Ding, G., Zou, Y., Qin, S., Fu, J.: Review of job shop scheduling research and its new perspectives under Industry 4.0. J. Intell. Manuf. 30(4), 1809\u20131830 (2017). \nhttps:\/\/doi.org\/10.1007\/s10845-017-1350-2","journal-title":"J. Intell. Manuf."}],"container-title":["Communications in Computer and Information Science","Information Processing and Management of Uncertainty in Knowledge-Based Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-50143-3_52","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,6,5]],"date-time":"2020-06-05T23:39:23Z","timestamp":1591400363000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-50143-3_52"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030501426","9783030501433"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-50143-3_52","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"5 June 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"IPMU","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Information Processing and Management of Uncertainty in Knowledge-Based Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Lisbon","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"15 June 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"19 June 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"ipmu2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/ipmu2020.inesc-id.pt\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"213","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"146","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"27","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"69% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3,2","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"4","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"The IPMU 2020 was held virtually due to the coronavirus pandemic.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}