{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,20]],"date-time":"2025-12-20T22:15:44Z","timestamp":1766268944206,"version":"3.40.3"},"publisher-location":"Cham","reference-count":25,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030544096"},{"type":"electronic","value":"9783030544102"}],"license":[{"start":{"date-parts":[[2020,11,13]],"date-time":"2020-11-13T00:00:00Z","timestamp":1605225600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,11,13]],"date-time":"2020-11-13T00:00:00Z","timestamp":1605225600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-54410-2_16","type":"book-chapter","created":{"date-parts":[[2020,11,12]],"date-time":"2020-11-12T13:03:22Z","timestamp":1605186202000},"page":"221-234","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Competences and the Digital Transformation"],"prefix":"10.1007","author":[{"given":"C.","family":"Wolff","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"O.","family":"Mikhieieva","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Nuseibah","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,11,13]]},"reference":[{"key":"16_CR1","unstructured":"Agorio Comas MF, Toledo Gandarias N, Arraibi JR, Guti\u00e9rrez Terr\u00f3n A (2018) Maturity models\u2019 selection criteria for assessment in a specific organisation: a case study.In: Otegi JR, Toledo N, Taboada I (eds) Proceedings of the 1st international conference on research and education in project management \u2013 REPM 2018, Asociaci\u00f3n Espa\u00f1ola de Direcci\u00f3n e Ingenier\u00eda de Proyectos (AEIPRO), ISBN-13: 978-84-697-9972-7, Bilbao, Spain"},{"key":"16_CR2","unstructured":"Bassi LJ (1997) What works: assessment, development, and measurement. In: Bassi LJ, Russ-Eft D (eds) American Society for Training and Development, Alexandria, VA"},{"key":"16_CR3","unstructured":"Bertelsmann Stiftung (2010) Corporate Citizenship planen und messen mit der iooi-Methode, Bertelsmann Stiftung"},{"key":"16_CR4","volume-title":"Digital maturity & transformation report 2017","author":"A Back","year":"2017","unstructured":"Back A (2017) Digital maturity & transformation report 2017. IWI-HSG, St. Gallen"},{"issue":"2","key":"16_CR5","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1108\/IJMPB-10-2013-0049","volume":"7","author":"S Bushuyev","year":"2014","unstructured":"Bushuyev S, Wagner RF (2014) IPMA Delta and IPMA organisational competence baseline (OCB) new approaches in the field of project management maturity. Int J Man Projects Bus 7(2):302\u2013310","journal-title":"Int J Man Projects Bus"},{"key":"16_CR6","unstructured":"DAAD, A guide to results-oriented project planning and monitoring. https:\/\/www.daad.de\/derdaad\/unsereaufgaben\/entwicklungszusammenarbeit\/aufgaben\/en\/37674-results-oriented-monitoring\/. Accessed 10 June 2017"},{"key":"16_CR7","unstructured":"European Commission (2012) commission staff working document impact assessment - a reinforced european research area partnership for excellence and growth. European Commission, Brussels"},{"key":"16_CR8","unstructured":"Ferguson R (2012) The state of learning analytics in 2012: a review and future challenges. Technical Report KMI-12-01, Knowledge Media Institute, The Open University, UK. http:\/\/kmi.open.ac.uk\/publications\/techreport\/kmi-12\u201301"},{"key":"16_CR9","unstructured":"Heffernan MM, Flood PC (2000) An exploration of the relationships between the adoption of managerial competencies, organisational characteristics, human resource sophistication and performance in Irish organisations. J. Er Ind Train 24(2\/3\/4):128\u2013136"},{"key":"16_CR10","unstructured":"IPMA (2013) IPMA organisational competence baseline - the standard for moving organisations forward. International project management association (IPMA\u00ae) ed., 1.0th ed"},{"key":"16_CR11","unstructured":"IPMA (2015) Individual competence baseline 4th version (ICB4), 2015"},{"key":"16_CR12","unstructured":"i-scoop (2018) Digitization, digitalization and digital transformation: the differences. https:\/\/www.i-scoop.eu\/digitization-digitalization-digital-transformation-disruption\/"},{"key":"16_CR13","volume-title":"Strategic planning for project management using a project management maturity model","author":"H Kerzner","year":"2001","unstructured":"Kerzner H (2001) Strategic planning for project management using a project management maturity model. John Wiley & Sons, New York"},{"key":"16_CR14","doi-asserted-by":"publisher","unstructured":"Kosieradzka A (2017) Maturity model for production management, 2017. http:\/\/www.sciencedirect.com\/science\/article\/pii\/S1877705817312456 ISBN 1877-7058. https:\/\/doi.org\/10.1016\/j.proeng.2017.03.109","DOI":"10.1016\/j.proeng.2017.03.109"},{"key":"16_CR15","unstructured":"Mansfield RS (2005) Practical questions in building competency models. Workitect.inc"},{"key":"16_CR16","unstructured":"Mikhieieva O (2017) Competency breakdown structure for managing intercultural issues in international project teams. In: Proceedings of ProMAC2017, Munich, Germany, pp 977\u2013983"},{"key":"16_CR17","unstructured":"Mikhieieva O, Wolff C (2018) Competencies for managing the digital transformation for the setup of a master programme. In: Proceedings of the 1st international conference on research and education in project management \u2013 REPM 2018, Editors: Jose Ram\u00f3n Otegi, Nerea Toledo and Ianire Taboada, Asociaci\u00f3n Espa\u00f1ola de Direcci\u00f3n e Ingenier\u00eda de Proyectos (AEIPRO), ISBN-13: 978-84-697-9972-7, Bilbao, Spain"},{"key":"16_CR18","volume-title":"Project manager competency development framework","author":"PMI","year":"2017","unstructured":"PMI (2017) Project manager competency development framework. Project Management Institute Inc, Newtown Square Pennsylvania"},{"key":"16_CR19","unstructured":"Schuh, G., Anderl, R., Gausemeier J., ten Hompel, M., Wahlster, W. (2017). Industrie 4.0 Maturity Index. Managing the Digital Transformation of Companies (acatech STUDY), Munich: Herbert Utz Verlag 2017"},{"key":"16_CR20","doi-asserted-by":"publisher","unstructured":"Souza TFD, Gomes CFS (2015) Assessment of maturity in project management: a bibliometric tudy of main models. Procedia Comput. Sci. 55(Supplement C):92\u2013101. https:\/\/doi.org\/10.1016\/j.procs.2015.07.012","DOI":"10.1016\/j.procs.2015.07.012"},{"key":"16_CR21","doi-asserted-by":"publisher","unstructured":"Tarhan A, Turetken O, Reijers HA (2016) Business process maturity models: a systematic literature review. ISBN 0950-5849. https:\/\/doi.org\/10.1016\/j.infsof.2016.01.010","DOI":"10.1016\/j.infsof.2016.01.010"},{"key":"16_CR22","doi-asserted-by":"publisher","unstructured":"Turner R, Zolin R (2012) Forecasting success on large projects: developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames. Project Manage J 43(5). https:\/\/doi.org\/10.1002\/pmj.21289","DOI":"10.1002\/pmj.21289"},{"key":"16_CR23","unstructured":"Wolff, C. (2017). Managing the Digital Transformation \u2013 Digital & Projectized Master Education, Proceedings of the Dortmund International Research Conference 2017, Eds. Carsten Wolff, Christian Reimann, ISBN 978-3-00-058090-1, Dortmund"},{"key":"16_CR24","doi-asserted-by":"crossref","unstructured":"Wolff C, Otegi JR, Bushuyev S, Sachenko A, Ciutene R, Hussein B, Torvatn TA, Arras P, Reimann C, Dechange A, Toledo N, Nuseibeh A, Mikhieieva O (2017) Master level education in project management \u2013 the Eurompm model. In: 9th IEEE international conference on intelligent data acquisition and advanced computing systems: technology and applications, Bukarest, Romania","DOI":"10.1109\/IDAACS.2017.8095205"},{"key":"16_CR25","doi-asserted-by":"crossref","unstructured":"Wolff C, Nuseibah A (2017) A projectized path towards an effective industry-university-cluster: Ruhrvalley. In: Computer sciences and information technologies (CSIT), 2017 12th international scientific and technical conference on (Vol 2, pp 123\u2013131). IEEE","DOI":"10.1109\/STC-CSIT.2017.8099437"}],"container-title":["Lecture Notes in Management and Industrial Engineering","Project Management and Engineering Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-54410-2_16","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,12]],"date-time":"2020-11-12T13:39:40Z","timestamp":1605188380000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-54410-2_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,11,13]]},"ISBN":["9783030544096","9783030544102"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-54410-2_16","relation":{},"ISSN":["2198-0772","2198-0780"],"issn-type":[{"type":"print","value":"2198-0772"},{"type":"electronic","value":"2198-0780"}],"subject":[],"published":{"date-parts":[[2020,11,13]]},"assertion":[{"value":"13 November 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}