{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T01:45:11Z","timestamp":1742953511760,"version":"3.40.3"},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030579968"},{"type":"electronic","value":"9783030579975"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-57997-5_56","type":"book-chapter","created":{"date-parts":[[2020,8,24]],"date-time":"2020-08-24T23:28:02Z","timestamp":1598311682000},"page":"485-492","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A Method of Distributed Production Management for Highly-Distributed Flexible Job Shops"],"prefix":"10.1007","author":[{"given":"Daiki","family":"Yasuda","sequence":"first","affiliation":[]},{"given":"Eiji","family":"Morinaga","sequence":"additional","affiliation":[]},{"given":"Hidefumi","family":"Wakamatsu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,8,25]]},"reference":[{"issue":"12","key":"56_CR1","doi-asserted-by":"publisher","first-page":"3516","DOI":"10.1080\/00207543.2012.751509","volume":"51","author":"L Zheng","year":"2013","unstructured":"Zheng, L., Gao, L.: A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem. Int. J. Prod. Res. 51(12), 3516\u20133531 (2013)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"56_CR2","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1080\/09537289408919480","volume":"5","author":"E Szelke","year":"1994","unstructured":"Szelke, E., Kerr, R.M.: Knowledge-based reactive scheduling. Prod. Plann. Control 5(2), 124\u2013145 (1994)","journal-title":"Prod. Plann. Control"},{"key":"56_CR3","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1007\/978-0-387-34928-2_11","volume-title":"Artificial Intelligence in Reactive Scheduling","author":"M Garetti","year":"1995","unstructured":"Garetti, M., Taisch, M.: Using neural networks for reactive scheduling. In: Kerr, R., Szelke, E. (eds.) Artificial Intelligence in Reactive Scheduling. IAICT, pp. 146\u2013155. Springer, Boston, MA (1995). https:\/\/doi.org\/10.1007\/978-0-387-34928-2_11"},{"issue":"5","key":"56_CR4","doi-asserted-by":"publisher","first-page":"667","DOI":"10.1016\/S0952-1976(01)00025-2","volume":"14","author":"B Archimede","year":"2001","unstructured":"Archimede, B., Coudert, T.: Reactive scheduling using a multi-agent model: the SCEP framework. Eng. Appl. Artif. Intell. 14(5), 667\u2013683 (2001)","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"1\u20134","key":"56_CR5","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1007\/s00170-011-3482-4","volume":"59","author":"P Lou","year":"2012","unstructured":"Lou, P., Liu, Q., Zhou, Z., Wang, H.: Multi-agent-based proactive\u2013reactive scheduling for a job shop. Int. J. Adv. Manuf. Technol. 59(1\u20134), 311\u2013324 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"17","key":"56_CR6","doi-asserted-by":"publisher","first-page":"4211","DOI":"10.1080\/0020754031000149202","volume":"41","author":"I Sabuncuoglu","year":"2003","unstructured":"Sabuncuoglu, I., Kizilisik, O.B.: Reactive scheduling in a dynamic and stochastic FMS environment. Int. J. Prod. Res. 41(17), 4211\u20134231 (2003)","journal-title":"Int. J. Prod. Res."},{"key":"56_CR7","doi-asserted-by":"publisher","first-page":"1016","DOI":"10.2493\/jjspe.74.1016","volume":"74","author":"S Fujii","year":"2008","unstructured":"Fujii, S., Hibino, H., Iwamura, K., Tsumaya, A., Sashio, K.: Simulation of manufacturing system under ubiquitous environment. J. Jap. Soc. Precis. Eng. 74, 1016\u20131019 (2008). (In Japanese)","journal-title":"J. Jap. Soc. Precis. Eng."},{"key":"56_CR8","doi-asserted-by":"crossref","unstructured":"Fujii, S., et al.: A basic study on a highly distributed simulation of manufacturing systems under the ubiquitous environment. In: Proceedings of the ASME\/ISCIE 2012 International Symposium on Flexible Automation, ISFA2012-7208, pp. 321\u2013324 (2012)","DOI":"10.1115\/ISFA2012-7208"},{"key":"56_CR9","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1016\/j.promfg.2020.01.227","volume":"39","author":"E Morinaga","year":"2019","unstructured":"Morinaga, E., et al.: A study on highly-distributed manufacturing system simulation. Procedia Manuf. 39, 50\u201357 (2019)","journal-title":"Procedia Manuf."},{"issue":"3","key":"56_CR10","doi-asserted-by":"publisher","first-page":"588","DOI":"10.1299\/jamdsm.4.588","volume":"4","author":"T Kaihara","year":"2010","unstructured":"Kaihara, T., Fujii, N., Toide, S., Ishibashi, H., Nakano, T.: Optimization method using combinatorial auction for production scheduling with batch processing. J. Adv. Mech. Des. Syst. Manuf. 4(3), 588\u2013596 (2010)","journal-title":"J. Adv. Mech. Des. Syst. Manuf."},{"issue":"630","key":"56_CR11","doi-asserted-by":"publisher","first-page":"837","DOI":"10.1299\/kikaic.65.837","volume":"65","author":"T Matsumoto","year":"1999","unstructured":"Matsumoto, T., Kato, Y., Nagafune, S., Wakamatsu, H., Shirase, K., Arai, E.: Advanced autonomous distributed manufacturing system using active database. Trans. Jap. Soc. Mech. Eng. 65(630), 837\u2013843 (1999). (In Japanese)","journal-title":"Trans. Jap. Soc. Mech. Eng."},{"key":"56_CR12","unstructured":"T\u00f6nshoff, H-K., Seilonen, I., Teunis, G., Leit\u00e3o, P.: A mediator-based approach for decentralized production planning, scheduling, and monitoring. In: Proceedings of the CIRP International Seminar on Intelligent Computation in Manufacturing Engineering, pp. 113\u2013118 (2000)"},{"issue":"5","key":"56_CR13","doi-asserted-by":"publisher","first-page":"JAMDSM0072","DOI":"10.1299\/jamdsm.2014jamdsm0072","volume":"8","author":"E Morinaga","year":"2014","unstructured":"Morinaga, E., Takagi, A., Sakaguchi, Y., Wakamatsu, H., Arai, E.: Basic study on production scheduling method for highly-distributed manufacturing systems. J. Adv. Mech. Des. Syst. Manuf. 8(5), JAMDSM0072 (2014)","journal-title":"J. Adv. Mech. Des. Syst. Manuf."},{"key":"56_CR14","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"531","DOI":"10.1007\/978-3-662-44739-0_65","volume-title":"Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World","author":"E Morinaga","year":"2014","unstructured":"Morinaga, E., Sakaguchi, Y., Wakamatsu, H., Arai, E.: A distributed production scheduling method for highly-distributed manufacturing systems. In: Grabot, B., Vallespir, B., Gomes, S., Bouras, A., Kiritsis, D. (eds.) APMS 2014. IAICT, vol. 438, pp. 531\u2013538. Springer, Heidelberg (2014). https:\/\/doi.org\/10.1007\/978-3-662-44739-0_65"},{"key":"56_CR15","unstructured":"Morinaga, E., Nakamura, T., Wakamatsu, H., Arai, E.: A method for highly-distributed manufacturing systems. In: Proceedings of the 23rd International Conference on Production Research, ICPR23, Manila, Philippines, 31 July 2015\u20136 August 2015, p. 1100 (2015)"},{"issue":"5","key":"56_CR16","doi-asserted-by":"publisher","first-page":"181","DOI":"10.7791\/jspmee.6.181","volume":"6","author":"E Morinaga","year":"2017","unstructured":"Morinaga, E., Nakamura, T., Wakamatsu, H., Arai, E.: Flexible job-shop scheduling method for highly-distributed manufacturing systems. J. Smart Process. 6(5), 181\u2013187 (2017)","journal-title":"J. Smart Process."},{"key":"56_CR17","unstructured":"Yasuda, D., Morinaga, E., Wakamatsu, H.: Integrated production scheduling and simulation for highly-distributed manufacturing systems. In: Proceedings of 2020 JSPE Spring Conference, pp. 345\u2013346 (2020). (In Japanese)"},{"key":"56_CR18","doi-asserted-by":"crossref","unstructured":"Kopp, S., Dauz\u00e8re-P\u00e9r\u00e8s, S., Yugma, C.: Flexible job-shop scheduling with extended route flexibility for semiconductor manufacturing. In: Proceedings of the 2014 Winter Simulation Conference, pp. 2478\u20132489 (2014)","DOI":"10.1109\/WSC.2014.7020091"},{"key":"56_CR19","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1016\/j.ejor.2004.04.020","volume":"165","author":"R Alvarez-Valdes","year":"2005","unstructured":"Alvarez-Valdes, R., Fuertes, A., Tamarit, J.M., Gim\u00e9nez, G., Ramos, R.: A heuristic to schedule flexible job-shop in a glass factory. Eur. J. Oper. Res. 165, 525\u2013534 (2005)","journal-title":"Eur. J. Oper. Res."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Towards Smart and Digital Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-57997-5_56","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,25]],"date-time":"2024-08-25T00:21:26Z","timestamp":1724545286000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-57997-5_56"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030579968","9783030579975"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-57997-5_56","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"25 August 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Novi Sad","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Serbia","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 August 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 September 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"ConfTool","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"199","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"164","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"82% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}