{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,9]],"date-time":"2025-12-09T15:46:09Z","timestamp":1765295169584,"version":"3.40.3"},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030579968"},{"type":"electronic","value":"9783030579975"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-57997-5_65","type":"book-chapter","created":{"date-parts":[[2020,8,24]],"date-time":"2020-08-24T23:28:02Z","timestamp":1598311682000},"page":"565-572","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Planning Procurement Activities in ETO Projects"],"prefix":"10.1007","author":[{"given":"Kristina","family":"Kjersem","sequence":"first","affiliation":[]},{"given":"Marte","family":"Giske\u00f8deg\u00e5rd","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,8,25]]},"reference":[{"key":"65_CR1","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1007\/978-3-642-33980-6_35","volume-title":"Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management","author":"DEG Haartveit","year":"2012","unstructured":"Haartveit, D.E.G., Semini, M., Alfnes, E.: Integration alternatives for ship designers and shipyards. In: Frick, J., Laugen, B.T. (eds.) APMS 2011. IAICT, vol. 384, pp. 309\u2013316. Springer, Heidelberg (2012). https:\/\/doi.org\/10.1007\/978-3-642-33980-6_35"},{"key":"65_CR2","doi-asserted-by":"crossref","unstructured":"Held, T.: Supplier integration as an improvement driver: An analysis of some recent approaches in the shipbuilding industry. In: Engelhardt-Nowitzki, C., Nowitzki, O., Zsifkovits, H. (eds) Supply Chain Network Analysis, pp. 369\u2013384 (2010)","DOI":"10.1007\/978-3-8349-6000-9_22"},{"key":"65_CR3","unstructured":"Ciobanu, I.C., Neupane, G.P.: Phase-Based Project Management at Aker Yards: A Lean Shipbuilding Perspective in Logistics. Molde University College, Norway (2008)"},{"issue":"4","key":"65_CR4","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1080\/0953728042000238764","volume":"15","author":"M Rudberg","year":"2004","unstructured":"Rudberg, M., Wikner, J.: Mass customization in terms of the customer order decoupling point. Prod. Plann. Control 15(4), 445\u2013458 (2004)","journal-title":"Prod. Plann. Control"},{"key":"65_CR5","doi-asserted-by":"crossref","unstructured":"Powell, D., et al.: A New Set of Principles for Pursuing the Lean Ideal in Engineering-to-Order Manufacturers in CIRP Conference on Manufacturing Systems, Windsor, Ontario, Canada (2014)","DOI":"10.1016\/j.procir.2014.01.137"},{"key":"65_CR6","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"919","DOI":"10.1007\/978-3-319-51133-7_108","volume-title":"Advances in Production Management Systems. Initiatives for a Sustainable World","author":"K Kjersem","year":"2016","unstructured":"Kjersem, K., J\u00fcnge, G.H.: Categorizing engineer-to-order companies through their project execution strategy. In: N\u00e4\u00e4s, I., Vendrametto, O., Reis, J.M., Gon\u00e7alves, R.F., Silva, M.T., von Cieminski, G., Kiritsis, D. (eds.) APMS 2016. IAICT, vol. 488, pp. 919\u2013926. Springer, Cham (2016). https:\/\/doi.org\/10.1007\/978-3-319-51133-7_108"},{"issue":"1","key":"65_CR7","doi-asserted-by":"publisher","first-page":"59","DOI":"10.5957\/JSPD.160035","volume":"34","author":"M Semini","year":"2018","unstructured":"Semini, M., et al.: Offshoring Strategies in Norwegian Ship Production. J. Ship Prod. Design 34(1), 59\u201371 (2018)","journal-title":"J. Ship Prod. Design"},{"key":"65_CR8","unstructured":"Kjersem, K., Emblemsv\u00e5g, J.: Literature review on planning design and engineering activities in shipbuilding. In: 22nd Annual Conference of the International Group for Lean Construction IGLC 22, pp. 677\u2013688. Springer, Oslo (2014)"},{"key":"65_CR9","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1007\/978-3-319-66926-7_28","volume-title":"Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing","author":"K Kjersem","year":"2017","unstructured":"Kjersem, K., J\u00fcnge, Gabriele H., Emblemsv\u00e5g, J.: Project execution strategy and planning challenges. In: L\u00f6dding, H., Riedel, R., Thoben, K.-D., von Cieminski, G., Kiritsis, D. (eds.) APMS 2017. IAICT, vol. 514, pp. 243\u2013250. Springer, Cham (2017). https:\/\/doi.org\/10.1007\/978-3-319-66926-7_28"},{"issue":"2","key":"65_CR10","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/S0925-5273(99)00026-2","volume":"65","author":"C Hicks","year":"2000","unstructured":"Hicks, C., McGovern, T., Earl, C.F.: Supply chain management: A strategic issue en engineer to order manufacturing. Int. J. Prod. Econ. 65(2), 179\u2013190 (2000)","journal-title":"Int. J. Prod. Econ."},{"key":"65_CR11","first-page":"36","volume":"8","author":"S Sarhan","year":"2018","unstructured":"Sarhan, S., et al.: Institutional waste within the uk construction procurement context: a conceptual framework. Eng. Proj. Organ. J. 8, 36\u201364 (2018)","journal-title":"Eng. Proj. Organ. J."},{"key":"65_CR12","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"562","DOI":"10.1007\/978-3-030-30000-5_69","volume-title":"Advances in Production Management Systems. Production Management for the Factory of the Future","author":"M Shlopak","year":"2019","unstructured":"Shlopak, M., R\u00f8d, E., J\u00fcnge, G.H.: Purchasing strategies, tactics, and activities in engineer-to-order manufacturing. In: Ameri, F., Stecke, K.E., von Cieminski, G., Kiritsis, D. (eds.) APMS 2019. IAICT, vol. 566, pp. 562\u2013569. Springer, Cham (2019). https:\/\/doi.org\/10.1007\/978-3-030-30000-5_69"},{"key":"65_CR13","unstructured":"B\u00e4kstrand, J.: A method for customer-driven purchasing - aligning supplier interaction and customer-driven manufacturing. Department of Industrial Engineering and Management 2012, School of Engineering, J\u00f5nk\u00f5ping University, Sweden"},{"issue":"1","key":"65_CR14","first-page":"3","volume":"6","author":"J Wikner","year":"2017","unstructured":"Wikner, J., B\u00e4kstrand, J.: Triadic perspective on customization and supplier interaction in customer-driven manufacturing Prod. Manuf. Res. 6(1), 3\u201325 (2017)","journal-title":"Manuf. Res."},{"issue":"3","key":"65_CR15","first-page":"261","volume":"225","author":"MH Mello","year":"2011","unstructured":"Mello, M.H., Strandhagen, O.J.: Supply chain management in the shipbuilding industry: challenges and perspectives. J. Eng. Maritime Environ. 225(3), 261\u2013270 (2011)","journal-title":"J. Eng. Maritime Environ."},{"key":"65_CR16","unstructured":"PMBOK\u00ae: A guide to the Project Management Body of Knowledge (PMBOK guide), 5th edn. P.M. Institute. 2013a: Project Management Institute (2013)"},{"key":"65_CR17","doi-asserted-by":"publisher","first-page":"494","DOI":"10.1016\/S2212-5671(15)00204-X","volume":"21","author":"YJ-T Zidane","year":"2015","unstructured":"Zidane, Y.J.-T., et al.: Barriers and challenges in employing of concurrent engineering within the Norwegian construction projects. Procedia Econ. Finance 21, 494\u2013501 (2015)","journal-title":"Procedia Econ. Finance"},{"issue":"2","key":"65_CR18","first-page":"10","volume":"49","author":"DJ Fernandez","year":"2009","unstructured":"Fernandez, D.J., Fernandez, J.D.: Agile project management - agilism versus traditional approaches. J. Comput. Inf. Syst. 49(2), 10\u201317 (2009)","journal-title":"J. Comput. Inf. Syst."},{"issue":"6","key":"65_CR19","doi-asserted-by":"publisher","first-page":"545","DOI":"10.1080\/09511920050195977","volume":"13","author":"D Little","year":"2000","unstructured":"Little, D., et al.: Integrated planning and scheduling in the engineer-to-order sector. Int. J. Comput. Integr. Manuf. 13(6), 545\u2013554 (2000)","journal-title":"Int. J. Comput. Integr. Manuf."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Towards Smart and Digital Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-57997-5_65","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,25]],"date-time":"2024-08-25T00:22:28Z","timestamp":1724545348000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-57997-5_65"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030579968","9783030579975"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-57997-5_65","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"25 August 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Novi Sad","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Serbia","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 August 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 September 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"ConfTool","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"199","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"164","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"82% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}