{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,20]],"date-time":"2025-11-20T18:45:19Z","timestamp":1763664319399,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030579968"},{"type":"electronic","value":"9783030579975"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-57997-5_67","type":"book-chapter","created":{"date-parts":[[2020,8,24]],"date-time":"2020-08-24T23:28:02Z","timestamp":1598311682000},"page":"581-589","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Backlog Oriented Bottleneck Management \u2013 Practical Guide for Production Managers"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4750-9296","authenticated-orcid":false,"given":"Roman","family":"Ungern-Sternberg","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9607-8897","authenticated-orcid":false,"given":"Christian","family":"Fries","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5307-3444","authenticated-orcid":false,"given":"Hans-Hermann","family":"Wiendahl","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,8,25]]},"reference":[{"issue":"3","key":"67_CR1","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J Adams","year":"1988","unstructured":"Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job shop scheduling. Manag. Sci. 34(3), 391\u2013401 (1988)","journal-title":"Manag. Sci."},{"key":"67_CR2","unstructured":"Cox, J.F., Blackstone, J., H.: Apics Dictionary, 9th edn. Amer Production & Inventory (1998)"},{"key":"67_CR3","unstructured":"Goldratt, E.M.; Cox, J.: The goal. A process of ongoing improvement. Fourth revised edition, 30th anniversary edition. North River Press, Great Barrington, MA (2014)"},{"key":"67_CR4","volume-title":"Handbook of Manufacturing Control","author":"H L\u00f6dding","year":"2012","unstructured":"L\u00f6dding, H.: Handbook of Manufacturing Control. Springer Publishing, New York, USA (2012)"},{"key":"67_CR5","doi-asserted-by":"crossref","unstructured":"Nyhuis, P., Wiendahl, H.-P.: Fundamentals of Production Logistics. Theory, Tools and Applications. Springer, Berlin (2009)","DOI":"10.1007\/978-3-540-34211-3"},{"key":"67_CR6","doi-asserted-by":"crossref","unstructured":"Nyhuis, P.; Wiendahl, H.-P.: Logistische Kennlinien. Grundlagen, Werkzeuge und Anwendungen. 3. Aufl. Springer Vieweg (VDI-Buch), Berlin (2012)","DOI":"10.1007\/978-3-540-92839-3"},{"key":"67_CR7","unstructured":"Petermann, D.: Modellbasierte Produktionsregelung. Diss. Universit\u00e4t Hannover 1995, published in: Fortschr.-Berichte VDI, Reihe 20, Nr. 193, VDI Verlag, D\u00fcsseldorf (1996)"},{"key":"67_CR8","doi-asserted-by":"crossref","unstructured":"Roser, C., Nakano, M., Tanaka, M.: A practical bottleneck detection method. In: Winter Simulation Conference Proceedings, vol. 2, pp. 949\u2013953 (2001)","DOI":"10.1109\/WSC.2001.977398"},{"key":"67_CR9","unstructured":"Roser, C., Nakano, M., Tanaka, M.: Detecting Shifting Bottlenecks. In: International Symposium on Scheduling. Hamamatsu, Japan, pp. 59\u201362 (2002)"},{"key":"67_CR10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-48334-3_1","volume-title":"Integrales Logistikmanagement","author":"P Sch\u00f6nsleben","year":"2016","unstructured":"Sch\u00f6nsleben, P.: Integrales Logistikmanagement. Springer, Heidelberg (2016). https:\/\/doi.org\/10.1007\/978-3-662-48334-3_1"},{"issue":"4","key":"67_CR11","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1080\/07421222.1996.11518099","volume":"12","author":"RY Wang","year":"1996","unstructured":"Wang, R.Y., Strong, D.M.: Beyond accuracy: what data quality means to data consumers. J. Manag. Inf. Syst. 12(4), 5\u201333 (1996)","journal-title":"J. Manag. Inf. Syst."},{"issue":"1","key":"67_CR12","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1016\/j.cirp.2007.05.106","volume":"56","author":"H-H Wiendahl","year":"2007","unstructured":"Wiendahl, H.-H.: Turbulence germs and their impact on planning and control \u2013 root causes and solutions for PPC design. CIRP Ann. 56(1), 443\u2013446 (2007)","journal-title":"CIRP Ann."},{"key":"67_CR13","unstructured":"Wiendahl, H.-H.: Situative Konfiguration des Auftragsmanagements im turbulenten Umfeld. Heimsheim: Jost-Jetter, 2002. (IPA-IAO \u2013 Forschung und Praxis, Nr. 358). Zugl. Stuttgart, Univ., Diss. (2002)"},{"key":"67_CR14","doi-asserted-by":"crossref","unstructured":"Wiendahl, H.-H.: Auftragsmanagement der industriellen Produktion. Grundlagen, Konfiguration, Einf\u00fchrung. Springer (VDI-Buch), Berlin, Heidelberg (2011)","DOI":"10.1007\/978-3-642-19149-7"},{"key":"67_CR15","doi-asserted-by":"crossref","unstructured":"Wiendahl, H.-H., Steinberg, F.: Montageversorgungsanalyse in der Einzelfertigung. Ist-Situation, Potentiale und Ursachen. WT Werkstattstechnik 105(9), 597\u2013603 (2016)","DOI":"10.37544\/1436-4980-2015-09-39"},{"key":"67_CR16","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-57743-7","volume-title":"Load-Oriented Manufacturing Control","author":"H-P Wiendahl","year":"1995","unstructured":"Wiendahl, H.-P.: Load-Oriented Manufacturing Control. Springer, Heidelberg (1995)"},{"key":"67_CR17","unstructured":"Wiendahl, H.-P., Nyhuis, P.: Engpassorientierte Logistikanalyse. Methoden zur kurzfristigen Leistungssteigerung in Produktionsprozessen. TCW-Verl., M\u00fcnchen (1998)"},{"key":"67_CR18","unstructured":"Yu, K.-W.: Terminkennlinie. Eine Beschreibungsmethodik f\u00fcr die Terminabweichung im Produktionsbereich. Diss. Universit\u00e4t Hannover 2001, published in: Fortschritt-Berichte VDI, Reihe 2, Nr. 576, VDI-Verlag, D\u00fcsseldorf (2001)"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Towards Smart and Digital Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-57997-5_67","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,25]],"date-time":"2024-08-25T00:22:52Z","timestamp":1724545372000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-57997-5_67"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030579968","9783030579975"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-57997-5_67","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"25 August 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Novi Sad","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Serbia","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 August 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 September 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"ConfTool","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"199","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"164","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"82% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}