{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T22:02:54Z","timestamp":1743026574546,"version":"3.40.3"},"publisher-location":"Cham","reference-count":22,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030618339"},{"type":"electronic","value":"9783030618346"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-61834-6_16","type":"book-chapter","created":{"date-parts":[[2020,10,7]],"date-time":"2020-10-07T04:33:06Z","timestamp":1602045186000},"page":"181-193","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A Fast Pareto Approach to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1757-6885","authenticated-orcid":false,"given":"Andr\u00e9s A.","family":"Garc\u00eda-Le\u00f3n","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5874-3091","authenticated-orcid":false,"given":"William F.","family":"Torres Tapia","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,10,8]]},"reference":[{"key":"16_CR1","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1016\/j.asoc.2017.04.060","volume":"58","author":"M Zandieh","year":"2017","unstructured":"Zandieh, M., Khatami, A., Rahmati, S.: Flexible job shop scheduling under condition-based maintenance: improved version of imperialist competitive algorithm. Appl. Soft Comput. J. 58, 449\u2013464 (2017)","journal-title":"Appl. Soft Comput. J."},{"issue":"1\u20132","key":"16_CR2","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1007\/s10479-017-2594-0","volume":"269","author":"S Rahmati","year":"2018","unstructured":"Rahmati, S., Ahmadi, A., Govindan, K.: A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach. Ann. Oper. Res. 269(1\u20132), 583\u2013621 (2018)","journal-title":"Ann. Oper. Res."},{"issue":"2","key":"16_CR3","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"C Cassady","year":"2005","unstructured":"Cassady, C., Kutanoglu, E.: Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans. Reliab. 54(2), 304\u2013309 (2005)","journal-title":"IEEE Trans. Reliab."},{"key":"16_CR4","first-page":"140","volume":"66","author":"G Finke","year":"2017","unstructured":"Finke, G., Gara-Ali, A., Espinouse, M., Jost, V., Moncel, J.: Unified matrix approach to solve production-maintenance problems on a single machine. Omega (United Kingdom) 66, 140\u2013146 (2017)","journal-title":"Omega (United Kingdom)"},{"issue":"4","key":"16_CR5","doi-asserted-by":"publisher","first-page":"1207","DOI":"10.1007\/s10845-010-0425-0","volume":"23","author":"M Rebai","year":"2012","unstructured":"Rebai, M., Kacem, I., Adjallah, K.: Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods. J. Intell. Manuf. 23(4), 1207\u20131224 (2012)","journal-title":"J. Intell. Manuf."},{"key":"16_CR6","doi-asserted-by":"publisher","first-page":"106320","DOI":"10.1016\/j.cie.2020.106320","volume":"141","author":"D Lei","year":"2020","unstructured":"Lei, D., Liu, M.: An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. Comput. Ind. Eng. 141, 106320 (2020)","journal-title":"Comput. Ind. Eng."},{"issue":"8","key":"16_CR7","doi-asserted-by":"publisher","first-page":"3171","DOI":"10.1007\/s12652-018-1032-8","volume":"10","author":"J Shen","year":"2018","unstructured":"Shen, J., Zhu, Y.: A parallel-machine scheduling problem with periodic maintenance under uncertainty. J. Ambient Intell. Humaniz. Comput. 10(8), 3171\u20133179 (2018). https:\/\/doi.org\/10.1007\/s12652-018-1032-8","journal-title":"J. Ambient Intell. Humaniz. Comput."},{"key":"16_CR8","doi-asserted-by":"publisher","first-page":"106369","DOI":"10.1016\/j.cie.2020.106369","volume":"143","author":"P P\u00e9rez-Gonz\u00e1lez","year":"2020","unstructured":"P\u00e9rez-Gonz\u00e1lez, P., Fern\u00e1ndez-Viagas, V., Framinan, J.: Permutation flowshop scheduling with periodic maintenance and makespan objective. Comput. Ind. Eng. 143, 106369 (2020)","journal-title":"Comput. Ind. Eng."},{"issue":"4","key":"16_CR9","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1080\/0305215X.2018.1485903","volume":"51","author":"H Miyata","year":"2019","unstructured":"Miyata, H., Nagano, M., Gupta, J.: Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Eng. Optim. 51(4), 680\u2013698 (2019)","journal-title":"Eng. Optim."},{"key":"16_CR10","doi-asserted-by":"publisher","first-page":"104943","DOI":"10.1016\/j.cor.2020.104943","volume":"122","author":"R Boufellouh","year":"2020","unstructured":"Boufellouh, R., Belkaid, F.: Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem. Comput. Oper. Res. 122, 104943 (2020)","journal-title":"Comput. Oper. Res."},{"key":"16_CR11","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/j.cie.2019.05.034","volume":"135","author":"H Miyata","year":"2019","unstructured":"Miyata, H., Nagano, M., Gupta, J.: Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Comput. Ind. Eng. 135, 79\u2013104 (2019)","journal-title":"Comput. Ind. Eng."},{"issue":"6","key":"16_CR12","doi-asserted-by":"publisher","first-page":"683","DOI":"10.1007\/s10845-008-0157-6","volume":"20","author":"B Naderi","year":"2009","unstructured":"Naderi, B., Zandieh, M., Fatemi Ghomi, S.: A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. J. Intell. Manuf. 20(6), 683\u2013694 (2009)","journal-title":"J. Intell. Manuf."},{"issue":"1\u20134","key":"16_CR13","first-page":"173","volume":"77","author":"A Khamseh","year":"2014","unstructured":"Khamseh, A., Jolai, F., Babaei, M.: Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops. Int. J. Adv. Manuf. Technol. 77(1\u20134), 173\u2013185 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"13","key":"16_CR14","doi-asserted-by":"publisher","first-page":"3891","DOI":"10.1080\/00207543.2010.492405","volume":"49","author":"M Ben Ali","year":"2011","unstructured":"Ben Ali, M., Sassi, M., Gossa, M., Harrath, Y.: Simultaneous scheduling of production and maintenance tasks in the job shop. Int. J. Prod. Res. 49(13), 3891\u20133918 (2011)","journal-title":"Int. J. Prod. Res."},{"issue":"1\u20132","key":"16_CR15","doi-asserted-by":"publisher","first-page":"170","DOI":"10.1007\/s00170-008-1693-0","volume":"43","author":"B Naderi","year":"2009","unstructured":"Naderi, B., Zandieh, M., Fatemi Ghomi, S.: Scheduling sequence-dependent setup time job shops with preventive maintenance. Int. J. Adv. Manuf. Technol. 43(1\u20132), 170\u2013181 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"16_CR16","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.swevo.2018.02.010","volume":"40","author":"S Rahmati","year":"2018","unstructured":"Rahmati, S., Ahmadi, A., Karimi, B.: Multi-objective evolutionary simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem. Swarm Evol. Comput. 40, 255\u2013271 (2018)","journal-title":"Swarm Evol. Comput."},{"issue":"2","key":"16_CR17","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1007\/s10732-008-9094-y","volume":"16","author":"C Vela","year":"2010","unstructured":"Vela, C., Varela, R., Gonz\u00e1lez, M.: Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times. J. Heuristics 16(2), 139\u2013165 (2010)","journal-title":"J. Heuristics"},{"issue":"4","key":"16_CR18","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1007\/s10951-017-0532-2","volume":"20","author":"R B\u00fcrgy","year":"2017","unstructured":"B\u00fcrgy, R.: A neighborhood for complex job shop scheduling problems with regular objectives. J. Sched. 20(4), 391\u2013422 (2017). https:\/\/doi.org\/10.1007\/s10951-017-0532-2","journal-title":"J. Sched."},{"issue":"1","key":"16_CR19","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.ejor.2011.01.046","volume":"212","author":"Y Mati","year":"2011","unstructured":"Mati, Y., Dauz\u00e8re-P\u00e9r\u00e8s, S., Lahlou, C.: A general approach for optimizing regular criteria in the job-shop scheduling problem. Eur. J. Oper. Res. 212(1), 33\u201342 (2011)","journal-title":"Eur. J. Oper. Res."},{"key":"16_CR20","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1016\/j.cor.2019.04.012","volume":"108","author":"AA Garc\u00eda-Le\u00f3n","year":"2019","unstructured":"Garc\u00eda-Le\u00f3n, A.A., Dauz\u00e8re-P\u00e9r\u00e8s, S., Mati, Y.: An efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteria. Comput. Oper. Res. 108, 187\u2013200 (2019)","journal-title":"Comput. Oper. Res."},{"key":"16_CR21","series-title":"Communications in Computer and Information Science","doi-asserted-by":"publisher","first-page":"764","DOI":"10.1007\/978-3-030-31019-6_64","volume-title":"Applied Computer Sciences in Engineering","author":"AA Garc\u00eda-Le\u00f3n","year":"2019","unstructured":"Garc\u00eda-Le\u00f3n, A.A., Torres Tapia, W.F.: A general local search pareto approach with regular criteria for solving the job-shop scheduling problem multi-resource resource flexibility with linear routes. In: Figueroa-Garc\u00eda, J.C., Duarte-Gonz\u00e1lez, M., Jaramillo-Isaza, S., Orjuela-Ca\u00f1on, A.D., D\u00edaz-Gutierrez, Y. (eds.) WEA 2019. CCIS, vol. 1052, pp. 764\u2013775. Springer, Cham (2019). https:\/\/doi.org\/10.1007\/978-3-030-31019-6_64"},{"issue":"2","key":"16_CR22","first-page":"109","volume":"30","author":"M Singer","year":"1998","unstructured":"Singer, M., Pinedo, M.: A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops. IIE Trans. 30(2), 109\u2013118 (1998)","journal-title":"IIE Trans."}],"container-title":["Communications in Computer and Information Science","Applied Computer Sciences in Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-61834-6_16","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,24]],"date-time":"2021-04-24T02:44:52Z","timestamp":1619232292000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-61834-6_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030618339","9783030618346"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-61834-6_16","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"8 October 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"WEA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Workshop on Engineering Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Bogota","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Colombia","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7 October 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10 October 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"woea2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/ieee.udistrital.edu.co\/wea2020","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Easychair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"136","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"32","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"12","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"24% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.68","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.41","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"No","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Due to the COVID-19 pandemic the conference was held online","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}