{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,30]],"date-time":"2026-05-30T01:09:57Z","timestamp":1780103397412,"version":"3.54.0"},"publisher-location":"Cham","reference-count":30,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030624118","type":"print"},{"value":"9783030624125","type":"electronic"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-62412-5_53","type":"book-chapter","created":{"date-parts":[[2020,11,16]],"date-time":"2020-11-16T00:04:47Z","timestamp":1605485087000},"page":"644-653","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Leveraging on Enterprise Building Information Models in Health Care Services: The Case of St. Olav University Hospital"],"prefix":"10.1007","author":[{"given":"Sobah Abbas","family":"Petersen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Tor \u00c5smund","family":"Evjen","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Seyed Reza","family":"Hosseini Raviz","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"John","family":"Krogstie","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2020,11,16]]},"reference":[{"key":"53_CR1","first-page":"223","volume-title":"Formal Methods in Architecture and Urbanism","author":"JVD Zwart","year":"2018","unstructured":"Zwart, J.V.D., Evjen, T.\u00c5.: Data driven simulation model for hospital architecture: modelling and simulating clinical process, architectural layout and patient logistics in a hospital\u2019s building information model. In: Viana, D.L., Morais, F., Vaz, J.V. (eds.) Formal Methods in Architecture and Urbanism, pp. 223\u2013236. Cambridge Scholars Publishing, Newcastle upon Tyne (2018)"},{"key":"53_CR2","doi-asserted-by":"publisher","DOI":"10.4324\/9781315652474","volume-title":"Delivering Value with BIM \u2013 A Whole-of-life Approach","author":"A Sanchez","year":"2016","unstructured":"Sanchez, A., Hampson, K., Vaux, S.: Delivering Value with BIM \u2013 A Whole-of-life Approach. Routledge, New York (2016)"},{"key":"53_CR3","unstructured":"Soliman, A.A., Khodeir, L.M.: Efficient Stakeholders Management: The Impact of Applying the Integrated Building Information Modeling\/Facility Management Approach, A Literature Review. Sustainable Mega Projects, Egypt (2016)"},{"key":"53_CR4","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.autcon.2013.10.023","volume":"38","author":"R Volk","year":"2014","unstructured":"Volk, R., Stengel, J., Schultmann, F.: Building information modeling (BIM) for existing buildings \u2013 literature review and future needs. Autom. Constr. 38, 109\u2013127 (2014)","journal-title":"Autom. Constr."},{"key":"53_CR5","unstructured":"Evjen, T.\u00c5.: Smart hospital and enterprise BIM. In: 7th International Megaprojects Workshop. University of Quebec, Montreal, Canada (2019)"},{"key":"53_CR6","volume-title":"Case Study Research: Design and Methods","author":"RK Yin","year":"2014","unstructured":"Yin, R.K.: Case Study Research: Design and Methods. SAGE Publications, Thousand Oaks (2014)"},{"key":"53_CR7","doi-asserted-by":"publisher","first-page":"625","DOI":"10.4028\/www.scientific.net\/AMM.567.625","volume":"567","author":"AA Latiffi","year":"2014","unstructured":"Latiffi, A.A., Brahim, J., Fathi, M.S.: The development of building information modeling (BIM) definition. Appl. Mech. Mater. 567, 625\u2013630 (2014)","journal-title":"Appl. Mech. Mater."},{"key":"53_CR8","first-page":"919","volume-title":"The Sustainable City XI, WIT Transactions on Ecology and the Environment","author":"C Allen","year":"2016","unstructured":"Allen, C., Shakantu, W.: The BIM revolution: a literature review on rethinking the business of construction. In: Galiano-Garrigos, A. (ed.) The Sustainable City XI, WIT Transactions on Ecology and the Environment, pp. 919\u2013930. WIT Press, Southampton (2016)"},{"key":"53_CR9","unstructured":"Sanchez, A., Hampson, K., Mohamed, S.: Perth Children\u2019s Hospital Case Study Report. Sustainable Built Environment National Research Centre"},{"key":"53_CR10","unstructured":"Kelly, G., Serginson, M., Lockley, S., Dawood, N., Kassem, M.: BIM for facility management and a review and a case study investigating the value and challenges. In: 13th Int. Conference on Construction Applications of Virtual Reality, London, UK (2013)"},{"key":"53_CR11","unstructured":"Reehaug, B.: BIM \u2013 Et Hjelpeverkt\u00f8y for renholdskontrakter? H\u00f8gskolen i Gj\u00f8vik (2015)"},{"key":"53_CR12","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1108\/BEPAM-03-2014-0019","volume":"5","author":"P Love","year":"2015","unstructured":"Love, P., Zhou, J., Matthews, J., Sing, C., Carey, B.: A systems information model for managing electrical, control, and instrumentation assets. Built Environ. Project Asset Manage. 5, 278\u2013289 (2015)","journal-title":"Built Environ. Project Asset Manage."},{"key":"53_CR13","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1108\/BEPAM-02-2014-0011","volume":"5","author":"PED Love","year":"2015","unstructured":"Love, P.E.D., Matthews, J., Lockley, S.: BIM for built asset management. Built Environ. Project Asset Manage. 5, 261\u2013277 (2015)","journal-title":"Built Environ. Project Asset Manage."},{"key":"53_CR14","first-page":"1","volume":"13","author":"A Galliano-Garrig\u00f3s","year":"2018","unstructured":"Galliano-Garrig\u00f3s, A., And\u00fajar-Montoya, M.D.: Building information modelling in operations of maintenance at the University of Alicante. Int. J. Sus. Dev. Plann. 13, 1\u201311 (2018)","journal-title":"Int. J. Sus. Dev. Plann."},{"key":"53_CR15","unstructured":"Sheth, A.Z., Price, A.D.F., Glass, J.: BIM and refurbishment of existing healthcare facilities. In: Egbu, C. (ed.) Proceedings of the 26th Annual ARCOM Conference, Leeds, United Kingdom, vol. 2, pp. 1497\u20131506 (2010)"},{"key":"53_CR16","unstructured":"Krugler, P., et al.: Asset management literature review and potential applications of simulation, optimization, and decision analysis techniques for right-of-way and transportation planning and programming. Texas Transportation Institute The Texas A&M University System (2007)"},{"issue":"6","key":"53_CR17","doi-asserted-by":"publisher","first-page":"839","DOI":"10.1016\/j.ijproman.2019.05.004","volume":"37","author":"M Oraee","year":"2019","unstructured":"Oraee, M., Hosseini, M.R., Edwards, D.J., Li, H., Papadonikolaki, E., Cao, D.: Collaboration barriers in BIM-based construction networks: a conceptual model. Int. J. Project Manage. 37(6), 839\u2013854 (2019)","journal-title":"Int. J. Project Manage."},{"key":"53_CR18","doi-asserted-by":"crossref","unstructured":"Merschbrock, C., Munkvold, B.E.: Succeeding with building information modeling: a case study of bim diffusion in a healthcare construction project. In: 47th Hawaii International Conference on System Science, Hawaii (2014)","DOI":"10.1109\/HICSS.2014.490"},{"key":"53_CR19","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1007\/s10845-005-1656-3","volume":"16","author":"L Camarinha-Matos","year":"2005","unstructured":"Camarinha-Matos, L., Afsarmanesh, H.: Collaborative networks: a new scientific discipline. J. Intell. Manuf. 16, 439\u2013452 (2005)","journal-title":"J. Intell. Manuf."},{"key":"53_CR20","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1007\/978-3-642-40543-3_49","volume-title":"Collaborative Systems for Reindustrialization","author":"O Noran","year":"2013","unstructured":"Noran, O.: Enhancing collaborative healthcare synergy. In: Camarinha-Matos, L.M., Scherer, R.J. (eds.) PRO-VE 2013. IAICT, vol. 408, pp. 459\u2013467. Springer, Heidelberg (2013). https:\/\/doi.org\/10.1007\/978-3-642-40543-3_49"},{"key":"53_CR21","series-title":"Lecture Notes in Business Information Processing","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1007\/978-3-642-16782-9_7","volume-title":"The Practice of Enterprise Modeling","author":"SA Petersen","year":"2010","unstructured":"Petersen, S.A., Bach, G., Svarlein, A.B.: Patient care across health care institutions: an enterprise modelling approach. In: van Bommel, P., Hoppenbrouwers, S., Overbeek, S., Proper, E., Barjis, J. (eds.) PoEM 2010. LNBIP, vol. 68, pp. 91\u2013105. Springer, Heidelberg (2010). https:\/\/doi.org\/10.1007\/978-3-642-16782-9_7"},{"key":"53_CR22","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1007\/978-3-319-24141-8_21","volume-title":"Risks and Resilience of Collaborative Networks","author":"M G\u00fcrtler","year":"2015","unstructured":"G\u00fcrtler, M., Baumg\u00e4rtel, K., Scherer, Raimar J.: Towards a workflow-driven multi-model BIM collaboration platform. In: Camarinha-Matos, L., B\u00e9naben, F., Picard, W. (eds.) PRO-VE 2015. IAICT, vol. 463, pp. 235\u2013242. Springer, Cham (2015). https:\/\/doi.org\/10.1007\/978-3-319-24141-8_21"},{"key":"53_CR23","unstructured":"http:\/\/open.bimreal.com\/bim\/index.php\/"},{"key":"53_CR24","unstructured":"Tenstad, A., Halvor, B.M., Thorkildsen, M.K., Eidem, M.R., \u00d8degaard, O.K., Latif, S.M.: Smart Cleaning. Dept. of Computer Science, MSc. Norwegian University of Science and Technology (2018)"},{"key":"53_CR25","unstructured":"J\u00f8rstad, F.K.: Smart Hospital: Indoor positioning with BIM. Dept. of Computer Science, Specialisation Project. Norwegian University of Science and Technology, Trondheim, Norway (2016)"},{"key":"53_CR26","unstructured":"Hestman, L.M.: The Potential of Utilizing BIM Models With the WebGL Technology for Building Virtual Environments: A Web-Based Prototype Within the Virtual Hospital Field. Dept. of Computer Science. Norwegian University of Science and Technology, Trondheim, Norway (2015)"},{"key":"53_CR27","unstructured":"Aksnes, E.\u00d8.: Indoor Positioning Integrated in EBIM. Norwegian University of Science and Technology, Trondheim, Norway (2016)"},{"key":"53_CR28","unstructured":"Azhar, S., Hein, M.F., Blake, S.: Building information modeling (BIM): benefits, risks and challenges. In: ASC Annual Conference (2008)"},{"key":"53_CR29","unstructured":"Criminale, A., Langar, S.: Challenges with BIM implementation: a review of literature. In: 53rd ASC Annual International Conference Proceedings (2017)"},{"key":"53_CR30","unstructured":"Huse, P.: FDVU\/FM med EDMmodelserver. BuildingSMART members\u2019 meeting. Jotne EPM Technology AS (2015)"}],"container-title":["IFIP Advances in Information and Communication Technology","Boosting Collaborative Networks 4.0"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-62412-5_53","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,11,16]],"date-time":"2024-11-16T00:19:32Z","timestamp":1731716372000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-62412-5_53"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030624118","9783030624125"],"references-count":30,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-62412-5_53","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"16 November 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"PRO-VE","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Working Conference on Virtual Enterprises","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Valencia","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Spain","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"23 November 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"25 November 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"21","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"pro-ve2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.pro-ve.org","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Double-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"135","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"53","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"39% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"4","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"No","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"The conference was held virtually.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}