{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T00:23:32Z","timestamp":1743035012064,"version":"3.40.3"},"publisher-location":"Cham","reference-count":10,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030627454"},{"type":"electronic","value":"9783030627461"}],"license":[{"start":{"date-parts":[[2020,11,5]],"date-time":"2020-11-05T00:00:00Z","timestamp":1604534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,11,5]],"date-time":"2020-11-05T00:00:00Z","timestamp":1604534400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-62746-1_48","type":"book-chapter","created":{"date-parts":[[2020,11,4]],"date-time":"2020-11-04T09:09:17Z","timestamp":1604480957000},"page":"327-332","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Effective Control Method of the Whole Process Project Cost Based on BIM"],"prefix":"10.1007","author":[{"given":"Linlin","family":"Yu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,11,5]]},"reference":[{"key":"48_CR1","doi-asserted-by":"publisher","first-page":"140","DOI":"10.1016\/j.conbuildmat.2018.11.085","volume":"8","author":"L Jieying","year":"2019","unstructured":"Jieying, L.: Key points and control of construction project cost budget control. Build. Mater. Decoration 8, 140\u2013141 (2019)","journal-title":"Build. Mater. Decoration"},{"issue":"8","key":"48_CR2","first-page":"49","volume":"46","author":"Q Jie","year":"2017","unstructured":"Jie, Q., Hongcheng, L., Haixia, J.: How to strengthen the construction cost management of salt chemical enterprises. Salt Sci. Chem. Ind. 46(8), 49\u201351 (2017)","journal-title":"Salt Sci. Chem. Ind."},{"key":"48_CR3","unstructured":"Yang, C.: The importance of cost control in the whole process of construction project management. Green Build. Mater. 137(07), 214\u2009+\u2009216 (2018)"},{"issue":"9","key":"48_CR4","first-page":"44","volume":"26","author":"S Botong","year":"2016","unstructured":"Botong, S., Jie, Z., Yong, W., Yaning, L.: Analysis of the relevance and ripple effect of Beijing real estate industry based on input-output model. Eng. Econ. 26(9), 44\u201348 (2016)","journal-title":"Eng. Econ."},{"issue":"2","key":"48_CR5","first-page":"76","volume":"42","author":"Y Yonghong","year":"2017","unstructured":"Yonghong, Y., Wanzhong, Y., Xuancang, W.: Research on cost control of highway overhaul project. Highw. Eng. 42(2), 76\u201380 (2017)","journal-title":"Highw. Eng."},{"key":"48_CR6","unstructured":"Pan, Y.: Cost control of shield tunnel construction in urban tunnel construction. Rail. Eng. Technol. Econ. 33, 56\u201368 (2018)"},{"issue":"3","key":"48_CR7","first-page":"1","volume":"14","author":"Z Dexin","year":"2016","unstructured":"Dexin, Z.: Analysis of engineering cost control points of EPC general contracting project. Min. Eng. 14(3), 1\u20133 (2016)","journal-title":"Min. Eng."},{"key":"48_CR8","first-page":"104","volume":"10X","author":"W Wei","year":"2018","unstructured":"Wei, W., Lejia, L.: Application of BIM technology in engineering cost management. Residential Real Estate 10X, 104 (2018)","journal-title":"Residential Real Estate"},{"issue":"1","key":"48_CR9","first-page":"012050","volume":"143","author":"SEN Lau","year":"2018","unstructured":"Lau, S.E.N., Zakaria, R., Aminudin, E., Saar, C.C., Wahid, C.M.F.H.C.: A review of application building information modeling (BIM) during pre-construction stage: retrospective and future directions. IOP Conf. 143(1), 012050 (2018)","journal-title":"IOP Conf."},{"key":"48_CR10","first-page":"229","volume":"9","author":"Z Deguang","year":"2019","unstructured":"Deguang, Z.: Application of BIM technology in the construction process of prefabricated building engineering. Residential Real Estate 9, 229 (2019)","journal-title":"Residential Real Estate"}],"container-title":["Advances in Intelligent Systems and Computing","The 2020 International Conference on Machine Learning and Big Data Analytics for IoT Security and Privacy"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-62746-1_48","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,4]],"date-time":"2020-11-04T09:20:24Z","timestamp":1604481624000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-62746-1_48"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,11,5]]},"ISBN":["9783030627454","9783030627461"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-62746-1_48","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2020,11,5]]},"assertion":[{"value":"5 November 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"SPIOT","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Machine Learning and Big Data Analytics for IoT Security and Privacy","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Shanghai","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"China","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"6 November 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 November 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"spiot2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/spiot2020.com\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}