{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,2]],"date-time":"2026-06-02T11:52:42Z","timestamp":1780401162361,"version":"3.54.1"},"publisher-location":"Cham","reference-count":10,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030677800","type":"print"},{"value":"9783030677817","type":"electronic"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-67781-7_18","type":"book-chapter","created":{"date-parts":[[2021,1,30]],"date-time":"2021-01-30T12:02:59Z","timestamp":1612008179000},"page":"194-214","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Controlling Risk from Design Changes in Chinese Prefabricated Construction Projects: An Empirical Investigation"],"prefix":"10.1007","author":[{"given":"Juan","family":"Du","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jiajun","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yifei","family":"Gu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Vijayan","family":"Sugumaran","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,1,31]]},"reference":[{"key":"18_CR30","unstructured":"Ahmadabadi, A.A., Heravi, G.: Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success. Trans. Res. Part A: Policy Pract. 124, 169\u2013188 (2019)"},{"key":"18_CR31","unstructured":"Du, J., Jing, H., Castro-Lacouture, D., et al.: Multi-agent simulation for managing design changes in prefabricated construction projects. Eng. Constr. Architectural Manage. 27(1), 270\u2013295 (2019)"},{"key":"18_CR32","unstructured":"Layth Kraidi, R.S., Wilfred Matipa, F.B.: Analyzing the critical risk factors associated with oil and gas pipeline projects in Iraq. Int. J. Crit. Infrastruct. Prot. 24, 14\u201322 (2019)"},{"issue":"4","key":"18_CR5","doi-asserted-by":"publisher","first-page":"421","DOI":"10.1016\/0360-1323(94)90002-7","volume":"29","author":"A Retik","year":"1994","unstructured":"Retik, A., Warszawski, A.: Automated design of prefabricated building. Build. Environ. 29(4), 421\u2013436 (1994)","journal-title":"Build. Environ."},{"key":"18_CR6","doi-asserted-by":"publisher","first-page":"1705","DOI":"10.4028\/www.scientific.net\/AMM.536-537.1705","volume":"536\u2013537","author":"BK Qi","year":"2014","unstructured":"Qi, B.K., Li, C.F.: Whole life cycle management of prefabricated construction research based on BIM technology. Appl. Mech. Mater. 536\u2013537, 1705\u20131708 (2014)","journal-title":"Appl. Mech. Mater."},{"key":"18_CR7","doi-asserted-by":"crossref","unstructured":"Sheng-Hua, Z.: Research on the fundamental framework of alliance capability and its mechanism of promoting alliance performance. In: 2006 International Conference on Management Science and Engineering, Lille, pp. 963\u2013969 (2006)","DOI":"10.1109\/ICMSE.2006.314009"},{"key":"18_CR8","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"162","DOI":"10.1007\/978-3-540-72588-6_28","volume-title":"Computational Science \u2013 ICCS 2007","author":"Q Tong","year":"2007","unstructured":"Tong, Q., Liu, T., Tong, H., Ou, Z.: Evaluation of historic buildings based on structural equation models. In: Shi, Y., van Albada, G.D., Dongarra, J., Sloot, Peter M.A. (eds.) ICCS 2007. LNCS, vol. 4489, pp. 162\u2013165. Springer, Heidelberg (2007). https:\/\/doi.org\/10.1007\/978-3-540-72588-6_28"},{"key":"18_CR9","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.jclepro.2018.09.127","volume":"205","author":"T Wang","year":"2018","unstructured":"Wang, T., Gao, S., Li, X., et al.: A meta-network-based risk evaluation and control method for industrialized building construction projects. J. Clean. Prod. 205, 552\u2013564 (2018)","journal-title":"J. Clean. Prod."},{"key":"18_CR10","unstructured":"Yue, Z., Han, P., Ling, Z.: Risk analysis of coal mine construction project based on structural equation model. In: 2010 3rd International Conference on Information Management, Innovation Management and Industrial Engineering, Kunming. pp. 23\u201326 (2010)"},{"key":"18_CR11","unstructured":"Yang, J., Wang, J.: Research on construction project integrated management model. Constr. Econ. 03, 67\u201369 (2008)"}],"container-title":["Lecture Notes in Business Information Processing","Smart Business: Technology and Data Enabled Innovative Business Models and Practices"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-67781-7_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,1,30]],"date-time":"2021-01-30T12:05:30Z","timestamp":1612008330000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-67781-7_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030677800","9783030677817"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-67781-7_18","relation":{},"ISSN":["1865-1348","1865-1356"],"issn-type":[{"value":"1865-1348","type":"print"},{"value":"1865-1356","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"31 January 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"WeB","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Workshop on E-Business","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Munich","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"14 December 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"14 December 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"web2019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/2019.ebizworkshop.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Double-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"42","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"20","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"48% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2-3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"1-2","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}