{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T14:35:08Z","timestamp":1743086108783,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030711863"},{"type":"electronic","value":"9783030711870"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-71187-0_93","type":"book-chapter","created":{"date-parts":[[2021,6,2]],"date-time":"2021-06-02T05:04:54Z","timestamp":1622610294000},"page":"1007-1017","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A Hybrid Heuristic for a Three-Stage Assembly Flow Shop Scheduling Problem with Sequence Dependent Setup Time"],"prefix":"10.1007","author":[{"given":"Saulo C.","family":"Campos","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3403-4770","authenticated-orcid":false,"given":"Jos\u00e9 Elias Claudio","family":"Arroyo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Matheus","family":"Freitas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,6,3]]},"reference":[{"issue":"2","key":"93_CR1","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi, A.: The third comprehensive survey on scheduling problems with setup times\/costs. Eur. J. Oper. Res. 246(2), 345\u2013378 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"93_CR2","doi-asserted-by":"publisher","first-page":"225","DOI":"10.1007\/s10845-013-0775-5","volume":"26","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi, A., Aydilek, H.: The two stage assembly flowshop scheduling problem to minimize total tardiness. J. Intell. Manuf. 26(2), 225\u2013237 (2015)","journal-title":"J. Intell. Manuf."},{"key":"93_CR3","unstructured":"Andr\u00e9s, C., Hatami, S.: The three stage assembly permutation flowshop scheduling problem. In: V International Conference on Industrial Engineering and Industrial Management, pp. 867\u2013875 (2011)"},{"key":"93_CR4","unstructured":"Campos, S.C., Arroyo, J.E.C.: NSGA-II with iterated greedy for a bi-objective three-stage assembly flowshop scheduling problem. In: Proceedings of the 2014 Annual Conference on Genetic and Evolutionary Computation, pp. 429\u2013436. ACM (2014)"},{"key":"93_CR5","doi-asserted-by":"crossref","unstructured":"Campos, S.C., Arroyo, J.E.C., Tavares, R.G.: A general VNS heuristic for a three-stage assembly flow shop scheduling problem. In: International Conference on Intelligent Systems Design and Applications, pp. 955\u2013964. Springer (2016)","DOI":"10.1007\/978-3-319-53480-0_94"},{"issue":"2","key":"93_CR6","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"M Garey","year":"1976","unstructured":"Garey, M., Johnson, D., Sethi, R.: The complexity of flowshop and jobshop scheduling. Math. Oper. Res. 1(2), 117\u2013129 (1976)","journal-title":"Math. Oper. Res."},{"issue":"9\u201312","key":"93_CR7","doi-asserted-by":"publisher","first-page":"1153","DOI":"10.1007\/s00170-010-2579-5","volume":"50","author":"S Hatami","year":"2010","unstructured":"Hatami, S., Ebrahimnejad, S., Tavakkoli-Moghaddam, R., Maboudian, Y.: Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times. Int. J. Adv. Manuf. Technol. 50(9\u201312), 1153\u20131164 (2010)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"93_CR8","volume-title":"Stochastic Local Search: Foundations & Applications","author":"HH Hoos","year":"2004","unstructured":"Hoos, H.H., St\u00fctzle, T.: Stochastic Local Search: Foundations & Applications. Morgan Kaufmann, San Francisco (2004)"},{"key":"93_CR9","doi-asserted-by":"publisher","first-page":"158","DOI":"10.1016\/j.cie.2017.01.006","volume":"105","author":"G Komaki","year":"2017","unstructured":"Komaki, G., Teymourian, E., Kayvanfar, V., Booyavi, Z.: Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem. Comput. Ind. Eng. 105, 158\u2013173 (2017)","journal-title":"Comput. Ind. Eng."},{"issue":"7","key":"93_CR10","doi-asserted-by":"publisher","first-page":"689","DOI":"10.1016\/S0305-0548(00)00004-6","volume":"28","author":"C Koulamas","year":"2001","unstructured":"Koulamas, C., Kyparisis, G.: The three-stage assembly flowshop scheduling problem. Comput. Oper. Res. 28(7), 689\u2013704 (2001)","journal-title":"Comput. Oper. Res."},{"issue":"12","key":"93_CR11","doi-asserted-by":"publisher","first-page":"3747","DOI":"10.1016\/j.camwa.2012.02.051","volume":"64","author":"A Liefooghe","year":"2012","unstructured":"Liefooghe, A., Basseur, M., Humeau, J., Jourdan, L., Talbi, E.: On optimizing a bi-objective flowshop scheduling problem in an uncertain environment. Comput. Math. Appl. 64(12), 3747\u20133762 (2012)","journal-title":"Comput. Math. Appl."},{"key":"93_CR12","doi-asserted-by":"crossref","unstructured":"Louren\u00e7o, H.R., Martin, O.C., St\u00fctzle, T.: Iterated local search: framework and applications. In: Handbook of Metaheuristics, pp. 363\u2013397. Springer (2010)","DOI":"10.1007\/978-1-4419-1665-5_12"},{"issue":"1","key":"93_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/2251-712X-8-26","volume":"8","author":"A Maleki-Darounkolaei","year":"2012","unstructured":"Maleki-Darounkolaei, A., Modiri, M., Tavakkoli-M, R., Seyyedi, I.: A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times. J. Ind. Eng. Int. 8(1), 1\u20137 (2012)","journal-title":"J. Ind. Eng. Int."},{"key":"93_CR14","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.omega.2013.10.002","volume":"44","author":"Q Pan","year":"2014","unstructured":"Pan, Q., Ruiz, R.: An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem. Omega 44, 41\u201350 (2014)","journal-title":"Omega"},{"issue":"3","key":"93_CR15","doi-asserted-by":"publisher","first-page":"1143","DOI":"10.1016\/j.ejor.2006.07.029","volume":"187","author":"R Ruiz","year":"2008","unstructured":"Ruiz, R., St\u00fctzle, T.: An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives. Eur. J. Oper. Res. 187(3), 1143\u20131159 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"93_CR16","doi-asserted-by":"publisher","first-page":"944","DOI":"10.1080\/00207543.2014.948575","volume":"53","author":"N Shoaardebili","year":"2015","unstructured":"Shoaardebili, N., Fattahi, P.: Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints. Int. J. Prod. Res. 53(3), 944\u2013968 (2015)","journal-title":"Int. J. Prod. Res."},{"issue":"10","key":"93_CR17","doi-asserted-by":"publisher","first-page":"1580","DOI":"10.1057\/jors.2013.105","volume":"65","author":"Z Tajbakhsh","year":"2014","unstructured":"Tajbakhsh, Z., Fattahi, P., Behnamian, J.: Multi-objective assembly permutation flow shop scheduling problem: a mathematical model and a meta-heuristic algorithm. J. Oper. Res. Soc. 65(10), 1580\u20131592 (2014)","journal-title":"J. Oper. Res. Soc."},{"issue":"3","key":"93_CR18","doi-asserted-by":"publisher","first-page":"265","DOI":"10.1016\/S0925-5273(01)00175-X","volume":"76","author":"F Yalaoui","year":"2002","unstructured":"Yalaoui, F., Chu, C.: Parallel machine scheduling to minimize total tardiness. Int. J. Prod. Econ. 76(3), 265\u2013279 (2002)","journal-title":"Int. J. Prod. Econ."}],"container-title":["Advances in Intelligent Systems and Computing","Intelligent Systems Design and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-71187-0_93","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,2]],"date-time":"2021-06-02T05:30:02Z","timestamp":1622611802000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-71187-0_93"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030711863","9783030711870"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-71187-0_93","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"3 June 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ISDA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Intelligent Systems Design and Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"12 December 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"15 December 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"isda2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.mirlabs.net\/isda20\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}