{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T06:25:03Z","timestamp":1774074303078,"version":"3.50.1"},"publisher-location":"Cham","reference-count":79,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030763060","type":"print"},{"value":"9783030763077","type":"electronic"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-76307-7_26","type":"book-chapter","created":{"date-parts":[[2021,5,11]],"date-time":"2021-05-11T20:03:07Z","timestamp":1620763387000},"page":"342-356","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Integrated Production and Maintenance Planning: A Systematic Literature Review"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7718-1266","authenticated-orcid":false,"given":"Nicollas Luiz Schweitzer","family":"de Souza","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2598-390X","authenticated-orcid":false,"given":"L\u00facio Galv\u00e3o","family":"Mendes","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0858-9046","authenticated-orcid":false,"given":"Eug\u00eanio Strassburguer","family":"Rovaris","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6629-6938","authenticated-orcid":false,"given":"Enzo Morosini","family":"Frazzon","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1388-3888","authenticated-orcid":false,"given":"Lynceo Falavigna","family":"Braghirolli","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,5,12]]},"reference":[{"key":"26_CR1","doi-asserted-by":"publisher","first-page":"106432","DOI":"10.1016\/j.cie.2020.106432","volume":"143","author":"M Ghaleb","year":"2020","unstructured":"Ghaleb, M., Taghipour, S., Sharifi, M., Zolfagharinia, H.: Integrated production and maintenance scheduling for a single degrading machine with deterioration-based failures. Comput. Ind. Eng. 143, 106432 (2020). https:\/\/doi.org\/10.1016\/j.cie.2020.106432","journal-title":"Comput. Ind. Eng."},{"key":"26_CR2","doi-asserted-by":"publisher","unstructured":"de Souza, N.L.S., Stradioto Neto, L.A., Rossato, I.D.F., da Silva, B.S., Henkes, J.A.: Aplica\u00e7\u00e3o de ferramenta da ind\u00fastria 4.0 em um caso com alguns cen\u00e1rios nacionais e internacionais. Revista Gest\u00e3o & Sustentabilidade Ambiental 9(2), 120 (2020). https:\/\/doi.org\/10.19177\/rgsa.v9e22020120-140","DOI":"10.19177\/rgsa.v9e22020120-140"},{"issue":"1","key":"26_CR3","doi-asserted-by":"publisher","first-page":"515","DOI":"10.1016\/j.cirp.2018.04.033","volume":"67","author":"EM Frazzon","year":"2018","unstructured":"Frazzon, E.M., K\u00fcck, M., Freitag, M.: Data-driven production control for complex and dynamic manufacturing systems. CIRP Ann. 67(1), 515\u2013518 (2018). https:\/\/doi.org\/10.1016\/j.cirp.2018.04.033","journal-title":"CIRP Ann."},{"issue":"3","key":"26_CR4","doi-asserted-by":"publisher","first-page":"639","DOI":"10.19177\/rgsa.v8e32019639-659","volume":"8","author":"LS de Souza","year":"2019","unstructured":"de Souza, L.S., Rossato, I.D.F., Henkes, J.A.: Uma an\u00e1lise das estrat\u00e9gias de produ\u00e7\u00e3o mais limpa e efici\u00eancia energ\u00e9tica em uma ind\u00fastria de equipamentos odontol\u00f3gicos. Revista Gest\u00e3o & Sustentabilidade Ambiental 8(3), 639 (2019). https:\/\/doi.org\/10.19177\/rgsa.v8e32019639-659","journal-title":"Revista Gest\u00e3o & Sustentabilidade Ambiental"},{"issue":"4","key":"26_CR5","doi-asserted-by":"publisher","first-page":"1515","DOI":"10.1007\/s10845-017-1303-9","volume":"30","author":"A Boudjelida","year":"2017","unstructured":"Boudjelida, A.: On the robustness of joint production and maintenance scheduling in presence of uncertainties. J. Intell. Manuf. 30(4), 1515\u20131530 (2017). https:\/\/doi.org\/10.1007\/s10845-017-1303-9","journal-title":"J. Intell. Manuf."},{"key":"26_CR6","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1016\/j.jmsy.2020.06.011","volume":"56","author":"M Alimian","year":"2020","unstructured":"Alimian, M., Ghezavati, V., Tavakkoli-Moghaddam, R.: New integration of preventive maintenance and production planning with cell formation and group scheduling for dynamic cellular manufacturing systems. J. Manuf. Syst. 56, 341\u2013358 (2020). https:\/\/doi.org\/10.1016\/j.jmsy.2020.06.011","journal-title":"J. Manuf. Syst."},{"key":"26_CR7","doi-asserted-by":"crossref","unstructured":"Glawar, R., et al.: An approach for the integration of anticipative maintenance strategies within a production planning and control model. Proc. CIRP 67, 46\u201351 (2018). http:\/\/dx.doi.org\/10.1016\/j.procir.2017.12.174","DOI":"10.1016\/j.procir.2017.12.174"},{"key":"26_CR8","doi-asserted-by":"publisher","first-page":"190","DOI":"10.1016\/j.ress.2015.09.017","volume":"145","author":"E-H Aghezzaf","year":"2016","unstructured":"Aghezzaf, E.-H., Khatab, A., Tam, P.L.: Optimizing production and imperfect preventive maintenance planning\u2019s integration in failure-prone manufacturing systems. Reliab. Eng. Syst. Saf. 145, 190\u2013198 (2016). https:\/\/doi.org\/10.1016\/j.ress.2015.09.017","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"1\u20132","key":"26_CR9","doi-asserted-by":"publisher","first-page":"310","DOI":"10.1177\/0954405419852479","volume":"234","author":"L Wang","year":"2019","unstructured":"Wang, L., Lu, Z., Ren, Y.: Integrated production planning and condition-based maintenance considering uncertain demand and random failures. Proc. Inst. Mech. Eng. B J. Eng. Manuf. 234(1\u20132), 310\u2013323 (2019). https:\/\/doi.org\/10.1177\/0954405419852479","journal-title":"Proc. Inst. Mech. Eng. B J. Eng. Manuf."},{"issue":"11","key":"26_CR10","doi-asserted-by":"publisher","first-page":"4832","DOI":"10.1007\/s00330-018-5423-1","volume":"28","author":"S Baek","year":"2018","unstructured":"Baek, S., Yoon, D.Y., Lim, K.J., Cho, Y.K., Seo, Y.L., Yun, E.J.: The most downloaded and most cited articles in radiology journals: a comparative bibliometric analysis. Eur. Radiol. 28(11), 4832\u20134838 (2018). https:\/\/doi.org\/10.1007\/s00330-018-5423-1","journal-title":"Eur. Radiol."},{"issue":"5","key":"26_CR11","doi-asserted-by":"publisher","first-page":"336","DOI":"10.1016\/j.ijsu.2010.02.007","volume":"8","author":"D Moher","year":"2010","unstructured":"Moher, D., Liberati, A., Tetzlaff, J., Altman, D.G.: Preferred reporting items for systematic reviews and meta-analyses: the PRISMA statement. Int. J. Surg. 8(5), 336\u2013341 (2010). https:\/\/doi.org\/10.1016\/j.ijsu.2010.02.007","journal-title":"Int. J. Surg."},{"key":"26_CR12","unstructured":"Fink, A.: Conducting Research Literature Reviews: From the Internet to Paper. Sage Publications, Los Angeles (2019)"},{"key":"26_CR13","doi-asserted-by":"publisher","first-page":"102098","DOI":"10.1016\/j.simpat.2020.102098","volume":"103","author":"Y Triska","year":"2020","unstructured":"Triska, Y., Frazzon, E.M., Silva, V.M.D.: Proposition of a simulation-based method for port capacity assessment and expansion planning. Simul. Model. Pract. Theory 103, 102098 (2020). https:\/\/doi.org\/10.1016\/j.simpat.2020.102098","journal-title":"Simul. Model. Pract. Theory"},{"key":"26_CR14","doi-asserted-by":"publisher","first-page":"186","DOI":"10.1016\/j.jmsy.2018.10.004","volume":"49","author":"IR Uhlmann","year":"2018","unstructured":"Uhlmann, I.R., Frazzon, E.M.: Production rescheduling review: Opportunities for industrial integration and practical applications. J. Manuf. Syst. 49, 186\u2013193 (2018). https:\/\/doi.org\/10.1016\/j.jmsy.2018.10.004","journal-title":"J. Manuf. Syst."},{"key":"26_CR15","doi-asserted-by":"publisher","unstructured":"Liao, Y., Deschamps, F., de Freitas Rocha Loures, E., Ramos, L.F.P.: Past, present and future of Industry 4.0 - a systematic literature review and research agenda proposal. Int. J. Prod. Res. 55(12), 3609\u20133629 (2017). https:\/\/doi.org\/10.1080\/00207543.2017.1308576","DOI":"10.1080\/00207543.2017.1308576"},{"issue":"4","key":"26_CR16","doi-asserted-by":"publisher","first-page":"959","DOI":"10.1016\/j.joi.2017.08.007","volume":"11","author":"M Aria","year":"2017","unstructured":"Aria, M., Cuccurullo, C.: Bibliometrix: an R-tool for comprehensive science mapping analysis. J. Informetrics 11(4), 959\u2013975 (2017). https:\/\/doi.org\/10.1016\/j.joi.2017.08.007","journal-title":"J. Informetrics"},{"issue":"1","key":"26_CR17","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1080\/00207543.2018.1459923","volume":"57","author":"S Chansombat","year":"2018","unstructured":"Chansombat, S., Pongcharoen, P., Hicks, C.: A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. Int. J. Prod. Res. 57(1), 61\u201382 (2018). https:\/\/doi.org\/10.1080\/00207543.2018.1459923","journal-title":"Int. J. Prod. Res."},{"issue":"18","key":"26_CR18","doi-asserted-by":"publisher","first-page":"6147","DOI":"10.1080\/00207543.2018.1478150","volume":"56","author":"Z Hajej","year":"2018","unstructured":"Hajej, Z., Rezg, N., Gharbi, A.: Quality issue in forecasting problem of production and maintenance policy for production unit. Int. J. Prod. Res. 56(18), 6147\u20136163 (2018). https:\/\/doi.org\/10.1080\/00207543.2018.1478150","journal-title":"Int. J. Prod. Res."},{"issue":"24","key":"26_CR19","doi-asserted-by":"publisher","first-page":"7377","DOI":"10.1080\/00207543.2014.931609","volume":"52","author":"M Aramon Bajestani","year":"2014","unstructured":"Aramon Bajestani, M., Banjevic, D., Beck, J.C.: Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions. Int. J. Prod. Res. 52(24), 7377\u20137400 (2014). https:\/\/doi.org\/10.1080\/00207543.2014.931609","journal-title":"Int. J. Prod. Res."},{"issue":"12","key":"26_CR20","doi-asserted-by":"publisher","first-page":"3719","DOI":"10.1080\/00207543.2013.765070","volume":"51","author":"S Wang","year":"2013","unstructured":"Wang, S.: Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning. Int. J. Prod. Res. 51(12), 3719\u20133733 (2013). https:\/\/doi.org\/10.1080\/00207543.2013.765070","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"26_CR21","doi-asserted-by":"publisher","first-page":"847","DOI":"10.1080\/00207543.2012.676683","volume":"51","author":"S Wang","year":"2013","unstructured":"Wang, S., Liu, M.: A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning. Int. J. Prod. Res. 51(3), 847\u2013868 (2013). https:\/\/doi.org\/10.1080\/00207543.2012.676683","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"26_CR22","doi-asserted-by":"publisher","first-page":"883","DOI":"10.1080\/00207543.2012.677070","volume":"51","author":"CS Wong","year":"2013","unstructured":"Wong, C.S., Chan, F.T.S., Chung, S.H.: A joint production scheduling approach considering multiple resources and preventive maintenance tasks. Int. J. Prod. Res. 51(3), 883\u2013896 (2013). https:\/\/doi.org\/10.1080\/00207543.2012.677070","journal-title":"Int. J. Prod. Res."},{"issue":"20","key":"26_CR23","doi-asserted-by":"publisher","first-page":"5683","DOI":"10.1080\/00207543.2011.613868","volume":"50","author":"CS Wong","year":"2012","unstructured":"Wong, C.S., Chan, F.T.S., Chung, S.H.: A genetic algorithm approach for production scheduling with mould maintenance consideration. Int. J. Prod. Res. 50(20), 5683\u20135697 (2012). https:\/\/doi.org\/10.1080\/00207543.2011.613868","journal-title":"Int. J. Prod. Res."},{"issue":"8","key":"26_CR24","doi-asserted-by":"publisher","first-page":"2265","DOI":"10.1080\/00207541003620386","volume":"49","author":"NM Najid","year":"2010","unstructured":"Najid, N.M., Alaoui-Selsouli, M., Mohafid, A.: An integrated production and maintenance planning model with time windows and shortage cost. Int. J. Prod. Res. 49(8), 2265\u20132283 (2010). https:\/\/doi.org\/10.1080\/00207541003620386","journal-title":"Int. J. Prod. Res."},{"issue":"19","key":"26_CR25","doi-asserted-by":"publisher","first-page":"5695","DOI":"10.1080\/00207543.2010.528063","volume":"49","author":"H Zied","year":"2011","unstructured":"Zied, H., Sofiene, D., Nidhal, R.: Optimal integrated maintenance\/production policy for randomly failing systems with variable failure rate. Int. J. Prod. Res. 49(19), 5695\u20135712 (2011). https:\/\/doi.org\/10.1080\/00207543.2010.528063","journal-title":"Int. J. Prod. Res."},{"issue":"9\u201312","key":"26_CR26","doi-asserted-by":"publisher","first-page":"1607","DOI":"10.1007\/s00170-014-6175-y","volume":"76","author":"AF Kouedeu","year":"2014","unstructured":"Kouedeu, A.F., Kenn\u00e9, J.-P., Dejax, P., Songmene, V., Polotski, V.: Production and maintenance planning for a failure-prone deteriorating manufacturing system: a hierarchical control approach. Int. J. Adv. Manuf. Technol. 76(9\u201312), 1607\u20131619 (2014). https:\/\/doi.org\/10.1007\/s00170-014-6175-y","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"9\u201312","key":"26_CR27","doi-asserted-by":"publisher","first-page":"2295","DOI":"10.1007\/s00170-013-4841-0","volume":"68","author":"A Berrichi","year":"2013","unstructured":"Berrichi, A., Yalaoui, F.: Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem. Int. J. Adv. Manuf. Technol. 68(9\u201312), 2295\u20132310 (2013). https:\/\/doi.org\/10.1007\/s00170-013-4841-0","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"9\u201312","key":"26_CR28","doi-asserted-by":"publisher","first-page":"1049","DOI":"10.1007\/s00170-011-3652-4","volume":"60","author":"E Pan","year":"2011","unstructured":"Pan, E., Liao, W., Xi, L.: A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int. J. Adv. Manuf. Technol. 60(9\u201312), 1049\u20131061 (2011). https:\/\/doi.org\/10.1007\/s00170-011-3652-4","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1\u20134","key":"26_CR29","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1007\/s00170-009-2514-9","volume":"50","author":"E Pan","year":"2010","unstructured":"Pan, E., Liao, W., Xi, L.: Single-machine-based production scheduling model integrated preventive maintenance planning. Int. J. Adv. Manuf. Technol. 50(1\u20134), 365\u2013375 (2010). https:\/\/doi.org\/10.1007\/s00170-009-2514-9","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"9\u201310","key":"26_CR30","doi-asserted-by":"publisher","first-page":"954","DOI":"10.1007\/s00170-007-1268-5","volume":"39","author":"J Yulan","year":"2007","unstructured":"Yulan, J., Zuhua, J., Wenrui, H.: Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. Int. J. Adv. Manuf. Technol. 39(9\u201310), 954\u2013964 (2007). https:\/\/doi.org\/10.1007\/s00170-007-1268-5","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"26_CR31","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1109\/tr.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady, C.R., Kutanoglu, E.: Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans. Reliab. 54(2), 304\u2013309 (2005). https:\/\/doi.org\/10.1109\/tr.2005.845967","journal-title":"IEEE Trans. Reliab."},{"issue":"6","key":"26_CR32","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"CR Cassady","year":"2003","unstructured":"Cassady, C.R., Kutanoglu, E.: Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans. 35(6), 503\u2013513 (2003). https:\/\/doi.org\/10.1080\/07408170304416","journal-title":"IIE Trans."},{"issue":"2","key":"26_CR33","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1007\/s10845-018-1450-7","volume":"31","author":"Z Hajej","year":"2018","unstructured":"Hajej, Z., Rezg, N., Askri, T.: Joint optimization of capacity, production and maintenance planning of leased machines. J. Intell. Manuf. 31(2), 351\u2013374 (2018). https:\/\/doi.org\/10.1007\/s10845-018-1450-7","journal-title":"J. Intell. Manuf."},{"key":"26_CR34","unstructured":"Batubara, S., Marie, I.A., Cattelya, F.H.: Minimizing mean weighted expected tardiness by integrating preventive maintenance and production scheduling using genetic algorithm. In: International Conference on Industrial Engineering and Operations Management, pp. 3242\u20133253, Bangkok, Thailand (2019)"},{"issue":"3","key":"26_CR35","doi-asserted-by":"publisher","first-page":"1802","DOI":"10.1016\/j.ifacol.2015.06.348","volume":"48","author":"N Fnaiech","year":"2015","unstructured":"Fnaiech, N., Fitouri, C., Varnier, C., Fnaiech, F., Zerhouni, N.: A new heuristic method for solving joint job shop scheduling of production and maintenance. IFAC-PapersOnLine 48(3), 1802\u20131808 (2015). https:\/\/doi.org\/10.1016\/j.ifacol.2015.06.348","journal-title":"IFAC-PapersOnLine"},{"key":"26_CR36","doi-asserted-by":"publisher","unstructured":"Liu, X., Wang, W., Zhang, T., Zhai, Q., Peng, R.: An integrated non-cyclical preventive maintenance and production planning model for a multi-product production system. In: 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (2015). https:\/\/doi.org\/10.1109\/ieem.2015.7385696","DOI":"10.1109\/ieem.2015.7385696"},{"issue":"2","key":"26_CR37","doi-asserted-by":"publisher","first-page":"215","DOI":"10.17531\/ein.2015.2.7","volume":"17","author":"X Liu","year":"2015","unstructured":"Liu, X., Wang, W., Peng, R.: An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploatacja i Niezawodnosc \u2013 Maint. Reliab. 17(2), 215\u2013221 (2015). https:\/\/doi.org\/10.17531\/ein.2015.2.7","journal-title":"Eksploatacja i Niezawodnosc \u2013 Maint. Reliab."},{"key":"26_CR38","doi-asserted-by":"crossref","unstructured":"Pandey, D., Kulkarni, M.S., Vrat, P.: A methodology for joint optimization for maintenance planning, process quality and production scheduling. Comput. Indus. Eng. 61(4), 1098\u20131106 (2011). http:\/\/dx.doi.org\/10.1016\/j.cie.2011.06.023","DOI":"10.1016\/j.cie.2011.06.023"},{"key":"26_CR39","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.jmsy.2019.12.004","volume":"54","author":"X Chen","year":"2020","unstructured":"Chen, X., An, Y., Zhang, Z., Li, Y.: An approximate nondominated sorting genetic algorithm to integrate optimization of production scheduling and accurate maintenance based on reliability intervals. J. Manuf. Syst. 54, 227\u2013241 (2020). https:\/\/doi.org\/10.1016\/j.jmsy.2019.12.004","journal-title":"J. Manuf. Syst."},{"key":"26_CR40","doi-asserted-by":"publisher","first-page":"106203","DOI":"10.1016\/j.cie.2019.106203","volume":"139","author":"S Xu","year":"2020","unstructured":"Xu, S., Dong, W., Jin, M., Wang, L.: Single-machine scheduling with fixed or flexible maintenance. Comput. Ind. Eng. 139, 106203 (2020). https:\/\/doi.org\/10.1016\/j.cie.2019.106203","journal-title":"Comput. Ind. Eng."},{"issue":"6","key":"26_CR41","first-page":"3551","volume":"14","author":"MF Shalaby","year":"2019","unstructured":"Shalaby, M.F., Gadallah, M.H., Almokadem, A.: Optimization of production, maintenance and inspection decisions under reliability constraints. J. Eng. Sci. Technol. 14(6), 3551\u20133568 (2019)","journal-title":"J. Eng. Sci. Technol."},{"key":"26_CR42","doi-asserted-by":"publisher","first-page":"106092","DOI":"10.1016\/j.cie.2019.106092","volume":"137","author":"Y Ao","year":"2019","unstructured":"Ao, Y., Zhang, H., Wang, C.: Research of an integrated decision model for production scheduling and maintenance planning with economic objective. Comput. Ind. Eng. 137, 106092 (2019). https:\/\/doi.org\/10.1016\/j.cie.2019.106092","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"26_CR43","doi-asserted-by":"publisher","first-page":"446","DOI":"10.1007\/s10696-018-9313-2","volume":"31","author":"H Rivera-G\u00f3mez","year":"2018","unstructured":"Rivera-G\u00f3mez, H., Lara, J., Monta\u00f1o-Arango, O., Hern\u00e1ndez-Gress, E.S., Corona-Armenta, J.R., Santana-Robles, F.: Joint production and repair efficiency planning of a multiple deteriorating system. Flex. Serv. Manuf. J. 31(2), 446\u2013471 (2018). https:\/\/doi.org\/10.1007\/s10696-018-9313-2","journal-title":"Flex. Serv. Manuf. J."},{"issue":"2","key":"26_CR44","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1108\/jqme-11-2016-0068","volume":"25","author":"L Wang","year":"2019","unstructured":"Wang, L., Lu, Z., Han, X.: Joint optimal production planning and proactive maintenance policy for a system subject to degradation. J. Qual. Maint. Eng. 25(2), 236\u2013252 (2019). https:\/\/doi.org\/10.1108\/jqme-11-2016-0068","journal-title":"J. Qual. Maint. Eng."},{"key":"26_CR45","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/j.jmsy.2018.12.001","volume":"50","author":"M Alimian","year":"2019","unstructured":"Alimian, M., Saidi-Mehrabad, M., Jabbarzadeh, A.: A robust integrated production and preventive maintenance planning model for multi-state systems with uncertain demand and common cause failures. J. Manuf. Syst. 50, 263\u2013277 (2019). https:\/\/doi.org\/10.1016\/j.jmsy.2018.12.001","journal-title":"J. Manuf. Syst."},{"key":"26_CR46","doi-asserted-by":"publisher","DOI":"10.24200\/sci.2017.4461","author":"SHA Rahmati","year":"2017","unstructured":"Rahmati, S.H.A., Ahmadi, A., Karimi, B.: Developing simulation based optimization mechanism for novel stochastic reliability centered maintenance problem. Scientia Iranica (2017). https:\/\/doi.org\/10.24200\/sci.2017.4461","journal-title":"Scientia Iranica"},{"issue":"7","key":"26_CR47","doi-asserted-by":"publisher","first-page":"1088","DOI":"10.3390\/app8071088","volume":"8","author":"Z Guiras","year":"2018","unstructured":"Guiras, Z., Hajej, Z., Rezg, N., Dolgui, A.: Comparative analysis of heuristic algorithms used for solving a Production and Maintenance Planning Problem (PMPP). Appl. Sci. 8(7), 1088 (2018). https:\/\/doi.org\/10.3390\/app8071088","journal-title":"Appl. Sci."},{"key":"26_CR48","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1016\/j.ijpe.2018.03.004","volume":"200","author":"H Rivera-G\u00f3mez","year":"2018","unstructured":"Rivera-G\u00f3mez, H., Gharbi, A., Kenn\u00e9, J.-P., Monta\u00f1o-Arango, O., Hern\u00e1ndez-Gress, E.S.: Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration. Int. J. Prod. Econ. 200, 103\u2013118 (2018). https:\/\/doi.org\/10.1016\/j.ijpe.2018.03.004","journal-title":"Int. J. Prod. Econ."},{"key":"26_CR49","doi-asserted-by":"publisher","first-page":"184797901877326","DOI":"10.1177\/1847979018773260","volume":"10","author":"G Ettaye","year":"2018","unstructured":"Ettaye, G., El Barkany, A., Jabri, A., El Khalfi, A.: Optimizing the integrated production and maintenance planning using genetic algorithm. Int. J. Eng. Bus. Manage. 10, 184797901877326 (2018). https:\/\/doi.org\/10.1177\/1847979018773260","journal-title":"Int. J. Eng. Bus. Manage."},{"issue":"1","key":"26_CR50","first-page":"30","volume":"38","author":"E Mehdizadeh","year":"2018","unstructured":"Mehdizadeh, E., Aydin Atashi Abkenar, A.: Preventive maintenance effect on the aggregate production planning model with tow-phase production systems: modeling and solution methods. Eng. Rev. Me\u0111unarodni \u010dasopis namijenjen publiciranju originalnih istra\u017eivanja s aspekta analize konstrukcija, materijala i novih tehnologija u podru\u010dju strojarstva, brodogradnje, temeljnih tehni\u010dkih znanosti, elektrotehnike, ra\u010dunarstva i gra\u0111evinarstva 38(1), 30\u201350 (2018)","journal-title":"Eng. Rev. Me\u0111unarodni \u010dasopis namijenjen publiciranju originalnih istra\u017eivanja s aspekta analize konstrukcija, materijala i novih tehnologija u podru\u010dju strojarstva, brodogradnje, temeljnih tehni\u010dkih znanosti, elektrotehnike, ra\u010dunarstva i gra\u0111evinarstva"},{"key":"26_CR51","doi-asserted-by":"publisher","first-page":"325","DOI":"10.1016\/j.compchemeng.2017.01.007","volume":"99","author":"M Biondi","year":"2017","unstructured":"Biondi, M., Sand, G., Harjunkoski, I.: Optimization of multipurpose process plant operations: a multi-time-scale maintenance and production scheduling approach. Comput. Chem. Eng. 99, 325\u2013339 (2017). https:\/\/doi.org\/10.1016\/j.compchemeng.2017.01.007","journal-title":"Comput. Chem. Eng."},{"key":"26_CR52","doi-asserted-by":"crossref","unstructured":"Jing, Z., Hua, J., Yi, Z.: Multi-objective integrated optimization problem of preventive maintenance planning and flexible job-shop scheduling. In: Proceedings of the 23rd International Conference on Industrial Engineering and Engineering Management 2016, pp. 137\u2013141. Atlantis Press, Paris (2017)","DOI":"10.2991\/978-94-6239-255-7_25"},{"key":"26_CR53","doi-asserted-by":"publisher","first-page":"408","DOI":"10.1016\/j.procs.2017.10.081","volume":"116","author":"Rojali Zahedi","year":"2017","unstructured":"Zahedi, Rojali, Yusriski, R.: Stepwise optimization for model of integrated batch production and maintenance scheduling for single item processed on flow shop with two machines in JIT environment. Proc. Comput. Sci. 116, 408\u2013420 (2017). https:\/\/doi.org\/10.1016\/j.procs.2017.10.081","journal-title":"Proc. Comput. Sci."},{"key":"26_CR54","doi-asserted-by":"crossref","unstructured":"Le Tam, P., Aghezzaf, E.H., Khatab, A., Hieu Le, C.: Integrated production and imperfect preventive maintenance planning: an effective MILP-based relax-and-fix\/fix-and-optimize method. In: 6th International Conference on Operations Research and Enterprise Systems (ICORES 2017), pp. 483\u2013490. SCITEPRESS\u2013Science and Technology Publications, Lda (2017)","DOI":"10.5220\/0006285504830490"},{"key":"26_CR55","doi-asserted-by":"publisher","unstructured":"Vieira, M., Liu, S., Pinto-Varela, T., Barbosa-P\u00f3voa, A.P., Papageorgiou, L.G.: Optimisation of maintenance planning into the production of biopharmaceuticals with performance decay using a continuous-time formulation. In: 26th European Symposium on Computer Aided Process Engineering, pp. 1749\u20131754 (2016). https:\/\/doi.org\/10.1016\/b978-0-444-63428-3.50296-4","DOI":"10.1016\/b978-0-444-63428-3.50296-4"},{"key":"26_CR56","doi-asserted-by":"publisher","unstructured":"Kumar, S., Lad, B.K.: Effect of maintenance resource constraints on flow-shop environment in a joint production and maintenance context. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (2016). https:\/\/doi.org\/10.1109\/ieem.2016.7797954","DOI":"10.1109\/ieem.2016.7797954"},{"key":"26_CR57","doi-asserted-by":"publisher","unstructured":"Liao, W., Zhang, X., Jiang, M.: An optimization model integrated production scheduling and preventive maintenance for group production. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (2016). https:\/\/doi.org\/10.1109\/ieem.2016.7798015","DOI":"10.1109\/ieem.2016.7798015"},{"issue":"2","key":"26_CR58","doi-asserted-by":"publisher","first-page":"628","DOI":"10.1109\/tase.2014.2339281","volume":"12","author":"S Lee","year":"2015","unstructured":"Lee, S., Prabhu, V.V.: A dynamic algorithm for distributed feedback control for manufacturing production, capacity, and maintenance. IEEE Trans. Autom. Sci. Eng. 12(2), 628\u2013641 (2015). https:\/\/doi.org\/10.1109\/tase.2014.2339281","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"issue":"1","key":"26_CR59","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1177\/1748006x14545834","volume":"229","author":"X Chen","year":"2014","unstructured":"Chen, X., Xiao, L., Zhang, X.: A production scheduling problem considering random failure and imperfect preventive maintenance. Proc. Inst. Mech. Eng. O J. Risk Reliab. 229(1), 26\u201335 (2014). https:\/\/doi.org\/10.1177\/1748006x14545834","journal-title":"Proc. Inst. Mech. Eng. O J. Risk Reliab."},{"issue":"3","key":"26_CR60","doi-asserted-by":"publisher","first-page":"478","DOI":"10.1016\/j.ifacol.2015.06.127","volume":"48","author":"M Assid","year":"2015","unstructured":"Assid, M., Gharbi, A., Hajji, A.: Production planning and opportunistic preventive maintenance for unreliable one-machine two-products manufacturing systems. IFAC-PapersOnLine 48(3), 478\u2013483 (2015). https:\/\/doi.org\/10.1016\/j.ifacol.2015.06.127","journal-title":"IFAC-PapersOnLine"},{"issue":"3","key":"26_CR61","doi-asserted-by":"publisher","first-page":"747","DOI":"10.1016\/j.ifacol.2015.06.172","volume":"48","author":"HB Fakher","year":"2015","unstructured":"Fakher, H.B., Nourelfath, M., Gendreau, M.: Hybrid genetic algorithm to solve a joint production maintenance model. IFAC-PapersOnLine 48(3), 747\u2013754 (2015). https:\/\/doi.org\/10.1016\/j.ifacol.2015.06.172","journal-title":"IFAC-PapersOnLine"},{"key":"26_CR62","doi-asserted-by":"crossref","unstructured":"Ho, V.T., Hajej, Z., Le Thi, H.A., Rezg, N.: Solving the production and maintenance optimization problem by a global approach. In: Modelling, Computation and Optimization in Information Systems and Management Sciences, pp. 307\u2013318. Springer, Cham (2015)","DOI":"10.1007\/978-3-319-18167-7_27"},{"key":"26_CR63","doi-asserted-by":"crossref","unstructured":"Chen, X., Xiao, L., Zhang, X., Xiao, W., Li, J.: An integrated model of production scheduling and maintenance planning under imperfect preventive maintenance. Eksploatacja i Niezawodno\u015b\u0107, 17, 70\u201379 (2015)","DOI":"10.17531\/ein.2015.1.10"},{"key":"26_CR64","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1016\/j.ins.2014.03.097","volume":"278","author":"A Yalaoui","year":"2014","unstructured":"Yalaoui, A., Chaabi, K., Yalaoui, F.: Integrated production planning and preventive maintenance in deteriorating production systems. Inf. Sci. 278, 841\u2013861 (2014). https:\/\/doi.org\/10.1016\/j.ins.2014.03.097","journal-title":"Inf. Sci."},{"key":"26_CR65","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/j.ress.2013.07.009","volume":"121","author":"M-C Fitouhi","year":"2014","unstructured":"Fitouhi, M.-C., Nourelfath, M.: Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems. Reliab. Eng. Syst. Saf. 121, 175\u2013186 (2014). https:\/\/doi.org\/10.1016\/j.ress.2013.07.009","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"4","key":"26_CR66","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1504\/ijise.2012.046301","volume":"10","author":"E Pan","year":"2012","unstructured":"Pan, E., Liao, W., Xi, L.: A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximising the availability. Int. J. Ind. Syst. Eng. 10(4), 451 (2012). https:\/\/doi.org\/10.1504\/ijise.2012.046301","journal-title":"Int. J. Ind. Syst. Eng."},{"key":"26_CR67","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.ress.2012.02.001","volume":"101","author":"M Nourelfath","year":"2012","unstructured":"Nourelfath, M., Ch\u00e2telet, E.: Integrating production, inventory and maintenance planning for a parallel system with dependent components. Reliab. Eng. Syst. Saf. 101, 59\u201366 (2012). https:\/\/doi.org\/10.1016\/j.ress.2012.02.001","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"2","key":"26_CR68","doi-asserted-by":"publisher","first-page":"344","DOI":"10.1016\/j.ijpe.2011.12.021","volume":"136","author":"M-C Fitouhi","year":"2012","unstructured":"Fitouhi, M.-C., Nourelfath, M.: Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. Int. J. Prod. Econ. 136(2), 344\u2013351 (2012). https:\/\/doi.org\/10.1016\/j.ijpe.2011.12.021","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"26_CR69","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1108\/13552511211265884","volume":"18","author":"A Uzun","year":"2012","unstructured":"Uzun, A., Ozdogan, A.: Maintenance parameters based production policies optimization. J. Qual. Maint. Eng. 18(3), 295\u2013310 (2012). https:\/\/doi.org\/10.1108\/13552511211265884","journal-title":"J. Qual. Maint. Eng."},{"issue":"1","key":"26_CR70","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1108\/13552511211226193","volume":"18","author":"H Reza Golmakani","year":"2012","unstructured":"Reza Golmakani, H., Namazi, A.: Multiple-route job shop scheduling with fixed periodic and age-dependent preventive maintenance to minimize makespan. J. Qual. Maint. Eng. 18(1), 60\u201378 (2012). https:\/\/doi.org\/10.1108\/13552511211226193","journal-title":"J. Qual. Maint. Eng."},{"issue":"3","key":"26_CR71","doi-asserted-by":"publisher","first-page":"254","DOI":"10.1108\/13552511111157371","volume":"17","author":"R Benmansour","year":"2011","unstructured":"Benmansour, R., Allaoui, H., Artiba, A., Iassinovski, S., Pellerin, R.: Simulation-based approach to joint production and preventive maintenance scheduling on a failure-prone machine. J. Qual. Maint. Eng. 17(3), 254\u2013267 (2011). https:\/\/doi.org\/10.1108\/13552511111157371","journal-title":"J. Qual. Maint. Eng."},{"issue":"9","key":"26_CR72","doi-asserted-by":"publisher","first-page":"1584","DOI":"10.1016\/j.cor.2009.11.017","volume":"37","author":"A Berrichi","year":"2010","unstructured":"Berrichi, A., Yalaoui, F., Amodeo, L., Mezghiche, M.: Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res. 37(9), 1584\u20131596 (2010). https:\/\/doi.org\/10.1016\/j.cor.2009.11.017","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"26_CR73","doi-asserted-by":"publisher","first-page":"496","DOI":"10.1109\/tr.2010.2056412","volume":"59","author":"M Nourelfath","year":"2010","unstructured":"Nourelfath, M., Fitouhi, M.-C., Machani, M.: An integrated model for production and preventive maintenance planning in multi-state systems. IEEE Trans. Reliab. 59(3), 496\u2013506 (2010). https:\/\/doi.org\/10.1109\/tr.2010.2056412","journal-title":"IEEE Trans. Reliab."},{"issue":"4","key":"26_CR74","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2008","unstructured":"Berrichi, A., Amodeo, L., Yalaoui, F., Ch\u00e2telet, E., Mezghiche, M.: Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J. Intell. Manuf. 20(4), 389\u2013400 (2008). https:\/\/doi.org\/10.1007\/s10845-008-0113-5","journal-title":"J. Intell. Manuf."},{"issue":"12","key":"26_CR75","doi-asserted-by":"publisher","first-page":"1089","DOI":"10.1080\/09511920903207449","volume":"22","author":"Y-L Jin","year":"2009","unstructured":"Jin, Y.-L., Jiang, Z.-H., Hou, W.-R.: Integrating flexible-interval preventive maintenance planning with production scheduling. Int. J. Comput. Integr. Manuf. 22(12), 1089\u20131101 (2009). https:\/\/doi.org\/10.1080\/09511920903207449","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"26_CR76","doi-asserted-by":"publisher","unstructured":"Leng, K., Ren, P., Gao, L.: A novel approach to integrated preventive maintenance planning and production scheduling for a single machine using the chaotic particle swarm optimization algorithm. In: 2006 6th World Congress on Intelligent Control and Automation (2006). https:\/\/doi.org\/10.1109\/wcica.2006.1713491","DOI":"10.1109\/wcica.2006.1713491"},{"issue":"2","key":"26_CR77","doi-asserted-by":"publisher","first-page":"924","DOI":"10.1016\/j.amc.2004.12.030","volume":"170","author":"F Kianfar","year":"2005","unstructured":"Kianfar, F.: A numerical method to approximate optimal production and maintenance plan in a flexible manufacturing system. Appl. Math. Comput. 170(2), 924\u2013940 (2005). https:\/\/doi.org\/10.1016\/j.amc.2004.12.030","journal-title":"Appl. Math. Comput."},{"issue":"2","key":"26_CR78","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.compind.2004.06.005","volume":"56","author":"N Sortrakul","year":"2005","unstructured":"Sortrakul, N., Nachtmann, H.L., Cassady, C.R.: Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Comput. Ind. 56(2), 161\u2013168 (2005). https:\/\/doi.org\/10.1016\/j.compind.2004.06.005","journal-title":"Comput. Ind."},{"key":"26_CR79","doi-asserted-by":"publisher","unstructured":"Vassiliadis, C.G., Vassiliadou, M.G., Papageorgiou, L.G., Pistikopoulos, E.N.: Simultaneous maintenance considerations and production planning in multi-purpose plants. In: Annual Reliability and Maintainability Symposium, 2000 Proceedings, International Symposium on Product Quality and Integrity (Cat. No.00CH37055) (n.d.). https:\/\/doi.org\/10.1109\/rams.2000.816312","DOI":"10.1109\/rams.2000.816312"}],"container-title":["Communications in Computer and Information Science","Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-76307-7_26","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,11]],"date-time":"2021-05-11T20:24:40Z","timestamp":1620764680000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-76307-7_26"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030763060","9783030763077"],"references-count":79,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-76307-7_26","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"12 May 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICPR-Americas","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference of Production Research \u2013 Americas","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Bah\u00eda Blanca","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Argentina","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 December 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 December 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icpramericas2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.matematica.uns.edu.ar\/ipcra\/default.php","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"275","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"41","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"11","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"15% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.7","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Due to the COVID-19 pandemic the conference was held online.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}