{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T19:41:33Z","timestamp":1743104493706,"version":"3.40.3"},"publisher-location":"Cham","reference-count":27,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030763091"},{"type":"electronic","value":"9783030763107"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-76310-7_8","type":"book-chapter","created":{"date-parts":[[2021,5,11]],"date-time":"2021-05-11T20:03:07Z","timestamp":1620763387000},"page":"102-112","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Simultaneous Lot-Sizing and Scheduling with Recovery Options: Problem Formulation and Analysis of the Single-Product Case"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-9155-7968","authenticated-orcid":false,"given":"Pedro","family":"Pi\u00f1eyro","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2381-4352","authenticated-orcid":false,"given":"Daniel Alejandro","family":"Rossit","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,5,12]]},"reference":[{"issue":"1","key":"8_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00291-015-0429-4","volume":"39","author":"K Copil","year":"2016","unstructured":"Copil, K., W\u00f6rbelauer, M., Meyr, H., Tempelmeier, H.: Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectr. 39(1), 1\u201364 (2016). https:\/\/doi.org\/10.1007\/s00291-015-0429-4","journal-title":"OR Spectr."},{"key":"8_CR2","doi-asserted-by":"publisher","first-page":"225","DOI":"10.1016\/j.cor.2013.10.001","volume":"43","author":"M Fazle Baki","year":"2014","unstructured":"Fazle Baki, M., Chaouch, B.A., Abdul-Kader, W.: A heuristic solution procedure for the dynamic lot sizing problem with remanufacturing and product recovery. Comput. Oper. Res. 43, 225\u2013236 (2014)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"8_CR3","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/0377-2217(90)90245-7","volume":"44","author":"B Fleischmann","year":"1990","unstructured":"Fleischmann, B.: The discrete lot-sizing and scheduling problem. Euro. J. Oper. Res. 44(3), 337\u2013348 (1990)","journal-title":"Euro. J. Oper. Res."},{"issue":"2","key":"8_CR4","doi-asserted-by":"publisher","first-page":"395","DOI":"10.1016\/0377-2217(94)90083-3","volume":"75","author":"B Fleischmann","year":"1994","unstructured":"Fleischmann, B.: The discrete lot-sizing and scheduling problem with sequence-dependent setup costs. Euro. J. Oper. Res. 75(2), 395\u2013404 (1994)","journal-title":"Euro. J. Oper. Res."},{"issue":"2","key":"8_CR5","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/j.ejor.2014.02.027","volume":"237","author":"C Gicquel","year":"2014","unstructured":"Gicquel, C., Lisser, A., Minoux, M.: An evaluation of semidefinite programming based approaches for discrete lot-sizing problems. Euro. J. Oper. Res. 237(2), 498\u2013507 (2014)","journal-title":"Euro. J. Oper. Res."},{"key":"8_CR6","doi-asserted-by":"publisher","first-page":"624","DOI":"10.1016\/j.jclepro.2017.01.166","volume":"148","author":"D Giglio","year":"2017","unstructured":"Giglio, D., Paolucci, M., Roshani, A.: Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing\/remanufacturing systems. J. Clean. Prod. 148, 624\u2013641 (2017)","journal-title":"J. Clean. Prod."},{"issue":"1","key":"8_CR7","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1080\/07408170490247296","volume":"36","author":"R Jans","year":"2004","unstructured":"Jans, R., Degraeve, Z.: An industrial extension of the discrete lot-sizing and scheduling problem. IIE Trans. 36(1), 47\u201358 (2004)","journal-title":"IIE Trans."},{"key":"8_CR8","doi-asserted-by":"crossref","unstructured":"Kuik, R., Salomon, M., Van Hoesel, S., Van Wassenhove, L.N.: The single item discrete lotsizing and scheduling problem: Linear description and optimization. Technical report, Erasmus University (1989)","DOI":"10.1007\/BFb0008407"},{"key":"8_CR9","doi-asserted-by":"publisher","first-page":"3225","DOI":"10.1016\/j.jclepro.2017.11.023","volume":"172","author":"J Kurilova-Palisaitiene","year":"2018","unstructured":"Kurilova-Palisaitiene, J., Sundin, E., Poksinska, B.: Remanufacturing challenges and possible lean improvements. J. Clean. Prod. 172, 3225\u20133236 (2018)","journal-title":"J. Clean. Prod."},{"issue":"6","key":"8_CR10","doi-asserted-by":"publisher","first-page":"607","DOI":"10.1007\/s11740-016-0700-9","volume":"10","author":"CH Liu","year":"2016","unstructured":"Liu, C.H.: Discrete lot-sizing and scheduling problems considering renewable energy and CO2 emissions. Prod. Eng. 10(6), 607\u2013614 (2016)","journal-title":"Prod. Eng."},{"issue":"1","key":"8_CR11","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1186\/2210-4690-1-2","volume":"1","author":"M Matsumoto","year":"2011","unstructured":"Matsumoto, M., Umeda, Y.: An analysis of remanufacturing practices in Japan. J. Remanuf. 1(1), 2 (2011)","journal-title":"J. Remanuf."},{"issue":"2","key":"8_CR12","doi-asserted-by":"crossref","first-page":"217","DOI":"10.3934\/jimo.2009.5.217","volume":"5","author":"P Pi\u00f1eyro","year":"2009","unstructured":"Pi\u00f1eyro, P., Viera, O.: Inventory policies for the economic lot-sizing problem with remanufacturing and final disposal options. J. Ind. Manage. Optim 5(2), 217\u2013238 (2009)","journal-title":"J. Ind. Manage. Optim"},{"issue":"1","key":"8_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/s13243-015-0021-8","volume":"5","author":"P Pi\u00f1eyro","year":"2015","unstructured":"Pi\u00f1eyro, P., Viera, O.: The economic lot-sizing problem with remanufacturing: analysis and an improved algorithm. J. Remanuf. 5(1), 1\u201313 (2015). https:\/\/doi.org\/10.1186\/s13243-015-0021-8","journal-title":"J. Remanuf."},{"issue":"1","key":"8_CR14","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1007\/s13243-018-0044-z","volume":"8","author":"P Pi\u00f1eyro","year":"2018","unstructured":"Pi\u00f1eyro, P., Viera, O.: Heuristic procedure for the economic lot-sizing problem with remanufacturing and recovery targets. J. Remanuf. 8(1), 39\u201350 (2018)","journal-title":"J. Remanuf."},{"issue":"2","key":"8_CR15","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1016\/S0377-2217(99)00219-2","volume":"121","author":"K Richter","year":"2000","unstructured":"Richter, K., Sombrutzki, M.: Remanufacturing planning for the reverse Wagner\/whitin models. Euro. J. Oper. Res. 121(2), 304\u2013315 (2000)","journal-title":"Euro. J. Oper. Res."},{"issue":"1","key":"8_CR16","doi-asserted-by":"publisher","first-page":"447","DOI":"10.1016\/S0925-5273(00)00142-0","volume":"71","author":"K Richter","year":"2001","unstructured":"Richter, K., Weber, J.: The reverse Wagner\/whitin model with variable manufacturing and remanufacturing cost. Int. J. Prod. Econ. 71(1), 447\u2013456 (2001)","journal-title":"Int. J. Prod. Econ."},{"issue":"7","key":"8_CR17","doi-asserted-by":"publisher","first-page":"801","DOI":"10.1287\/mnsc.37.7.801","volume":"37","author":"M Salomon","year":"1991","unstructured":"Salomon, M., Kroon, L.G., Kuik, R., Van Wassenhove, L.N.: Some extensions of the discrete lotsizing and scheduling problem. Manage. Sci. 37(7), 801\u2013812 (1991)","journal-title":"Manage. Sci."},{"issue":"9","key":"8_CR18","doi-asserted-by":"publisher","first-page":"2519","DOI":"10.1080\/00207543.2010.532916","volume":"49","author":"T Schulz","year":"2011","unstructured":"Schulz, T.: A new silver-meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing. Int. J. Prod. Res. 49(9), 2519\u20132533 (2011)","journal-title":"Int. J. Prod. Res."},{"key":"8_CR19","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1016\/j.ijpe.2014.10.003","volume":"160","author":"A Sifaleras","year":"2015","unstructured":"Sifaleras, A., Konstantaras, I., Mladenovi\u0107, N.: Variable neighborhood search for the economic lot sizing problem with product returns and recovery. Int. J. Prod. Econ. 160, 133\u2013143 (2015)","journal-title":"Int. J. Prod. Econ."},{"key":"8_CR20","doi-asserted-by":"publisher","first-page":"559","DOI":"10.1016\/j.jclepro.2017.09.184","volume":"170","author":"H Sun","year":"2018","unstructured":"Sun, H., Chen, W., Liu, B., Chen, X.: Economic lot scheduling problem in a remanufacturing system with returns at different quality grades. J. Clean. Prod. 170, 559\u2013569 (2018)","journal-title":"J. Clean. Prod."},{"issue":"1","key":"8_CR21","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/j.ejor.2020.04.043","volume":"287","author":"E Suzanne","year":"2020","unstructured":"Suzanne, E., Absi, N., Borodin, V.: Towards circular economy in production planning: challenges and opportunities. Euro. J. Oper. Res. 287(1), 168\u2013190 (2020)","journal-title":"Euro. J. Oper. Res."},{"issue":"20","key":"8_CR22","doi-asserted-by":"publisher","first-page":"4377","DOI":"10.1080\/00207540600693564","volume":"44","author":"RH Teunter","year":"2006","unstructured":"Teunter, R.H., Bayindir, Z.P., Den Heuvel, W.V.: Dynamic lot sizing with product returns and remanufacturing. Int. J. Prod. Res. 44(20), 4377\u20134400 (2006)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"8_CR23","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/S0167-6377(96)00043-0","volume":"20","author":"C Van Eijl","year":"1997","unstructured":"Van Eijl, C., Van Hoesel, C.: On the discrete lot-sizing and scheduling problem with wagner-whitin costs. Oper. Res. Lett. 20(1), 7\u201313 (1997)","journal-title":"Oper. Res. Lett."},{"issue":"3","key":"8_CR24","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/0166-218X(92)00182-L","volume":"48","author":"S Van Hoesel","year":"1994","unstructured":"Van Hoesel, S., Kuik, R., Salomon, M., Van Wassenhove, L.N.: The single-item discrete lotsizing and scheduling problem: optimization by linear and dynamic programming. Discrete Appl. Math. 48(3), 289\u2013303 (1994)","journal-title":"Discrete Appl. Math."},{"issue":"1","key":"8_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00291-018-0536-0","volume":"41","author":"M W\u00f6rbelauer","year":"2018","unstructured":"W\u00f6rbelauer, M., Meyr, H., Almada-Lobo, B.: Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification. OR Spectr. 41(1), 1\u201343 (2018). https:\/\/doi.org\/10.1007\/s00291-018-0536-0","journal-title":"OR Spectr."},{"issue":"5","key":"8_CR26","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1002\/nav.20089","volume":"52","author":"J Yang","year":"2005","unstructured":"Yang, J., Golany, B., Yu, G.: A concave-cost production planning problem with remanufacturing options. Naval Res. Logist. 52(5), 443\u2013458 (2005)","journal-title":"Naval Res. Logist."},{"issue":"4","key":"8_CR27","doi-asserted-by":"publisher","first-page":"1025","DOI":"10.1016\/j.cie.2011.12.030","volume":"62","author":"S Zanoni","year":"2012","unstructured":"Zanoni, S., Segerstedt, A., Tang, O., Mazzoldi, L.: Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy. Comput. Ind. Eng. 62(4), 1025\u20131033 (2012)","journal-title":"Comput. Ind. Eng."}],"container-title":["Communications in Computer and Information Science","Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-76310-7_8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,12,27]],"date-time":"2022-12-27T01:28:11Z","timestamp":1672104491000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-76310-7_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030763091","9783030763107"],"references-count":27,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-76310-7_8","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"12 May 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICPR-Americas","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference of Production Research \u2013 Americas","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Bah\u00eda Blanca","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Argentina","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2020","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 December 2020","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 December 2020","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icpramericas2020","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.matematica.uns.edu.ar\/ipcra\/default.php","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"275","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"41","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"11","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"15% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.7","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Due to the COVID-19 pandemic the conference was held online.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}