{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,24]],"date-time":"2026-02-24T19:44:20Z","timestamp":1771962260457,"version":"3.50.1"},"publisher-location":"Cham","reference-count":26,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030791490","type":"print"},{"value":"9783030791506","type":"electronic"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2021,6,22]],"date-time":"2021-06-22T00:00:00Z","timestamp":1624320000000},"content-version":"vor","delay-in-days":172,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"abstract":"<jats:title>Abstract<\/jats:title>\n          <jats:p>In recent years, the European Steel Industry, in particular flat steel production, is facing an increasingly competitive market situation. The product price is determined by competition, and the only way to increase profit is to reduce production and commercial costs. One method to increase production yield is to create proper scheduling for the components on the available machines, so that an order is timely completed, optimizing resource exploitation and minimizing delays. The optimization of production using efficient scheduling strategies has received ever increasing attention over time and is one of the most investigated optimization problems. The paper presents three approaches for improving flexibility of production scheduling in flat steel facilities. Each method has different scopes and modelling aspects: an auction-based multi-agent system is used to deal with production uncertainties, a multi-objective mixed-integer linear programming-based approach is applied for global optimal scheduling of resources under steady conditions, and a continuous flow model approach provides long-term production scheduling. Simulation results show the goodness of each method and their suitability to different production conditions, by highlighting their advantages and limitations.<\/jats:p>","DOI":"10.1007\/978-3-030-79150-6_49","type":"book-chapter","created":{"date-parts":[[2021,6,21]],"date-time":"2021-06-21T23:35:17Z","timestamp":1624318517000},"page":"619-632","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Improving the Flexibility of Production Scheduling in Flat Steel Production Through Standard and AI-Based Approaches: Challenges and Perspectives"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-5924-7057","authenticated-orcid":false,"given":"Vincenzo","family":"Iannino","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9574-0575","authenticated-orcid":false,"given":"Valentina","family":"Colla","sequence":"additional","affiliation":[]},{"given":"Alessandro","family":"Maddaloni","sequence":"additional","affiliation":[]},{"given":"Jens","family":"Brandenburger","sequence":"additional","affiliation":[]},{"given":"Ahmad","family":"Rajabi","sequence":"additional","affiliation":[]},{"given":"Andreas","family":"Wolff","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9677-6764","authenticated-orcid":false,"given":"Joaquin","family":"Ordieres","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9997-0266","authenticated-orcid":false,"given":"Miguel","family":"Gutierrez","sequence":"additional","affiliation":[]},{"given":"Erwin","family":"Sirovnik","sequence":"additional","affiliation":[]},{"given":"Dirk","family":"Mueller","sequence":"additional","affiliation":[]},{"given":"Christoph","family":"Schirm","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,6,22]]},"reference":[{"issue":"2","key":"49_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/met10020288","volume":"10","author":"TA Branca","year":"2020","unstructured":"Branca, T.A., Fornai, B., Colla, V., Murri, M.M., Streppa, E., Schr\u00f6der, A.J.: The challenge of digitalization in the steel sector. Metals 10(2), 1\u201323 (2020)","journal-title":"Metals"},{"key":"49_CR2","doi-asserted-by":"crossref","unstructured":"Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty: survey and research directions. In: 2014 International Conference on Advanced Logistics and Transport (ICALT), pp. 229\u2013234. IEEE (2014).","DOI":"10.1109\/ICAdLT.2014.6866316"},{"issue":"2","key":"49_CR3","doi-asserted-by":"publisher","first-page":"178","DOI":"10.1080\/09537280410001662466","volume":"15","author":"PI Cowling","year":"2004","unstructured":"Cowling, P.I., Ouelhadj, D., Petrovic, S.: Dynamic scheduling of steel casting and milling using multi-agents. Prod. Plan. Control 15(2), 178\u2013188 (2004)","journal-title":"Prod. Plan. Control"},{"key":"49_CR4","volume-title":"Computers and Intractability: A Guide to the Theory of NP-Completeness","author":"MR Garey","year":"1979","unstructured":"Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness, 1st edn. W. H. Freeman and Co., New York (1979)","edition":"1"},{"key":"49_CR5","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1016\/j.cie.2019.03.011","volume":"130","author":"Q Guo","year":"2019","unstructured":"Guo, Q., Tang, L.: Modelling and discrete differential evolution algorithm for order rescheduling problem in steel industry. Comput. Ind. Eng. 130, 586\u2013596 (2019)","journal-title":"Comput. Ind. Eng."},{"issue":"11\u201312","key":"49_CR6","doi-asserted-by":"publisher","first-page":"1647","DOI":"10.1016\/S0098-1354(01)00729-3","volume":"25","author":"I Harjunkoski","year":"2001","unstructured":"Harjunkoski, I., Grossmann, I.E.: A decomposition approach for the scheduling of a steel plant production. Comput. Chem. Eng. 25(11\u201312), 1647\u20131660 (2001)","journal-title":"Comput. Chem. Eng."},{"issue":"1","key":"49_CR7","first-page":"1","volume":"12","author":"H Heydarabadi","year":"2020","unstructured":"Heydarabadi, H., Doniavi, A., Babazadeh, R., Azar, H.S.: Optimal production-distribution planning in electromotor manufacturing industries: a case study. Int. J. Adv. Oper. Manage. 12(1), 1\u201327 (2020)","journal-title":"Int. J. Adv. Oper. Manage."},{"key":"49_CR8","doi-asserted-by":"publisher","first-page":"663","DOI":"10.1016\/j.proeng.2012.01.020","volume":"29","author":"DL Hou","year":"2012","unstructured":"Hou, D.L., Li, T.K.: Analysis of random disturbances on shop floor in modern steel production dynamic environment. Procedia Eng. 29, 663\u2013667 (2012)","journal-title":"Procedia Eng."},{"key":"49_CR9","doi-asserted-by":"crossref","unstructured":"Hong, Y., Wang, X.: Robust operation optimization in cold rolling production process. In: 26th Chinese Control and Decision Conference (2014 CCDC), pp. 1365\u20131370. IEEE (2014)","DOI":"10.1109\/CCDC.2014.6852379"},{"key":"49_CR10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-48318-9","volume-title":"Multiple Attribute Decision Making","author":"C-L Hwang","year":"1981","unstructured":"Hwang, C.-L., Yoon, K.: Multiple Attribute Decision Making, 1st edn. Springer, Berlin (1981). https:\/\/doi.org\/10.1007\/978-3-642-48318-9","edition":"1"},{"key":"49_CR11","series-title":"Advances in Intelligent Systems and Computing","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1007\/978-3-030-72654-6_12","volume-title":"Trends and Applications in Information Systems and Technologies","author":"V Iannino","year":"2021","unstructured":"Iannino, V., Mocci, C., Colla, V.: A brokering-based interaction protocol for dynamic resource allocation in steel production processes. In: Rocha, \u00c1., Adeli, H., Dzemyda, G., Moreira, F., Ramalho Correia, A.M. (eds.) Trends and Applications in Information Systems and Technologies. AISC, vol. 1368, pp. 119\u2013129. Springer, Cham (2021). https:\/\/doi.org\/10.1007\/978-3-030-72654-6_12"},{"issue":"5","key":"49_CR12","first-page":"1","volume":"19","author":"V Iannino","year":"2018","unstructured":"Iannino, V., Vannocci, M., Vannucci, M., Colla, V., Neuer, M.: A multi-agent approach for the self-optimization of steel production. Int. J. Simul. Syst. Sci. Technol. 19(5), 1\u201320 (2018)","journal-title":"Int. J. Simul. Syst. Sci. Technol."},{"issue":"13","key":"49_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/app9132692","volume":"9","author":"M Iglesias-Escudero","year":"2019","unstructured":"Iglesias-Escudero, M., Villanueva-Balsera, J., Ortega-Fernandez, F., Rodriguez-Montequ\u00edn, V.: Planning and scheduling with uncertainty in the steel sector: a review. Appl. Sci. 9(13), 1\u201315 (2019)","journal-title":"Appl. Sci."},{"issue":"2\u20133","key":"49_CR14","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/S0377-2217(97)00277-4","volume":"106","author":"L Lopez","year":"1998","unstructured":"Lopez, L., Carter, M.W., Gendreau, M.: The hot strip mill production scheduling problem: a tabu search approach. Eur. J. Oper. Res. 106(2\u20133), 317\u2013335 (1998)","journal-title":"Eur. J. Oper. Res."},{"key":"49_CR15","doi-asserted-by":"publisher","first-page":"638","DOI":"10.1016\/j.applthermaleng.2015.08.051","volume":"91","author":"A Maddaloni","year":"2015","unstructured":"Maddaloni, A., Porzio, G.F., Nastasi, G., Colla, V., Branca, T.A.: Multi-objective optimization applied to retrofit analysis: a case study for the iron and steel industry. Appl. Therm. Eng. 91, 638\u2013646 (2015)","journal-title":"Appl. Therm. Eng."},{"key":"49_CR16","doi-asserted-by":"publisher","first-page":"2569","DOI":"10.1007\/s12649-016-9768-x","volume":"8","author":"I Matino","year":"2017","unstructured":"Matino, I., Colla, V., Branca, T.A., Romaniello, L.: Optimization of by-products reuse in the steel industry: valorization of secondary resources with a particular attention on their pellettization. Waste Biomass Valor 8, 2569\u20132581 (2017)","journal-title":"Waste Biomass Valor"},{"key":"49_CR17","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/j.compchemeng.2015.02.005","volume":"79","author":"J Mori","year":"2015","unstructured":"Mori, J., Mahalec, V.: Planning and scheduling of steel plates production. Part I: estimation of production times via hybrid Bayesian networks for large domain of discrete variables. Comput. Chem. Eng. 79, 113\u2013134 (2015)","journal-title":"Comput. Chem. Eng."},{"issue":"1","key":"49_CR18","first-page":"1","volume":"16","author":"G Nastasi","year":"2015","unstructured":"Nastasi, G., Colla, V., Del Seppia, M.: A multi-objective coil route planning system for the steelmaking industry based on evolutionary algorithms. Int. J. Simul. Syst. Sci. Technol. 16(1), 1\u20138 (2015)","journal-title":"Int. J. Simul. Syst. Sci. Technol."},{"key":"49_CR19","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10951-008-0090-8","volume":"12","author":"D Ouelhadj","year":"2009","unstructured":"Ouelhadj, D., Petrovic, S.: A survey of dynamic scheduling in manufacturing systems. J. Sched. 12, 417\u2013431 (2009)","journal-title":"J. Sched."},{"issue":"3","key":"49_CR20","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.aei.2004.10.003","volume":"18","author":"D Ouelhadj","year":"2004","unstructured":"Ouelhadj, D., Petrovic, S., Cowling, P.I., Meisels, A.: Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production. Adv. Eng. Inform. 18(3), 161\u2013172 (2004)","journal-title":"Adv. Eng. Inform."},{"key":"49_CR21","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1007\/BF01441209","volume":"4","author":"R Suri","year":"1994","unstructured":"Suri, R., Fu, B.R.: On using continuous flow lines to model discrete production lines. Discret. Event Dyn. Syst. 4, 129\u2013169 (1994)","journal-title":"Discret. Event Dyn. Syst."},{"issue":"4","key":"49_CR22","doi-asserted-by":"publisher","first-page":"529","DOI":"10.2355\/isijinternational.49.529","volume":"49","author":"L Tang","year":"2009","unstructured":"Tang, L., Zhang, X., Guo, Q.: Two hybrid metaheuristic algorithms for hot rolling scheduling. ISIJ Int. 49(4), 529\u2013538 (2009)","journal-title":"ISIJ Int."},{"key":"49_CR23","doi-asserted-by":"publisher","first-page":"633","DOI":"10.1007\/s00170-006-0740-y","volume":"35","author":"L Tang","year":"2008","unstructured":"Tang, L., Wang, X.: A predictive reactive scheduling method for color-coating production in steel industry. Int. J. Adv. Manuf. Technol. 35, 633\u2013645 (2008)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"49_CR24","doi-asserted-by":"crossref","unstructured":"Valls Verdejo, V., Alarc\u00f3, M.A.P., Sorl\u00ed, M.P.L.: Scheduling in a continuous galvanizing line. Comput. Oper. Res. 36(1), 280\u2013296 (2009)","DOI":"10.1016\/j.cor.2007.09.006"},{"issue":"1","key":"49_CR25","doi-asserted-by":"publisher","first-page":"12114","DOI":"10.3182\/20110828-6-IT-1002.01296","volume":"44","author":"L Wang","year":"2011","unstructured":"Wang, L., Zhao, J., Wang, W., Cong, L.: Dynamic scheduling with production process reconfiguration for cold rolling line. IFAC Proc. Volumes 44(1), 12114\u201312119 (2011)","journal-title":"IFAC Proc. Volumes"},{"issue":"5","key":"49_CR26","doi-asserted-by":"publisher","first-page":"565","DOI":"10.3724\/SP.J.1004.2008.00565","volume":"34","author":"J Zhao","year":"2008","unstructured":"Zhao, J., Liu, Q.L., Wang, W.: Models and algorithms of production scheduling in tandem cold rolling. Acta Autom. Sin. 34(5), 565\u2013573 (2008)","journal-title":"Acta Autom. Sin."}],"container-title":["IFIP Advances in Information and Communication Technology","Artificial Intelligence Applications and Innovations"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-79150-6_49","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,21]],"date-time":"2025-06-21T22:03:20Z","timestamp":1750543400000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-79150-6_49"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030791490","9783030791506"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-79150-6_49","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"22 June 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"AIAI","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Artificial Intelligence Applications and Innovations","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Hersonissos, Crete","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Greece","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"25 June 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"27 June 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"17","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"aiai2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.aiai2021.eu\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"easyacademia.org","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"113","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"50","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"11","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"44% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.7","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.8","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"No","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}