{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T03:43:06Z","timestamp":1776829386368,"version":"3.51.2"},"publisher-location":"Cham","reference-count":22,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783030858735","type":"print"},{"value":"9783030858742","type":"electronic"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-85874-2_43","type":"book-chapter","created":{"date-parts":[[2021,8,31]],"date-time":"2021-08-31T17:02:37Z","timestamp":1630429357000},"page":"409-415","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Tabu Search Algorithm for Single and Multi-model Line Balancing Problems"],"prefix":"10.1007","author":[{"given":"Mohamed Amine","family":"Abdeljaouad","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nathalie","family":"Klement","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,8,31]]},"reference":[{"key":"43_CR1","doi-asserted-by":"publisher","first-page":"574","DOI":"10.1016\/j.asoc.2012.07.024","volume":"13","author":"S Akpinar","year":"2013","unstructured":"Akpinar, S., Bayhan, G.M., Baykasoglu, A.: Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks. Appl. Soft Comput. 13, 574\u2013589 (2013)","journal-title":"Appl. Soft Comput."},{"issue":"2","key":"43_CR2","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1007\/s10845-014-0978-4","volume":"28","author":"MH Alavidoost","year":"2014","unstructured":"Alavidoost, M.H., Zarandi, M.H.F., Tarimoradi, M., Nemati, Y.: Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times. J. Intell. Manuf. 28(2), 313\u2013336 (2014). https:\/\/doi.org\/10.1007\/s10845-014-0978-4","journal-title":"J. Intell. Manuf."},{"issue":"1","key":"43_CR3","doi-asserted-by":"crossref","first-page":"162","DOI":"10.35378\/gujs.690131","volume":"34","author":"M Arikan","year":"2021","unstructured":"Arikan, M.: Type-2 assembly line balancing with workload smoothing objective: a reactive tabu search algorithm. Gazi University Journal of Science 34(1), 162\u2013178 (2021)","journal-title":"Gazi University Journal of Science"},{"key":"43_CR4","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1007\/s10845-005-6638-y","volume":"17","author":"A Baykasoglu","year":"2006","unstructured":"Baykasoglu, A.: Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. J. Intell. Manuf. 17, 217\u2013232 (2006)","journal-title":"J. Intell. Manuf."},{"key":"43_CR5","unstructured":"Chong, K.E., Omar, M.K., Baker, N.A.: Solving assembly line balancing problem using genetic algorithm with heuristic treated initial population. In: Proceedings of the World Congress on Engineering, pp. 978\u2013988 (2008)"},{"key":"43_CR6","unstructured":"\u00c7il, Z.A., Li, Z., Mete, S., \u00d6zceylan, E.: Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human-robot collaboration"},{"issue":"04","key":"43_CR7","doi-asserted-by":"publisher","first-page":"347","DOI":"10.4236\/jsea.2010.34040","volume":"03","author":"P Chutima","year":"2010","unstructured":"Chutima, P., Olanviwatchai, P.: Mixed-Model U-shaped assembly line balancing problems with coincidence memetic algorithm. J. Softw. Eng. Appl. 03(04), 347\u2013363 (2010). https:\/\/doi.org\/10.4236\/jsea.2010.34040","journal-title":"J. Softw. Eng. Appl."},{"key":"43_CR8","doi-asserted-by":"crossref","unstructured":"Fatini, D.M., Mohammad, F.R., Mohd, Z.Z.: A review on hybrid metaheuristics in solving assembly line balancing problem. AIP Conf. Proc. 2138(1) (2019)","DOI":"10.1063\/1.5121096"},{"issue":"2","key":"43_CR9","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1016\/S0360-8352(97)00142-3","volume":"34","author":"H Gokcen","year":"1998","unstructured":"Gokcen, H., Erel, E.: Binary integer formulation for mixed model assembly line balancing problem. Comput. Ind. Eng. 34(2), 451\u2013461 (1998)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"43_CR10","doi-asserted-by":"publisher","first-page":"308","DOI":"10.1287\/mnsc.11.2.308","volume":"11","author":"AL Gutjahr","year":"1964","unstructured":"Gutjahr, A.L., Nemhauser, G.L.: An algorithm for the line balancing problem. Manage. Sci. 11(2), 308\u2013315 (1964)","journal-title":"Manage. Sci."},{"key":"43_CR11","doi-asserted-by":"crossref","unstructured":"Kilincci O.: A Petri net-based heuristic for simple assembly line balancing problem of type 2. Int. J. Adv. Manuf. Technol. 46, 329\u2013338 (2010)","DOI":"10.1007\/s00170-009-2082-z"},{"issue":"2","key":"43_CR12","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1016\/0377-2217(95)00047-X","volume":"91","author":"R Klein","year":"1996","unstructured":"Klein, R., Scholl, A.: Maximizing the production rate in simple assembly line balancing\u2014a branch and bound procedure. Eur. J. Oper. Res. 91(2), 367\u2013385 (1996)","journal-title":"Eur. J. Oper. Res."},{"issue":"32","key":"43_CR13","doi-asserted-by":"publisher","first-page":"600","DOI":"10.1016\/j.ifacol.2018.11.489","volume":"51","author":"M Lalaoui","year":"2018","unstructured":"Lalaoui, M., El Afia, A.: A fuzzy generalized simulated annealing for a simple assembly line balancing problem. IFAC-PapersOnLine 51(32), 600\u2013605 (2018)","journal-title":"IFAC-PapersOnLine"},{"key":"43_CR14","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.cie.2018.06.037","volume":"124","author":"Z Li","year":"2018","unstructured":"Li, Z., Kucukkoc, I., Zhang, Z.: Branch, bound and remember algorithm for U-shaped assembly line balancing problem. Comput. Ind. Eng. 124, 24\u201335 (2018)","journal-title":"Comput. Ind. Eng."},{"key":"43_CR15","doi-asserted-by":"publisher","first-page":"238","DOI":"10.1016\/j.jmsy.2012.11.003","volume":"32","author":"A Roshani","year":"2013","unstructured":"Roshani, A., Roshani, A., Roshani, A., Salehi, M., Esfandyari, A.: A simulated annealing algorithm for multi-manned assembly line balancing problem. J. Manuf. Syst. 32, 238\u2013247 (2013)","journal-title":"J. Manuf. Syst."},{"issue":"3","key":"43_CR16","doi-asserted-by":"publisher","first-page":"609","DOI":"10.1016\/S0360-8352(97)00320-3","volume":"34","author":"BR Sarker","year":"2001","unstructured":"Sarker, B.R., Pan, H.: Designing a mixed-model assembly line to minimize the costs of idle and utility times. Comput. Ind. Eng. 34(3), 609\u2013628 (2001)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"43_CR17","doi-asserted-by":"publisher","first-page":"666","DOI":"10.1016\/j.ejor.2004.07.022","volume":"168","author":"A Scholl","year":"2006","unstructured":"Scholl, A., Becker, C.: State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. Eur. J. Oper. Res. 168(3), 666\u2013693 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"9-12","key":"43_CR18","doi-asserted-by":"publisher","first-page":"1665","DOI":"10.1007\/s00170-014-5944-y","volume":"73","author":"P Sivasankaran","year":"2014","unstructured":"Sivasankaran, P., Shahabudeen, P.: Literature review of assembly line balancing problems. Int. J. Adv. Manuf. Technol. 73(9\u201312), 1665\u20131694 (2014). https:\/\/doi.org\/10.1007\/s00170-014-5944-y","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"43_CR19","doi-asserted-by":"crossref","unstructured":"Suwannarongsri, S, Limnararat, S.: A hybrid tabu search method for assembly line balancing. In: Proceedings of the 7th International Conference on Simulation (modelling and optimization) China (2007)","DOI":"10.1109\/IEEM.2007.4419365"},{"key":"43_CR20","doi-asserted-by":"publisher","first-page":"333","DOI":"10.1007\/s00170-009-2264-8","volume":"48","author":"YJ Tseng","year":"2010","unstructured":"Tseng, Y.J., Chen, J.Y., Huang, F.Y.: A multi-plant assembly sequence planning model with integrated assembly sequence planning and plant assignment using GA. Int. J. Adv. Manuf. Technol. 48, 333\u2013345 (2010)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"43_CR21","doi-asserted-by":"publisher","first-page":"1155","DOI":"10.1016\/j.cie.2009.05.004","volume":"57","author":"DH Yeh","year":"2009","unstructured":"Yeh, D.H., Kao, H.H.: A new bidirectional heuristic for the assembly line balancing problem. Comput. Ind. Eng. 57, 1155\u20131160 (2009)","journal-title":"Comput. Ind. Eng."},{"key":"43_CR22","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1007\/s10845-009-0295-5","volume":"22","author":"W Zhang","year":"2011","unstructured":"Zhang, W., Gen, M.: An efficient multi-objective genetic algorithm for mixed-model assembly line balancing problem considering demand ratio-based cycle time. J. Intell. Manuf. 22, 367\u2013378 (2011)","journal-title":"J. Intell. Manuf."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-85874-2_43","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,30]],"date-time":"2025-08-30T22:04:14Z","timestamp":1756591454000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-85874-2_43"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030858735","9783030858742"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-85874-2_43","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"31 August 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Nantes","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"France","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 September 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 September 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Conftool","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"529","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"378","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"71% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.2","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.3","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"The conference was held virtually.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}