{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,31]],"date-time":"2025-08-31T22:40:09Z","timestamp":1756680009606,"version":"3.44.0"},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030859138"},{"type":"electronic","value":"9783030859145"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-85914-5_55","type":"book-chapter","created":{"date-parts":[[2021,9,1]],"date-time":"2021-09-01T13:03:17Z","timestamp":1630501397000},"page":"517-525","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Multi-fidelity Simulation-Based Optimisation for Large-Scale Production Release Planning in Wafer Fabs"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5229-9142","authenticated-orcid":false,"given":"Zhengmin","family":"Zhang","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2295-6698","authenticated-orcid":false,"given":"Zailin","family":"Guan","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9270-5507","authenticated-orcid":false,"given":"Yeming","family":"Gong","sequence":"additional","affiliation":[]},{"given":"Qian","family":"Shen","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,8,31]]},"reference":[{"issue":"3","key":"55_CR1","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1007\/s00170-005-0185-8","volume":"31","author":"SH Chung","year":"2006","unstructured":"Chung, S.H., Lai, C.: Job releasing and throughput planning for wafer fabrication under demand fluctuating make-to-stock environment. Int. J. Adv. Manuf. Technol. 31(3), 316\u2013327 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1","key":"55_CR2","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1109\/TSM.2005.863214","volume":"19","author":"J Asmundsson","year":"2006","unstructured":"Asmundsson, J., Rardin, R.L., Uzsoy, R.: Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf. 19(1), 95\u2013111 (2006)","journal-title":"IEEE Trans. Semicond. Manuf."},{"key":"55_CR3","unstructured":"Leachman, R.C.: Semiconductor production planning. In: Handbook of Applied Optimisation, pp. 746\u2013762. Oxford University, New York (2001)"},{"issue":"21","key":"55_CR4","doi-asserted-by":"publisher","first-page":"6585","DOI":"10.1080\/00207543.2019.1683252","volume":"58","author":"F Zhang","year":"2020","unstructured":"Zhang, F., Song, J., Dai, Y., Xu, J.: Semiconductor wafer fabrication production planning using multi-fidelity simulation-based optimisation. Int. J. Prod. Res. 58(21), 6585\u20136600 (2020)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"55_CR5","doi-asserted-by":"publisher","first-page":"1741","DOI":"10.1080\/00207543.2018.1504250","volume":"57","author":"M Thuerer","year":"2019","unstructured":"Thuerer, M., Stevenson, M., Land, M., Fredendall, L.: On the combined effect of due date setting, order release, and output control: an assessment by simulation. Int. J. Prod. Res. 57(6), 1741\u20131755 (2019)","journal-title":"Int. J. Prod. Res."},{"key":"55_CR6","doi-asserted-by":"publisher","first-page":"3285","DOI":"10.1080\/00207543.2020.1859634","volume":"59","author":"M Schneckenreither","year":"2020","unstructured":"Schneckenreither, M., Haeussler, S., Gerhold, C.: Order release planning with predictive lead times: a machine learning approach. Int. J. Prod. Res. 59, 3285\u20133303 (2020)","journal-title":"Int. J. Prod. Res."},{"key":"55_CR7","doi-asserted-by":"crossref","unstructured":"Chen, C., Lee, L.: Stochastic Simulation Optimisation (An Optimal Computing Budget Allocation). Back Matter, pp. 175\u2013227 (2010)","DOI":"10.1142\/9789814282659_bmatter"},{"issue":"1","key":"55_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1145\/1667072.1667075","volume":"20","author":"J Xu","year":"2010","unstructured":"Xu, J., Nelson, B., Hong, L.: Industrial strength COMPASS: a comprehensive algorithm and software for optimisation via simulation. ACM Trans. Model. Comput. Simul. 20(1), 1\u201329 (2010)","journal-title":"ACM Trans. Model. Comput. Simul."},{"key":"55_CR9","doi-asserted-by":"crossref","unstructured":"Zhang, Z., Guan, Z., Gong, Y., Luo, D., Yue, L.: Improved multi-fidelity simulation-based optimisation: application in a digital twin shop floor. Int. J. Prod. Res. (2020)","DOI":"10.1080\/00207543.2020.1849846"},{"issue":"2","key":"55_CR10","doi-asserted-by":"publisher","first-page":"142","DOI":"10.1002\/nav.20335","volume":"56","author":"J Asmundsson","year":"2009","unstructured":"Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56(2), 142\u2013157 (2009)","journal-title":"Nav. Res. Logist."},{"key":"55_CR11","series-title":"Simulation Foundations, Methods and Applications","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1007\/978-3-319-64182-9_14","volume-title":"Advances in Modeling and Simulation","author":"J Fowler","year":"2017","unstructured":"Fowler, J., M\u00f6nch, L.: Modeling and analysis of semiconductor manufacturing. In: Tolk, A., Fowler, J., Shao, G., Y\u00fccesan, E. (eds.) Advances in Modeling and Simulation. SFMA, pp. 301\u2013313. Springer, Cham (2017). https:\/\/doi.org\/10.1007\/978-3-319-64182-9_14"},{"issue":"2","key":"55_CR12","doi-asserted-by":"publisher","first-page":"326","DOI":"10.1109\/TASE.2009.2021462","volume":"7","author":"J Bang","year":"2010","unstructured":"Bang, J., Kim, Y.: Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation. IEEE Trans. Autom. Sci. Eng. 7(2), 326\u2013336 (2010)","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"issue":"1","key":"55_CR13","doi-asserted-by":"publisher","first-page":"475","DOI":"10.1109\/TASE.2019.2935469","volume":"17","author":"D Kopp","year":"2019","unstructured":"Kopp, D., Monch, L., Pabst, D., Stehli, M.: Qualification management in wafer fabs: optimisation approach and simulation-based performance assessment. IEEE Trans. Autom. Sci. Eng. 17(1), 475\u2013489 (2019)","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"55_CR14","doi-asserted-by":"crossref","unstructured":"Ziarnetzky, T., Kacar, N., Monch, L., Uzsoy, R.: Simulation-based performance assessment of production planning formulations for semiconductor wafer fabrication. In: Winter Simulation Conference, Huntington Beach. IEEE (2015)","DOI":"10.1109\/WSC.2015.7408392"},{"issue":"2","key":"55_CR15","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1016\/j.ejor.2019.07.030","volume":"280","author":"H Missbauer","year":"2020","unstructured":"Missbauer, H.: Order release planning by iterative simulation and linear programming: theoretical foundation and analysis of its shortcomings. Eur. J. Oper. Res. 280(2), 495\u2013507 (2020)","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"55_CR16","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.cie.2016.03.019","volume":"96","author":"SH Kim","year":"2016","unstructured":"Kim, S.H., Lee, Y.H.: Synchronized production planning and scheduling in semiconductor fabrication. Comput. Ind. Eng. 96(6), 72\u201385 (2016)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"55_CR17","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/S0925-5273(00)00172-9","volume":"73","author":"B Kim","year":"2001","unstructured":"Kim, B., Kim, S.: Extended model for a hybrid production planning approach. Int. J. Prod. Econ. 73(1), 165\u2013173 (2001)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"55_CR18","doi-asserted-by":"publisher","first-page":"1650017","DOI":"10.1142\/S0217595916500172","volume":"33","author":"J Xu","year":"2016","unstructured":"Xu, J., Zhang, S., Huang, E., Chen, C., Lee, L., Celik, N.: MO2TOS: multi-fidelity optimisation with ordinal transformation and optimal sampling. Asia-Pac. J. Oper. Res. 33(3), 1650017 (2016)","journal-title":"Asia-Pac. J. Oper. Res."},{"issue":"9","key":"55_CR19","doi-asserted-by":"publisher","first-page":"2779","DOI":"10.1002\/j.1538-7305.1983.tb03204.x","volume":"62","author":"W Whitt","year":"1983","unstructured":"Whitt, W.: The queueing network analyser. Bell Labs Techn. J. 62(9), 2779\u20132815 (1983)","journal-title":"Bell Labs Techn. J."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-85914-5_55","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,31]],"date-time":"2025-08-31T22:05:20Z","timestamp":1756677920000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-85914-5_55"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030859138","9783030859145"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-85914-5_55","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"31 August 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Nantes","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"France","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 September 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 September 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Conftool","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"529","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"378","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"71% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.2","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.3","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"The conference was held virtually.","order":10,"name":"additional_info_on_review_process","label":"Additional Info on Review Process","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}