{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T14:16:25Z","timestamp":1742912185106,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030869595"},{"type":"electronic","value":"9783030869601"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-86960-1_54","type":"book-chapter","created":{"date-parts":[[2021,9,10]],"date-time":"2021-09-10T07:02:59Z","timestamp":1631257379000},"page":"702-711","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["BIM Interoperability and Data Exchange Support for As-Built Facility Management"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6875-2696","authenticated-orcid":false,"given":"Andrea","family":"di Filippo","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3160-7601","authenticated-orcid":false,"given":"Victoria Andrea","family":"Cotella","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9330-0680","authenticated-orcid":false,"given":"Caterina Gabriella","family":"Guida","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4382-3846","authenticated-orcid":false,"given":"Victoria","family":"Molina","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lorena","family":"Centarti","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,9,11]]},"reference":[{"issue":"1","key":"54_CR1","doi-asserted-by":"publisher","first-page":"16","DOI":"10.1016\/j.jcde.2014.11.002","volume":"2","author":"J Choi","year":"2015","unstructured":"Choi, J., Kim, H., Kim, I.: Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage. J. Comput. Des. Eng. 2(1), 16\u201325 (2015). https:\/\/doi.org\/10.1016\/j.jcde.2014.11.002","journal-title":"J. Comput. Des. Eng."},{"key":"54_CR2","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/j.autcon.2016.12.003","volume":"75","author":"EA P\u00e4rn","year":"2017","unstructured":"P\u00e4rn, E.A., Edwards, D.J., Sing, M.C.P.: The building information modelling trajectory in facilities management: a review. Autom. Constr. 75, 45\u201355 (2017)","journal-title":"Autom. Constr."},{"issue":"3","key":"54_CR3","first-page":"327","volume":"6","author":"I Caetano","year":"2019","unstructured":"Caetano, I., Leit\u00e3o, A.: Integration of an algorithmic BIM approach in a traditional architecture studio. J. Comput. Des. Eng. 6(3), 327\u2013336 (2019)","journal-title":"J. Comput. Des. Eng."},{"key":"54_CR4","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.autcon.2013.10.023","volume":"38","author":"R Volk","year":"2014","unstructured":"Volk, R., Stengel, J., Schultmann, F.: Building Information Modeling (BIM) for existing buildings - literature review and future needs. Autom. Constr. 38, 109\u2013127 (2014)","journal-title":"Autom. Constr."},{"key":"54_CR5","unstructured":"Kumar, V., Teo, E.A.L.: Conceptualizing \u201cCOBieEvaluator\u201d: an application for data mining COBie datasets to track asset changes throughout project lifecycle. In: Proceedings of the International Congress and Conferences on Computational Design and Engineering 2019 (2019)"},{"issue":"3","key":"54_CR6","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433","volume":"138","author":"B Becerik-Gerber","year":"2012","unstructured":"Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G.: Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manag. 138(3), 431\u2013442 (2012). https:\/\/doi.org\/10.1061\/(ASCE)CO.1943-7862.0000433","journal-title":"J. Constr. Eng. Manag."},{"issue":"4","key":"54_CR7","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1016\/j.jcde.2018.03.002","volume":"5","author":"B Koo","year":"2018","unstructured":"Koo, B., Shin, B.: Applying novelty detection to identify model element to IFC class misclassifications on architectural and infrastructure building information models. J. Comput. Des. Eng. 5(4), 391\u2013400 (2018). https:\/\/doi.org\/10.1016\/j.jcde.2018.03.002","journal-title":"J. Comput. Des. Eng."},{"issue":"1","key":"54_CR8","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1061\/(ASCE)CP.1943-5487.0000196","volume":"27","author":"E William East","year":"2013","unstructured":"William East, E., Nisbet, N., Liebich, T.: Facility management handover model view. J. Comput. Civ. Eng. 27(1), 61\u201367 (2013). https:\/\/doi.org\/10.1061\/(ASCE)CP.1943-5487.0000196","journal-title":"J. Comput. Civ. Eng."},{"issue":"3\/4","key":"54_CR9","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1108\/F-09-2011-0078","volume":"32","author":"S Lavy","year":"2014","unstructured":"Lavy, S., Liu, R., Issa, R.R.J.F.: Design for maintenance accessibility using BIM tools. Facil. 32(3\/4), 153\u2013159 (2014)","journal-title":"Facil."},{"key":"54_CR10","doi-asserted-by":"publisher","first-page":"40","DOI":"10.1016\/j.proeng.2015.11.007","volume":"125","author":"AAGA Yana","year":"2015","unstructured":"Yana, A.A.G.A., Rusdhi, H.A., Wibowo, M.A.: Analysis of factors affecting design changes in construction project with Partial Least Square (PLS). Procedia Eng. 125, 40\u201345 (2015)","journal-title":"Procedia Eng."},{"key":"54_CR11","doi-asserted-by":"publisher","unstructured":"Barba, S., Barbato, D., di Filippo, A., Napoletano, R., Ribera, F.: BIM-oriented modelling and management of structured information for cultural heritage. In: Agust\u00edn-Hern\u00e1ndez, L., Vallesp\u00edn Muniesa, A., Fern\u00e1ndez-Morales, A. (eds.) Graphical Heritage, EGA 2020. Springer Series in Design and Innovation, vol. 5. Springer, Cham (2020). https:\/\/doi.org\/10.1007\/978-3-030-47979-4_54","DOI":"10.1007\/978-3-030-47979-4_54"},{"key":"54_CR12","unstructured":"Hardin, B., McCool, D.: BIM and Construction Management: Proven Tools, Methods, and Workflows. Wiley, Hoboken (2015)"},{"key":"54_CR13","doi-asserted-by":"publisher","first-page":"809","DOI":"10.1016\/j.prostr.2019.08.230","volume":"18","author":"FM Ugliotti","year":"2019","unstructured":"Ugliotti, F.M., Osello, A., Rizzo, C., Muratore, L.: BIM-based structural survey design. Procedia Struct. Integrity 18, 809\u2013815 (2019)","journal-title":"Procedia Struct. Integrity"},{"key":"54_CR14","doi-asserted-by":"publisher","first-page":"197","DOI":"10.5194\/isprs-archives-XLII-2-W9-197-2019","volume":"XLII-2\/W9","author":"F Camagni","year":"2019","unstructured":"Camagni, F., Colaceci, S., Russo, M.: Reverse modeling of cultural heritage: pipeline and bottlenecks. Int. Arch. Photogram. Remote Sens. Spat. Inf. Sci. XLII-2\/W9, 197\u2013204 (2019). https:\/\/doi.org\/10.5194\/isprs-archives-XLII-2-W9-197-2019","journal-title":"Int. Arch. Photogram. Remote Sens. Spat. Inf. Sci."},{"key":"54_CR15","unstructured":"Alferieff, D., Bomba, M.J.B.: Level of Development (LOD) Specification Part I & Commentary for Building Information Models and Data, pp. 13\u201316 (2019)"},{"key":"54_CR16","doi-asserted-by":"crossref","unstructured":"Gouda Mohamed, A., Abdallah, M.R., Marzouk, M.: BIM and semantic web-based maintenance information for existing buildings. Autom. Constr. 116, 103209 (2020)","DOI":"10.1016\/j.autcon.2020.103209"},{"issue":"2","key":"54_CR17","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1108\/JFM-03-2018-0015","volume":"17","author":"A Alnaggar","year":"2019","unstructured":"Alnaggar, A., Pitt, M.: Towards a conceptual framework to manage BIM\/COBie asset data using a standard project management methodology. J. Facil. Manage. 17(2), 175\u2013187 (2019). https:\/\/doi.org\/10.1108\/JFM-03-2018-0015","journal-title":"J. Facil. Manage."},{"key":"54_CR18","unstructured":"Eastman, C.M., Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. Wiley, Hoboken (2011)"}],"container-title":["Lecture Notes in Computer Science","Computational Science and Its Applications \u2013 ICCSA 2021"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-86960-1_54","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,10]],"date-time":"2021-09-10T07:17:14Z","timestamp":1631258234000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-86960-1_54"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030869595","9783030869601"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-86960-1_54","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"11 September 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICCSA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Computational Science and Its Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Cagliari","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Italy","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"13 September 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"16 September 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"21","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"iccsa2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/iccsa.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Customed version of CyberChair 4","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"1588","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"466","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"18","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"29% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2,5","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"8","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}