{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,24]],"date-time":"2025-08-24T22:57:37Z","timestamp":1756076257809,"version":"3.40.3"},"publisher-location":"Cham","reference-count":32,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030882068"},{"type":"electronic","value":"9783030882075"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-88207-5_11","type":"book-chapter","created":{"date-parts":[[2021,9,30]],"date-time":"2021-09-30T12:20:08Z","timestamp":1633004408000},"page":"103-114","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Integrating 4D Simulations and Virtual Reality Environments: An Innovative Prototype"],"prefix":"10.1007","author":[{"given":"Yacine","family":"Mezrag","sequence":"first","affiliation":[]},{"given":"Conrad","family":"Boton","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,10,1]]},"reference":[{"key":"11_CR1","unstructured":"Coyne, K.: Leveraging the power of 4D models for analyzing and presenting CPM schedule delay analyses (2008)"},{"key":"11_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.autcon.2018.08.020","volume":"96","author":"C Boton","year":"2018","unstructured":"Boton, C.: Supporting constructability analysis meetings with Immersive virtual reality-based collaborative BIM 4D simulation. Autom. Constr. 96, 1\u201315 (2018)","journal-title":"Autom. Constr."},{"key":"11_CR3","doi-asserted-by":"crossref","unstructured":"Sampaio, A.Z.: Enhancing BIM methodology with VR technology. In: State of the Art Virtual Reality and Augmented Reality Knowhow, pp. 59\u201379 (2018)","DOI":"10.5772\/intechopen.74070"},{"key":"11_CR4","first-page":"305","volume":"22","author":"M Van Den Berg","year":"2017","unstructured":"Van Den Berg, M., Hartmann, T., De Graaf, R.: Supporting design reviews with pre-meeting virtual reality environments. J. Inf. Technol. Constr. 22, 305\u2013321 (2017)","journal-title":"J. Inf. Technol. Constr."},{"key":"11_CR5","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1007\/978-3-030-30949-7_14","volume-title":"Cooperative Design, Visualization, and Engineering","author":"S Bourlon","year":"2019","unstructured":"Bourlon, S., Boton, C.: Automating the integration of 4D models in game engines for a virtual reality-based construction simulation. In: Luo, Y. (ed.) CDVE 2019. LNCS, vol. 11792, pp. 123\u2013132. Springer, Cham (2019). https:\/\/doi.org\/10.1007\/978-3-030-30949-7_14"},{"key":"11_CR6","doi-asserted-by":"crossref","unstructured":"Nandavar, A., Petzold, F., Schubert, G., Youssef, E.: Opening BIM in a new dimension. A simple, OpenBIM standards based virtual reality collaboration technique for BIM. In: Intelligent & Informed, Proceedings of the 24th International Conference of the Association for Computer-Aided Architectural Design Research in Asia (CAADRIA), pp. 595\u2013604 (2019)","DOI":"10.52842\/conf.caadria.2019.1.595"},{"key":"11_CR7","unstructured":"Patrick, C.: Construction project planning and scheduling. Prentice Hall, Upper Saddle River (2003)"},{"key":"11_CR8","unstructured":"Boton, C.: Conception de vues m\u00e9tiers dans les collecticiels orient\u00e9s service: Vers des multi-vues adapt\u00e9es pour la simulation collaborative 4D\/nD de la construction (2013)"},{"key":"11_CR9","doi-asserted-by":"crossref","unstructured":"Norman, E.S., Brotherton, S.A., Fried, R.T.: Work Breakdown Structures: The Foundation for Project Management Excellence. Wiley, Hoboken (2008)","DOI":"10.1002\/9780470432723"},{"key":"11_CR10","unstructured":"Tulke, J., Hanff, J.: 4D construction sequence planning: new process and data model. In: Proceedings of 24th CIB-W78 Conference \u201cBringing ITC Knowledge to Work\u201d, pp. 79\u201384, Maribor, Slovenia (2007)"},{"key":"11_CR11","unstructured":"Boton, C., Kubicki, S., Halin, G.: 4D\/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study. In: Creative Construction Conference, pp. 500\u2013505 (2015)"},{"key":"11_CR12","unstructured":"Sulankivi, K., K\u00e4hk\u00f6nen, K., M\u00e4kel\u00e4, T., Kiviniemi, M.: 4D-BIM for construction safety planning. In: W099-Special Track 18th CIB World Building Congress, May 2010, Salford, United Kingdom, pp. 1\u201312 (2010)"},{"key":"11_CR13","doi-asserted-by":"publisher","unstructured":"Campagna-wilson, J., Boton, C.: Challenges related to 4D BIM simulation in the construction industry. In: Luo Y. (ed.) CDVE 2020. LNCS, vol. 12341, pp. 270\u2012278. Springer, Cham (2020). https:\/\/doi.org\/10.1007\/978-3-030-60816-3_30","DOI":"10.1007\/978-3-030-60816-3_30"},{"key":"11_CR14","doi-asserted-by":"crossref","unstructured":"Mazars, T., Francis, A.: Chronographical spatiotemporal dynamic 4D planning. Autom. Constr. 112 (2020)","DOI":"10.1016\/j.autcon.2020.103076"},{"key":"11_CR15","doi-asserted-by":"crossref","unstructured":"Pour Rahimian, F., Seyedzadeh, S., Oliver, S., Rodriguez, S., Dawood, N.: On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. Autom. Constr. 110, 103012 (2020)","DOI":"10.1016\/j.autcon.2019.103012"},{"key":"11_CR16","unstructured":"Forgues, D., Leonard, M.: Formalisation et analyse du processus de d\u00e9tection d\u201finterf\u00e9rences spatiotemporelles. In: 4th Construction Specialty Conference, pp. 1\u20139 (2013)"},{"key":"11_CR17","doi-asserted-by":"publisher","unstructured":"Preidel, C., Borrmann, A., Mattern, H., K\u00f6nig, M., Schapke, S.-E.: Common data environment. In: Borrmann, A., K\u00f6nig, M., Koch, C., Beetz, J. (eds.) Building Information Modeling, pp. 279\u2012291. Springer, Cham (2018). https:\/\/doi.org\/10.1007\/978-3-319-92862-3_15","DOI":"10.1007\/978-3-319-92862-3_15"},{"key":"11_CR18","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1108\/CI-11-2019-0127","volume":"20","author":"F Elghaish","year":"2020","unstructured":"Elghaish, F., Abrishami, S.: Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Constr. Innov. 20, 401\u2013420 (2020)","journal-title":"Constr. Innov."},{"key":"11_CR19","unstructured":"Hakkarainen, M., Woodward, C., Rainio, K.: Software Architecture for Mobile Mixed Reality and 4D BIM Interaction. In: Proceedings of the 25th CIB W78 Conference, pp. 1\u20138, Istanbul, Turkey(2009)"},{"key":"11_CR20","doi-asserted-by":"crossref","unstructured":"Ratajczak, J., Riedl, M., Matt, D.T.: BIM-based and AR application combined with location-based management system for the improvement of the construction performance. Buildings 9, 118 (2019)","DOI":"10.3390\/buildings9050118"},{"key":"11_CR21","unstructured":"Bouchlaghem, N.M., Liyanage, I.G.: Virtual reality applications in the UK\u201fs construction industry. http:\/\/itc.scix.net\/data\/works\/att\/w78-1996-89.content.pdf"},{"key":"11_CR22","first-page":"16","volume":"2","author":"RS Kamath","year":"2012","unstructured":"Kamath, R.S., Dongale, T.D., Kamat, R.K.: Development of virtual reality tool for creative learning in architectural education. Int. J. Qual. Assur. Eng. Technol. Educ. (IJQAETE) 2, 16\u201324 (2012)","journal-title":"Int. J. Qual. Assur. Eng. Technol. Educ. (IJQAETE)"},{"key":"11_CR23","doi-asserted-by":"publisher","first-page":"150","DOI":"10.1016\/j.autcon.2017.11.003","volume":"86","author":"X Li","year":"2018","unstructured":"Li, X., Yi, W., Chi, H.L., Wang, X., Chan, A.P.C.: A critical review of virtual and augmented reality (VR\/AR) applications in construction safety. Autom. Constr. 86, 150\u2013162 (2018)","journal-title":"Autom. Constr."},{"key":"11_CR24","first-page":"409","volume":"13","author":"Y Huang","year":"2019","unstructured":"Huang, Y., Shakya, S., Odeleye, T.: Comparing the functionality between virtual reality and mixed reality for architecture and construction uses. J. Civil Eng. Archit. 13, 409\u2013414 (2019)","journal-title":"J. Civil Eng. Archit."},{"key":"11_CR25","unstructured":"Messner, J.I., Yerrapathuruni, S.C.M., Baratta, A.J., Whisker, V.E.: Using virtual reality to improve construction engineering education. In: American Society for Engineering Education Annual Conference and Exposition, pp. 1\u20138 (2003)"},{"key":"11_CR26","unstructured":"Yerrapathruni, S.: Using 4 D CAD and Immersive Virtual Environments to Improve Construction Planning (2003)"},{"key":"11_CR27","unstructured":"Kuncham, K.: Timelining the construction in immersive virtual reality system using BIM application (2013). https:\/\/oaktrust.library.tamu.edu\/handle\/1969.1\/151003"},{"key":"11_CR28","doi-asserted-by":"crossref","unstructured":"Loup-Escande, \u00c9., Burkhardt, J.-M.: \u00c9valuer l\u201futilit\u00e9 dans le contexte des technologies \u00e9mergentes pour identifier des besoins latents: \u00e9l\u00e9ments issus d\u2019une analyse des interactions en situation d\u2019usage. Activit\u00e9s (2019)","DOI":"10.4000\/activites.4554"},{"key":"11_CR29","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1016\/0167-9236(94)00041-2","volume":"15","author":"ST March","year":"1995","unstructured":"March, S.T., Smith, G.F.: Design and natural science research on information technology. Decis. Support Syst. 15, 251\u2013266 (1995)","journal-title":"Decis. Support Syst."},{"key":"11_CR30","unstructured":"Hevner, A., Chatterjee, S.: Design science in information systems research. In: Integrated Series in Information Systems, pp. 75\u2013105. Springer (2004)"},{"key":"11_CR31","unstructured":"Prad\u00e8re, T., Gaillard, I., Pomian, J.-L.: Comprendre les pratiques de l\u2019ing\u00e9nierie: un imp\u00e9ratif pour mieux cibler le contenu de leur formation initiale en ergonomie. In: XXII\u00e8me congr\u00e8s de la Soci\u00e9t\u00e9 d\u201fErgonomie de Langue Fran\u00e7aise. Recherche, pratique, formation en ergonomie (1997)"},{"key":"11_CR32","first-page":"72","volume":"25","author":"J Lucas","year":"2020","unstructured":"Lucas, J.: Rapid development of virtual reality based construction sequence simulations: a case study. J. Inf. Technol. Constr. 25, 72\u201386 (2020)","journal-title":"J. Inf. Technol. Constr."}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-88207-5_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,10]],"date-time":"2023-01-10T20:43:24Z","timestamp":1673383404000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-88207-5_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030882068","9783030882075"],"references-count":32,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-88207-5_11","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"1 October 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"CDVE","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Cooperative Design, Visualization and Engineering","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"24 October 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"27 October 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"cdve2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.cdve.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Double-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Easychair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"69","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"25","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"9","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"36% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.5","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}