{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T03:00:52Z","timestamp":1743044452635,"version":"3.40.3"},"publisher-location":"Cham","reference-count":28,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030962982"},{"type":"electronic","value":"9783030962999"}],"license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022]]},"DOI":"10.1007\/978-3-030-96299-9_48","type":"book-chapter","created":{"date-parts":[[2022,2,21]],"date-time":"2022-02-21T17:09:04Z","timestamp":1645463344000},"page":"505-516","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["The Bi-level Assembly Flow-Shop Scheduling Problem with Batching and Delivery with Capacity Constraint"],"prefix":"10.1007","author":[{"given":"Hossein Shokri","family":"Garjan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alireza Abbaszadeh","family":"Molaei","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nazanin","family":"Fozooni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ajith","family":"Abraham","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2022,2,22]]},"reference":[{"issue":"5","key":"48_CR1","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1287\/mnsc.39.5.616","volume":"39","author":"C-Y Lee","year":"1993","unstructured":"Lee, C.-Y., Cheng, T., Lin, B.M.T.: Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Manage. Sci. 39(5), 616\u2013625 (1993)","journal-title":"Manage. Sci."},{"key":"48_CR2","doi-asserted-by":"publisher","first-page":"107535","DOI":"10.1016\/j.cie.2021.107535","volume":"160","author":"F Goodarzian","year":"2021","unstructured":"Goodarzian, F., Wamba, S.F., Mathiyazhagan, K., Taghipour, A.: A new bi-objective green medicine supply chain network design under fuzzy environment: hybrid metaheuristic algorithms. Comput. Indust. Eng. 160, 107535 (2021)","journal-title":"Comput. Indust. Eng."},{"key":"48_CR3","volume-title":"Introduction to Sequencing and Scheduling","author":"KR Baker","year":"1974","unstructured":"Baker, K.R.: Introduction to Sequencing and Scheduling. John Wiley & Sons, Hoboken (1974)"},{"key":"48_CR4","doi-asserted-by":"publisher","first-page":"107378","DOI":"10.1016\/j.cie.2021.107378","volume":"158","author":"HF Rahman","year":"2021","unstructured":"Rahman, H.F., Janardhanan, M.N., Chuen, L.P., Ponnambalam, S.G.: Flowshop scheduling with sequence dependent setup times and batch delivery in supply chain. Comput. Indust. Eng. 158, 107378 (2021)","journal-title":"Comput. Indust. Eng."},{"key":"48_CR5","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1016\/j.susoc.2021.09.002","volume":"3","author":"M Jabbari","year":"2021","unstructured":"Jabbari, M., Tavana, M., Fattahi, P., Daneshamooz, F.: A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages. Sustain. Oper. Comput. 3, 22\u201332 (2021)","journal-title":"Sustain. Oper. Comput."},{"key":"48_CR6","doi-asserted-by":"publisher","first-page":"107493","DOI":"10.1016\/j.cie.2021.107493","volume":"159","author":"Z Zhang","year":"2021","unstructured":"Zhang, Z., Tang, Q.: Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines. Comput. Indust. Eng. 159, 107493 (2021)","journal-title":"Comput. Indust. Eng."},{"issue":"11","key":"48_CR7","doi-asserted-by":"publisher","first-page":"7527","DOI":"10.1007\/s00500-021-05711-7","volume":"25","author":"F Goodarzian","year":"2021","unstructured":"Goodarzian, F., Kumar, V., Abraham, A.: Hybrid meta-heuristic algorithms for a supply chain network considering different carbon emission regulations using big data characteristics. Soft. Comput. 25(11), 7527\u20137557 (2021). https:\/\/doi.org\/10.1007\/s00500-021-05711-7","journal-title":"Soft. Comput."},{"key":"48_CR8","doi-asserted-by":"publisher","first-page":"107389","DOI":"10.1016\/j.cie.2021.107389","volume":"158","author":"F Goodarzian","year":"2021","unstructured":"Goodarzian, F., Kumar, V., Ghasemi, P.: A set of efficient heuristics and meta-heuristics to solve a multi-objective pharmaceutical supply chain network. Comput. Indust. Eng. 158, 107389 (2021)","journal-title":"Comput. Indust. Eng."},{"key":"48_CR9","doi-asserted-by":"publisher","first-page":"104188","DOI":"10.1016\/j.engappai.2021.104188","volume":"100","author":"F Goodarzian","year":"2021","unstructured":"Goodarzian, F., Taleizadeh, A.A., Ghasemi, P., Abraham, A.: An integrated sustainable medical supply chain network during COVID-19. Eng. Appl. Artif. Intell. 100, 104188 (2021)","journal-title":"Eng. Appl. Artif. Intell."},{"key":"48_CR10","doi-asserted-by":"publisher","unstructured":"Ghasemi, P., Goodarzian, F., Gunasekaran, A., Abraham, A.: A bi-level mathematical model for logistic management considering the evolutionary game with environmental feedbacks. Int. J. Logist. Manage. (2021). (ahead-of-print). https:\/\/doi.org\/10.1108\/IJLM-04-2021-0199","DOI":"10.1108\/IJLM-04-2021-0199"},{"key":"48_CR11","doi-asserted-by":"publisher","unstructured":"Goodarzian, F., Bahrami, F., Shishebori, D.: A new location-allocation-problem for mobile telecommunication rigs model under crises and natural disasters: a real case study. J. Ambient. Intell. Humaniz. Comput. 1\u221219 (2021). https:\/\/doi.org\/10.1007\/s12652-021-03461-w","DOI":"10.1007\/s12652-021-03461-w"},{"issue":"13","key":"48_CR12","doi-asserted-by":"publisher","first-page":"4053","DOI":"10.1080\/00207543.2020.1757174","volume":"59","author":"S Yang","year":"2021","unstructured":"Yang, S., Xu, Z.: The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery. Int. J. Prod. Res. 59(13), 4053\u20134071 (2021)","journal-title":"Int. J. Prod. Res."},{"key":"48_CR13","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.cie.2018.09.035","volume":"126","author":"SA Basir","year":"2018","unstructured":"Basir, S.A., Mazdeh, M.M., Namakshenas, M.: Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system. Comput. Ind. Eng. 126, 217\u2013231 (2018)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"48_CR14","doi-asserted-by":"publisher","first-page":"875","DOI":"10.1007\/s12351-020-00615-0","volume":"21","author":"Z Ceylan","year":"2021","unstructured":"Ceylan, Z., Tozan, H., Bulkan, S.: A coordinated scheduling problem for the supply chain in a flexible job shop machine environment. Oper. Res. Int. Journal 21(2), 875\u2013900 (2021). https:\/\/doi.org\/10.1007\/s12351-020-00615-0","journal-title":"Oper. Res. Int. Journal"},{"issue":"2","key":"48_CR15","first-page":"145","volume":"10","author":"T Cheng","year":"1993","unstructured":"Cheng, T., Kahlbacher, H.: Scheduling with delivery and earliness penalties. Asia-Pacific J. Oper. Res. 10(2), 145\u2013152 (1993)","journal-title":"Asia-Pacific J. Oper. Res."},{"issue":"1","key":"48_CR16","first-page":"452","volume":"8","author":"F Goodarzian","year":"2021","unstructured":"Goodarzian, F., Abraham, A., Fathollahi-Fard, A.M.: A biobjective home health care logistics considering the working time and route balancing: a self-adaptive social engineering optimizer. J. Comput. Des. Eng. 8(1), 452\u2013474 (2021)","journal-title":"J. Comput. Des. Eng."},{"key":"48_CR17","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.engappai.2017.05.004","volume":"63","author":"H Kazemi","year":"2017","unstructured":"Kazemi, H., Mazdeh, M.M., Rostami, M.: The two stage assembly flow-shop scheduling problem with batching and delivery. Eng. Appl. Artif. Intell. 63, 98\u2013107 (2017)","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"2","key":"48_CR18","doi-asserted-by":"publisher","first-page":"346","DOI":"10.1287\/opre.43.2.346","volume":"43","author":"CN Potts","year":"1995","unstructured":"Potts, C.N., Sevast\u2019Janov, S.V., Strusevich, V.A., Van Wassenhove, L.N., Zwaneveld, C.M.: The two-stage assembly scheduling problem: complexity and approximation. Oper. Res. 43(2), 346\u2013355 (1995)","journal-title":"Oper. Res."},{"issue":"2","key":"48_CR19","first-page":"94","volume":"1","author":"MM Mazdeh","year":"2014","unstructured":"Mazdeh, M.M., Rostami, M.: A branch-and-bound algorithm for two-machine flow-shop scheduling problems with batch delivery costs. Int. J. Syst. Sci. Oper. Logist. 1(2), 94\u2013104 (2014)","journal-title":"Int. J. Syst. Sci. Oper. Logist."},{"issue":"2","key":"48_CR20","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey, M.R., Johnson, D.S., Sethi, R.: The complexity of flowshop and jobshop scheduling. Math. Oper. Res. 1(2), 117\u2013129 (1976)","journal-title":"Math. Oper. Res."},{"key":"48_CR21","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2020\/7132469","volume":"2020","author":"J Belabid","year":"2020","unstructured":"Belabid, J., Aqil, S., Allali, K.: Solving permutation flow shop scheduling problem with sequence-independent setup time. J. Appl. Math. 2020, 1\u201311 (2020). https:\/\/doi.org\/10.1155\/2020\/7132469","journal-title":"J. Appl. Math."},{"key":"48_CR22","doi-asserted-by":"publisher","first-page":"274","DOI":"10.1007\/978-3-030-15843-9_21","volume-title":"Variable Neighborhood Search: 6th International Conference, ICVNS 2018, Sithonia, Greece, October 4\u20137, 2018, Revised Selected Papers","author":"A Taxidou","year":"2019","unstructured":"Taxidou, A., Karafyllidis, I., Marinaki, M., Marinakis, Y., Migdalas, A.: A hybrid firefly - VNS algorithm for the permutation flowshop scheduling problem. In: Sifaleras, A., Salhi, S., Brimberg, J. (eds.) Variable Neighborhood Search: 6th International Conference, ICVNS 2018, Sithonia, Greece, October 4\u20137, 2018, Revised Selected Papers, pp. 274\u2013286. Springer International Publishing, Cham (2019). https:\/\/doi.org\/10.1007\/978-3-030-15843-9_21"},{"issue":"10","key":"48_CR23","doi-asserted-by":"publisher","first-page":"1826","DOI":"10.1109\/TSMC.2017.2720178","volume":"48","author":"K Wang","year":"2017","unstructured":"Wang, K., Luo, H., Liu, F., Yue, X.: Permutation flow shop scheduling with batch delivery to multiple customers in supply chains. IEEE Trans. Syst. Man Cybern. Syst. 48(10), 1826\u20131837 (2017)","journal-title":"IEEE Trans. Syst. Man Cybern. Syst."},{"issue":"11","key":"48_CR24","doi-asserted-by":"publisher","first-page":"1847","DOI":"10.1080\/01605682.2019.1630330","volume":"71","author":"M Al-Behadili","year":"2020","unstructured":"Al-Behadili, M., Ouelhadj, D., Jones, D.: Multi-objective biased randomised iterated greedy for robust permutation flow shop scheduling problem under disturbances. J. Oper. Res. Soc. 71(11), 1847\u20131859 (2020)","journal-title":"J. Oper. Res. Soc."},{"key":"48_CR25","doi-asserted-by":"publisher","first-page":"106331","DOI":"10.1016\/j.asoc.2020.106331","volume":"92","author":"F Goodarzian","year":"2020","unstructured":"Goodarzian, F., Hosseini-Nasab, H., Mu\u00f1uzuri, J., Fakhrzad, M.B.: A multi-objective pharmaceutical supply chain network based on a robust fuzzy model: a comparison of meta-heuristics. Appl. Soft Comput. 92, 106331 (2020)","journal-title":"Appl. Soft Comput."},{"key":"48_CR26","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1016\/j.procs.2019.12.208","volume":"164","author":"H Ochi","year":"2019","unstructured":"Ochi, H., Driss, O.B.: Scheduling the distributed assembly flowshop problem to minimize the makespan. Procedia Comput. Sci. 164, 471\u2013477 (2019)","journal-title":"Procedia Comput. Sci."},{"issue":"3","key":"48_CR27","doi-asserted-by":"publisher","first-page":"950","DOI":"10.1016\/j.ejor.2017.10.045","volume":"266","author":"LS Pessoa","year":"2018","unstructured":"Pessoa, L.S., Andrade, C.E.: Heuristics for a flowshop scheduling problem with stepwise job objective function. Eur. J. Oper. Res. 266(3), 950\u2013962 (2018)","journal-title":"Eur. J. Oper. Res."},{"key":"48_CR28","doi-asserted-by":"publisher","unstructured":"Goodarzian, F., Ghasemi, P., Gunasekaren, A., Taleizadeh, A.A., Abraham, A.: A sustainable-resilience healthcare network for handling COVID-19 pandemic Ann. Oper. Res. 1\u221265 (2021). https:\/\/doi.org\/10.1007\/s10479-021-04238-2","DOI":"10.1007\/s10479-021-04238-2"}],"container-title":["Lecture Notes in Networks and Systems","Innovations in Bio-Inspired Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-96299-9_48","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,2,21]],"date-time":"2022-02-21T17:15:34Z","timestamp":1645463734000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-96299-9_48"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"ISBN":["9783030962982","9783030962999"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-96299-9_48","relation":{},"ISSN":["2367-3370","2367-3389"],"issn-type":[{"type":"print","value":"2367-3370"},{"type":"electronic","value":"2367-3389"}],"subject":[],"published":{"date-parts":[[2022]]},"assertion":[{"value":"22 February 2022","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"IBICA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Innovations in Bio-Inspired Computing and Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2021","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"16 December 2021","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18 December 2021","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"12","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"ibica2021","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.mirlabs.net\/ibica21\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}