{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,6]],"date-time":"2026-05-06T15:49:57Z","timestamp":1778082597876,"version":"3.51.4"},"publisher-location":"Cham","reference-count":49,"publisher":"Springer Nature Switzerland","isbn-type":[{"value":"9783031229893","type":"print"},{"value":"9783031229909","type":"electronic"}],"license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022]]},"DOI":"10.1007\/978-3-031-22990-9_3","type":"book-chapter","created":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T01:22:43Z","timestamp":1672536163000},"page":"35-47","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["An Improved Genetic Algorithm for\u00a0the\u00a0Resource-Constrained Project Scheduling Problem"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6843-8971","authenticated-orcid":false,"given":"Evgenii N.","family":"Goncharov","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,1,1]]},"reference":[{"issue":"4","key":"3_CR1","first-page":"253","volume":"5","author":"M Abdolshah","year":"2014","unstructured":"Abdolshah, M.: A review of resource-constrained project scheduling problems (RCPSP) approaches and solutions. Int. Trans. J. Eng. Manag. Appl. Sci. Technol. 5(4), 253\u2013286 (2014)","journal-title":"Int. Trans. J. Eng. Manag. Appl. Sci. Technol."},{"key":"3_CR2","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1007\/978-0-387-33768-5_10","volume-title":"Perspectives in Modern Project Scheduling","author":"J Alcaraz","year":"2006","unstructured":"Alcaraz, J., Maroto, C.: A hybrid genetic algorithm based on intelligent encoding for project scheduling. In: J\u00f3zefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 249\u2013274. Springer, Boston (2006). https:\/\/doi.org\/10.1007\/978-0-387-33768-5_10"},{"issue":"1","key":"3_CR3","first-page":"1","volume":"10","author":"F Berthaut","year":"2018","unstructured":"Berthaut, F., Pellerin, R., Hajji, A., Perrier, N.: A path relinking-based scatter search for the resource-constrained project scheduling problem. Int. J. Project Organ. Manag. 10(1), 1\u201336 (2018)","journal-title":"Int. J. Project Organ. Manag."},{"issue":"1","key":"3_CR4","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J.K., Kan, A.R.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11\u201324 (1983)","journal-title":"Discrete Appl. Math."},{"issue":"1","key":"3_CR5","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., et al.: Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. Oper. Res. 112(1), 3\u201341 (1999)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR6","unstructured":"Carlier, J., Moukrim, A., Xu, H.: A memetic algorithm for the resource constrained project scheduling problem. In: Proceedings of the International Conference on Industrial Engineering and Systems Management, IESM (2009)"},{"key":"3_CR7","doi-asserted-by":"crossref","unstructured":"Chen, D., Liu, S., Qin, S.: Memetic algorithm for the resource-constrained project scheduling problem. In: Proceeding of the 11th World Congress on Intelligent Control and Automation, WCICA, pp. 4991\u20134996. IEEE (2014)","DOI":"10.1109\/WCICA.2014.7053561"},{"key":"3_CR8","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1007\/978-3-642-03211-0_6","volume-title":"Nature Inspired Cooperative Strategies for Optimization","author":"J Czogalla","year":"2009","unstructured":"Czogalla, J., Fink, A.: Particle swarm topologies for resource constrained project scheduling. In: Krasnogor, N., et al. (eds.) NICSO 2008, pp. 61\u201373. Springer-Verlag, Berlin Heidelberg (2009). https:\/\/doi.org\/10.1007\/978-3-642-03211-0_6"},{"key":"3_CR9","doi-asserted-by":"publisher","first-page":"638","DOI":"10.1016\/j.ejor.2004.08.020","volume":"169","author":"D Debels","year":"2006","unstructured":"Debels, D., De Reyck Leus, B.R., Vanhoucke, M.: A hybrid scatter search electromagnetism meta-heuristic for project scheduling. Eur. J. Oper. Res. 169, 638\u2013653 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR10","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1287\/opre.1060.0358","volume":"55","author":"D Debels","year":"2007","unstructured":"Debels, D., Vanhoucke, M.: Decomposition-based genetic algorithm for the resource-consrtained project scheduling problem. Oper. Res. 55, 457\u2013469 (2007)","journal-title":"Oper. Res."},{"key":"3_CR11","doi-asserted-by":"publisher","first-page":"346","DOI":"10.1016\/j.ins.2017.08.023","volume":"418\u2013419","author":"S Elsayed","year":"2017","unstructured":"Elsayed, S., Sarker, R., Ray, T., Coello, C.C.: Consolidated optimization algorithm for resource-constrained project scheduling problems. Inf. Sci. 418\u2013419, 346\u2013362 (2017)","journal-title":"Inf. Sci."},{"issue":"5","key":"3_CR12","doi-asserted-by":"publisher","first-page":"890","DOI":"10.1016\/j.cor.2011.07.010","volume":"39","author":"C Fang","year":"2012","unstructured":"Fang, C., Wang, L.: An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem. Comput. Oper. Res. 39(5), 890\u2013901 (2012)","journal-title":"Comput. Oper. Res."},{"key":"3_CR13","unstructured":"Gagnon, M., Boctor, F.F., d\u2019Avignon, G.: A tabu search algorithm for the resource-constrained project scheduling problem. In: ASAC (2004)"},{"key":"3_CR14","unstructured":"Gimadi, E.K.: On some mathematical models and methods for planning large-scale projects. Models and Optimization Methods. In: Proceedings an USSR Sib. Branch, Math. Inst., Novosibirsk. Nauka, vol. 10, pp. 89\u2013115 (1988)"},{"issue":"1","key":"3_CR15","doi-asserted-by":"publisher","first-page":"31","DOI":"10.2298\/YJOR171115025G","volume":"29","author":"EK Gimadi","year":"2019","unstructured":"Gimadi, E.K., Goncharov, E.N., Mishin, D.V.: On some implementations of solving the resource-constrained project scheduling problem. Yugoslav J. Oper. Res. 29(1), 31\u201342 (2019)","journal-title":"Yugoslav J. Oper. Res."},{"issue":"1","key":"3_CR16","first-page":"9","volume":"7","author":"EK Gimadi","year":"2000","unstructured":"Gimadi, E.K., Zalyubovskii, V.V., Sevast\u2019yanov, S.V.: Polynomial solvability of scheduling problems with storable resources and deadlines. Diskretnyi Analiz i Issledovanie Operazii 7(1), 9\u201334 (2000)","journal-title":"Diskretnyi Analiz i Issledovanie Operazii"},{"key":"3_CR17","doi-asserted-by":"publisher","first-page":"467","DOI":"10.1007\/s10732-010-9142-2","volume":"17","author":"J Goncalves","year":"2011","unstructured":"Goncalves, J., Resende, M.G.C., Mendes, J.: A biased random key genetic algorithm with forward-backward improvement for resource-constrained project scheduling problem. J. Heuristics. 17, 467\u2013486 (2011). https:\/\/doi.org\/10.1007\/s10732-010-9142-2","journal-title":"J. Heuristics."},{"issue":"6","key":"3_CR18","doi-asserted-by":"publisher","first-page":"1101","DOI":"10.1134\/S0005117917060108","volume":"78","author":"EN Goncharov","year":"2017","unstructured":"Goncharov, E.N., Leonov, V.V.: Genetic algorithm for the resource-constrained project scheduling problem. Autom Remote Control 78(6), 1101\u20131114 (2017). https:\/\/doi.org\/10.1134\/S0005117917060108","journal-title":"Autom Remote Control"},{"key":"3_CR19","series-title":"Communications in Computer and Information Science","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1007\/978-3-030-33394-2_4","volume-title":"Mathematical Optimization Theory and Operations Research","author":"EN Goncharov","year":"2019","unstructured":"Goncharov, E.N.: Variable neighborhood search for the resource constrained project scheduling problem. In: Bykadorov, I., Strusevich, V., Tchemisova, T. (eds.) MOTOR 2019. CCIS, vol. 1090, pp. 39\u201350. Springer, Cham (2019). https:\/\/doi.org\/10.1007\/978-3-030-33394-2_4"},{"issue":"4","key":"3_CR20","first-page":"15","volume":"29","author":"EN Goncharov","year":"2022","unstructured":"Goncharov, E.N.: Local search algorithm for the resource-constrained project scheduling problem. Diskret. Anal. Issled. Oper. 29(4), 15\u201337 (2022)","journal-title":"Diskret. Anal. Issled. Oper."},{"key":"3_CR21","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extentions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1\u201314 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR22","doi-asserted-by":"crossref","unstructured":"Herroelen, W., Demeulemeester, E., De Reyck, B.: A Classification Scheme for Project Scheduling. In: Weglarz J. (Ed.). Project Scheduling-Recent Models, Algorithms and Applications, International Series in Operations Research and Management Science. Kluwer Academic Publishers, Dordrecht, vol. 14, no. 1, pp. 77\u2013106 (1998)","DOI":"10.1007\/978-1-4615-5533-9_1"},{"issue":"3","key":"3_CR23","first-page":"147","volume":"1","author":"IY Ismail","year":"2012","unstructured":"Ismail, I.Y., Barghash, M.A.: Diversity guided genetic algorithm to solve the resource constrained project scheduling problem. Int. J. Plan. Sched. 1(3), 147\u2013170 (2012)","journal-title":"Int. J. Plan. Sched."},{"key":"3_CR24","doi-asserted-by":"publisher","first-page":"275","DOI":"10.1007\/978-0-387-33768-5_11","volume-title":"Perspectives in Modern Project Scheduling","author":"P Jedrzejowicz","year":"2006","unstructured":"Jedrzejowicz, P., Ratajczak, E.: Population learning algorithm for the resource-constrained project scheduling. In: J\u00f3zefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 275\u2013296. Springer, Boston (2006). https:\/\/doi.org\/10.1007\/978-0-387-33768-5_11"},{"key":"3_CR25","unstructured":"Kochetov, Y., Stolyar, A.: Evolutionary local search with variable neighborhood for the resource-constrained project scheduling problem. In: Proceedings of the 3th International Workshop of Computer Science and Information Technologies, vol. 96\u201399 (2003)"},{"key":"3_CR26","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., Hartmann, S.: Experimental investigation of heuristics for resource-constrained project scheduling: an update. Eur. J. Oper. Res. 174, 23\u201337 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR27","doi-asserted-by":"crossref","unstructured":"Kolisch, R., Hartmann, S.: Heuristic Algorithms for Solving the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis. In: Weglarz J., (ed). Project scheduling: Recent models, Algorithms and Applications. Kluwer Academic Publishers, pp. 147\u2013178 (1999)","DOI":"10.1007\/978-1-4615-5533-9_7"},{"key":"3_CR28","doi-asserted-by":"publisher","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: Characterization and generation of a general class of resource-constrained project scheduling problems. Manag. Sci. 41, 1693\u20131703 (1995)","journal-title":"Manag. Sci."},{"key":"3_CR29","doi-asserted-by":"crossref","unstructured":"Kolisch, R., Sprecher, A.: PSPLIB \u2013 a project scheduling problem library. Eur. J. Oper. Res. 96, 205\u2013216 (1996). http:\/\/www.om-db.wi.tum.de\/psplib\/","DOI":"10.1016\/S0377-2217(96)00170-1"},{"key":"3_CR30","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1016\/j.ins.2014.02.155","volume":"277","author":"G Koulinas","year":"2014","unstructured":"Koulinas, G., Kotsikas, L., Anagnostopoulos, K.: A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem. Inf. Sci. 277, 680\u2013693 (2014)","journal-title":"Inf. Sci."},{"issue":"1\u20132","key":"3_CR31","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1007\/s10696-011-9133-0","volume":"25","author":"A Lim","year":"2013","unstructured":"Lim, A., Ma, H., Rodrigues, B., Tan, S.T., Xiao, F.: New meta-heuristics for the resource-constrained project scheduling problem. Flex. Serv. Manuf. J. 25(1\u20132), 48\u201373 (2013). https:\/\/doi.org\/10.1007\/s10696-011-9133-0","journal-title":"Flex. Serv. Manuf. J."},{"key":"3_CR32","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1016\/j.cor.2007.07.001","volume":"36","author":"JJM Mendes","year":"2009","unstructured":"Mendes, J.J.M., Goncalves, J.F., Resende, M.G.C.: A random key based genetic algorithm for the resource constrained project scheduling problem. Comput. Oper. Res. 36, 92\u2013109 (2009)","journal-title":"Comput. Oper. Res."},{"key":"3_CR33","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1007\/s00500-008-0337-5","volume":"13","author":"MDM Mobini","year":"2009","unstructured":"Mobini, M.D.M., Rabbani, M., Amalnik, M.S., et al.: Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem. Soft Comput. 13, 597\u2013610 (2009). https:\/\/doi.org\/10.1007\/s00500-008-0337-5","journal-title":"Soft Comput."},{"issue":"2","key":"3_CR34","doi-asserted-by":"publisher","first-page":"1975","DOI":"10.1016\/j.asoc.2010.06.013","volume":"11","author":"M Mobini","year":"2011","unstructured":"Mobini, M., Mobini, Z., Rabbani, M.: An artificial immune algorithm for the project scheduling problem under resource constraints. Appl. Soft Comput. 11(2), 1975\u20131982 (2011)","journal-title":"Appl. Soft Comput."},{"key":"3_CR35","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1023\/B:ANOR.0000039521.26237.62","volume":"131","author":"M Palpant","year":"2004","unstructured":"Palpant, M., Artigues, C., Michelon, P.: Solving the resource-constrained project scheduling problem with large neighborhood search. Ann. Oper. Res. 131, 237\u2013257 (2004)","journal-title":"Ann. Oper. Res."},{"issue":"2","key":"3_CR36","doi-asserted-by":"publisher","first-page":"395","DOI":"10.1016\/j.ejor.2019.01.063","volume":"280","author":"R Pellerin","year":"2020","unstructured":"Pellerin, R., Perrier, N., Berthaut, F.: LSSPER: A survey of hybrid metaheuristics for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 280(2), 395\u2013416 (2020)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR37","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1002\/nav.20439","volume":"58","author":"S Proon","year":"2011","unstructured":"Proon, S., Jin, M.: A genetic algorithm with neighborhood search for the resource-consrtained project scheduling problem. Naval Res. Logist. 58, 73\u201382 (2011)","journal-title":"Naval Res. Logist."},{"issue":"1","key":"3_CR38","first-page":"11","volume":"16","author":"M Ranjbar","year":"2009","unstructured":"Ranjbar, M., Kianfar, F.: A hybrid scatter search for the RCPSP. Sci. Iranica 16(1), 11\u201318 (2009)","journal-title":"Sci. Iranica"},{"issue":"4","key":"3_CR39","doi-asserted-by":"publisher","first-page":"3983","DOI":"10.1016\/j.eswa.2011.09.062","volume":"39","author":"DC Paraskevopoulos","year":"2012","unstructured":"Paraskevopoulos, D.C., Tarantilis, C.D., Ioannou, G.: Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm. Expert Syst. Appl. 39(4), 3983\u20133994 (2012)","journal-title":"Expert Syst. Appl."},{"key":"3_CR40","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1016\/j.ejor.2004.04.008","volume":"165","author":"V Valls","year":"2005","unstructured":"Valls, V., Ballestin, F., Quintanilla, M.S.: Justification and RCPSP: a technique that Pays. Eur. J. Oper. Res. 165, 375\u2013386 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"3_CR41","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1016\/j.ejor.2006.12.033","volume":"185","author":"V Valls","year":"2008","unstructured":"Valls, V., Ballestin, F., Quintanilla, S.: A hybrid genetic algorithm for the resource-consrtained project scheduling problem. Eur. J. Oper. Res. 185(2), 495\u2013508 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR42","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1023\/B:ANOR.0000039524.09792.c9","volume":"131","author":"V Valls","year":"2004","unstructured":"Valls, V., Ballestin, F., Quintanilla, S.: A population-based approach to the resource-constrained project scheduling problem. Ann. Oper. Res. 131, 305\u2013324 (2004). https:\/\/doi.org\/10.1023\/B:ANOR.0000039524.09792.c9","journal-title":"Ann. Oper. Res."},{"key":"3_CR43","doi-asserted-by":"publisher","unstructured":"Vanhoucke, M.: Resource-constrained project scheduling. In: Project Management with Dynamic Scheduling. Springer-Verlag, Heidelberg, pp. 107\u2013137 (2012). https:\/\/doi.org\/10.1007\/978-3-642-25175-7_7","DOI":"10.1007\/978-3-642-25175-7_7"},{"issue":"6","key":"3_CR44","doi-asserted-by":"publisher","first-page":"1031","DOI":"10.1016\/j.ins.2009.11.044","volume":"180","author":"W Chen","year":"2010","unstructured":"Chen, W., Shi, Y.J., Teng, H.F., et al.: An efficient hybrid algorithm for resource-constrained project scheduling. Inf. Sci. 180(6), 1031\u20131039 (2010)","journal-title":"Inf. Sci."},{"issue":"5","key":"3_CR45","doi-asserted-by":"publisher","first-page":"376","DOI":"10.1007\/s12209-010-1495-y","volume":"16","author":"H Wang","year":"2010","unstructured":"Wang, H., Li, T., Lin, T.: Efficient genetic algorithm for resource-constrained project scheduling problem. Trans. Tianjin Univ. 16(5), 376\u2013382 (2010). https:\/\/doi.org\/10.1007\/s12209-010-1495-y","journal-title":"Trans. Tianjin Univ."},{"key":"3_CR46","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-5533-9","volume-title":"Project Scheduling: Recent Models, Algorithms and Applications","author":"J Weglarz","year":"1999","unstructured":"Weglarz, J.: Project Scheduling: Recent Models, Algorithms and Applications. Kluwer Academic Publishers, Boston (1999)"},{"issue":"3\u20134","key":"3_CR47","doi-asserted-by":"publisher","first-page":"358","DOI":"10.1007\/s00170-008-1486-5","volume":"41","author":"KC Ying","year":"2009","unstructured":"Ying, K.C., Lin, S.W., Lee, Z.J.: Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects. Int. J. Adv. Manuf. Technol. 41(3\u20134), 358\u2013366 (2009). https:\/\/doi.org\/10.1007\/s00170-008-1486-5","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"3_CR48","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.ejor.2013.03.005","volume":"229","author":"R Zamani","year":"2013","unstructured":"Zamani, R.: A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. Eur. J. Oper. Res. 229(2), 552\u2013559 (2013)","journal-title":"Eur. J. Oper. Res."},{"issue":"15\u201316","key":"3_CR49","doi-asserted-by":"publisher","first-page":"6039","DOI":"10.1016\/j.eswa.2015.04.009","volume":"42","author":"X Zheng","year":"2015","unstructured":"Zheng, X., Wang, L.: A multi-agent optimization algorithm for resource constrained project scheduling problem. Expert Syst. Appl. 42(15\u201316), 6039\u20136049 (2015)","journal-title":"Expert Syst. Appl."}],"container-title":["Communications in Computer and Information Science","Advances in Optimization and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-22990-9_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T02:20:57Z","timestamp":1672539657000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-22990-9_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"ISBN":["9783031229893","9783031229909"],"references-count":49,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-22990-9_3","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022]]},"assertion":[{"value":"1 January 2023","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"OPTIMA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Optimization and Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Petrovac","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Montenegro","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2022","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"26 September 2022","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 September 2022","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"13","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"optima2022","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/agora.guru.ru\/display.php?conf=OPTIMA-2022","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"43","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"17","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"40% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3.1","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"2.2","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}