{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,8]],"date-time":"2025-09-08T06:38:57Z","timestamp":1757313537051,"version":"3.40.3"},"publisher-location":"Cham","reference-count":31,"publisher":"Springer Nature Switzerland","isbn-type":[{"type":"print","value":"9783031436697"},{"type":"electronic","value":"9783031436703"}],"license":[{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023]]},"DOI":"10.1007\/978-3-031-43670-3_33","type":"book-chapter","created":{"date-parts":[[2023,9,13]],"date-time":"2023-09-13T08:02:35Z","timestamp":1694592155000},"page":"477-490","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A Constraint Programming Model for a Reconfigurable Job Shop Scheduling Problem with Machine Availability"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3950-149X","authenticated-orcid":false,"given":"Zahra","family":"Mehdizadeh-Somarin","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6757-926X","authenticated-orcid":false,"given":"Reza","family":"Tavakkoli-Moghaddam","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0623-4890","authenticated-orcid":false,"given":"Mohammad","family":"Rohaninejad","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8135-1296","authenticated-orcid":false,"given":"Zdenek","family":"Hanzalek","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6568-6782","authenticated-orcid":false,"given":"Behdin","family":"Vahedi-Nouri","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,9,14]]},"reference":[{"key":"33_CR1","doi-asserted-by":"publisher","unstructured":"Pinedo, M.L.: Scheduling, 5 edn, p. 670. Springer, Cham (2016). https:\/\/doi.org\/10.1007\/978-3-319-26580-3","DOI":"10.1007\/978-3-319-26580-3"},{"issue":"2","key":"33_CR2","doi-asserted-by":"publisher","first-page":"527","DOI":"10.1016\/S0007-8506(07)63232-6","volume":"48","author":"Y Koren","year":"1999","unstructured":"Koren, Y., et al.: Reconfigurable manufacturing systems. CIRP Ann. 48(2), 527\u2013540 (1999)","journal-title":"CIRP Ann."},{"issue":"7","key":"33_CR3","doi-asserted-by":"publisher","first-page":"2067","DOI":"10.1080\/00207543.2021.1883762","volume":"60","author":"A Kazemisaboor","year":"2022","unstructured":"Kazemisaboor, A., Aghaie, A., Salmanzadeh, H.: A simulation-based optimisation framework for process plan generation in reconfigurable manufacturing systems (RMSs) in an uncertain environment. Int. J. Prod. Res. 60(7), 2067\u20132085 (2022)","journal-title":"Int. J. Prod. Res."},{"key":"33_CR4","doi-asserted-by":"publisher","first-page":"403","DOI":"10.1007\/978-3-030-99108-1_29","volume-title":"Service Oriented, Holonic and Multi-agent Manufacturing Systems for Industry of the Future: Proceedings of SOHOMA 2021","author":"Isabel Barros Garcia","year":"2022","unstructured":"Garcia, Isabel Barros, Daaboul, Joanna, Jouglet, Antoine, Le Duigou, Julien: An approach to\u00a0jointly optimize the\u00a0process plan, scheduling, and\u00a0layout design in\u00a0reconfigurable manufacturing systems. In: Borangiu, Theodor, Trentesaux, Damien, Leit\u00e3o, Paulo, Cardin, Olivier, Joblot, Laurent (eds.) Service Oriented, Holonic and Multi-agent Manufacturing Systems for Industry of the Future: Proceedings of SOHOMA 2021, pp. 403\u2013415. Springer International Publishing, Cham (2022). https:\/\/doi.org\/10.1007\/978-3-030-99108-1_29"},{"key":"33_CR5","doi-asserted-by":"crossref","unstructured":"Vahedi-Nouri, B., Tavakkoli-Moghaddam, R., Hanz\u00e1lek, Z., Dolgui, A.: Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration. Int. J. Prod. Res., 1\u201317 (2023)","DOI":"10.1080\/00207543.2023.2173503"},{"key":"33_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2020.106416","volume":"94","author":"M Mahmoodjanloo","year":"2020","unstructured":"Mahmoodjanloo, M., Tavakkoli-Moghaddam, R., Baboli, A., Bozorgi-Amiri, A.: Flexible job shop scheduling problem with reconfigurable machine tools: an improved differential evolution algorithm. Appl. Soft Comput. 94, 106416 (2020)","journal-title":"Appl. Soft Comput."},{"issue":"23","key":"33_CR7","doi-asserted-by":"publisher","first-page":"13323","DOI":"10.3390\/su132313323","volume":"13","author":"S Gao","year":"2021","unstructured":"Gao, S., Daaboul, J., Le Duigou, J.: Process planning, scheduling, and layout optimization for multi-unit mass-customized products in sustainable reconfigurable manufacturing system. Sustainability 13(23), 13323 (2021)","journal-title":"Sustainability"},{"issue":"5","key":"33_CR8","doi-asserted-by":"publisher","first-page":"1945","DOI":"10.1007\/s00170-015-8291-8","volume":"86","author":"J Dou","year":"2016","unstructured":"Dou, J., Li, J., Su, C.: Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II. Int. J. Adv. Manuf. Technol. 86(5), 1945\u20131962 (2016)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"33_CR9","doi-asserted-by":"publisher","first-page":"650","DOI":"10.1016\/j.jmsy.2022.01.014","volume":"62","author":"J Fan","year":"2022","unstructured":"Fan, J., Zhang, C., Liu, Q., Shen, W., Gao, L.: An improved genetic algorithm for flexible job shop scheduling problem considering reconfigurable machine tools with limited auxiliary modules. J. Manuf. Syst. 62, 650\u2013667 (2022)","journal-title":"J. Manuf. Syst."},{"issue":"10","key":"33_CR10","doi-asserted-by":"publisher","first-page":"1284","DOI":"10.1016\/j.ifacol.2022.09.567","volume":"55","author":"M Rohaninejad","year":"2022","unstructured":"Rohaninejad, M., Hanz\u00e1lek, Z., Tavakkoli-Moghaddam, R., Vahedi-Nouri, B.: Integrated lot-sizing and job shop scheduling benefiting from reconfigurable machine tools. IFAC-PapersOnLine 55(10), 1284\u20131289 (2022)","journal-title":"IFAC-PapersOnLine"},{"key":"33_CR11","series-title":"Springer Series in Advanced Manufacturing","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-030-28782-5","volume-title":"Reconfigurable Manufacturing Systems: From Design to Implementation","year":"2020","unstructured":"Benyoucef, Lyes (ed.): Reconfigurable Manufacturing Systems: From Design to Implementation. SSAM, Springer, Cham (2020). https:\/\/doi.org\/10.1007\/978-3-030-28782-5"},{"issue":"10","key":"33_CR12","doi-asserted-by":"publisher","first-page":"2974","DOI":"10.1080\/00207543.2019.1620365","volume":"58","author":"SK Moghaddam","year":"2020","unstructured":"Moghaddam, S.K., Houshmand, M., Saitou, K., Valilai, O.F.: Configuration design of scalable reconfigurable manufacturing systems for part family. Int. J. Prod. Res. 58(10), 2974\u20132996 (2020)","journal-title":"Int. J. Prod. Res."},{"issue":"12","key":"33_CR13","doi-asserted-by":"publisher","first-page":"3583","DOI":"10.1080\/00207543.2013.878056","volume":"52","author":"A Bensmaine","year":"2014","unstructured":"Bensmaine, A., Dahane, M., Benyoucef, L.: A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems. Int. J. Prod. Res. 52(12), 3583\u20133594 (2014)","journal-title":"Int. J. Prod. Res."},{"key":"33_CR14","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/j.cirpj.2022.12.001","volume":"40","author":"S Yang","year":"2023","unstructured":"Yang, S., Wang, J., Xin, L., Xu, Z.: Real-time and concurrent optimization of scheduling and reconfiguration for dynamic reconfigurable flow shop using deep reinforcement learning. CIRP J. Manuf. Sci. Technol. 40, 243\u2013252 (2023)","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"33_CR15","doi-asserted-by":"publisher","first-page":"563","DOI":"10.1016\/j.jmsy.2022.04.018","volume":"63","author":"B Vahedi-Nouri","year":"2022","unstructured":"Vahedi-Nouri, B., Tavakkoli-Moghaddam, R., Hanz\u00e1lek, Z., Dolgui, A.: Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic. J. Manuf. Syst. 63, 563\u2013574 (2022)","journal-title":"J. Manuf. Syst."},{"issue":"1","key":"33_CR16","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G\u00fcnter Schmidt","year":"2000","unstructured":"Schmidt, G\u00fcnter.: Scheduling with limited machine availability. Eur. J. Oper. Res. 121(1), 1\u201315 (2000). https:\/\/doi.org\/10.1016\/S0377-2217(98)00367-1","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"33_CR17","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.cie.2009.04.014","volume":"58","author":"Y Ma","year":"2010","unstructured":"Ma, Y., Chu, C., Zuo, C.: A survey of scheduling with deterministic machine availability constraints. Comput. Ind. Eng. 58(2), 199\u2013211 (2010)","journal-title":"Comput. Ind. Eng."},{"key":"33_CR18","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2023.101243","volume":"77","author":"Y An","year":"2023","unstructured":"An, Y., Chen, X., Gao, K., Zhang, L., Li, Y., Zhao, Z.: Integrated optimization of real-time order acceptance and flexible job-shop rescheduling with multi-level imperfect maintenance constraints. Swarm Evol. Comput. 77, 101243 (2023)","journal-title":"Swarm Evol. Comput."},{"key":"33_CR19","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2023.109399","volume":"238","author":"Y An","year":"2023","unstructured":"An, Y., Chen, X., Hu, J., Zhang, L., Zhao, Z.: Integrated optimization of condition-based preventive maintenance and production rescheduling with multi-phase processing speed selection and old machine scrap. Reliab. Eng. Syst. Saf. 238, 109399 (2023)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"33_CR20","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2022.102804","volume":"116","author":"R Lin","year":"2023","unstructured":"Lin, R., Wang, J.-Q., Oulamara, A.: Online scheduling on parallel-batch machines with periodic availability constraints and job delivery. Omega 116, 102804 (2023)","journal-title":"Omega"},{"issue":"14","key":"33_CR21","doi-asserted-by":"publisher","first-page":"4403","DOI":"10.1080\/00207543.2020.1764125","volume":"59","author":"S-W Lin","year":"2021","unstructured":"Lin, S.-W., Ying, K.-C.: Minimising makespan in job-shops with deterministic machine availability constraints. Int. J. Prod. Res. 59(14), 4403\u20134415 (2021)","journal-title":"Int. J. Prod. Res."},{"issue":"12","key":"33_CR22","doi-asserted-by":"publisher","first-page":"3501","DOI":"10.1080\/00207543.2012.750771","volume":"51","author":"NB Vahedi","year":"2013","unstructured":"Vahedi, N.B., Fattahi, P., Ramezanian, R.: Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities. Int. J. Prod. Res. 51(12), 3501\u20133515 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"33_CR23","doi-asserted-by":"publisher","first-page":"10","DOI":"10.1016\/j.susoc.2021.08.003","volume":"3","author":"R Yazdani","year":"2022","unstructured":"Yazdani, R., Mirmozaffari, M., Shadkam, E., Taleghani, M.: Minimizing total absolute deviation of job completion times on a single machine with maintenance activities using a Lion Optimization Algorithm. Sustain. Oper. Comput. 3, 10\u201316 (2022)","journal-title":"Sustain. Oper. Comput."},{"key":"33_CR24","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2022.108130","volume":"168","author":"RLC Souza","year":"2022","unstructured":"Souza, R.L.C., Ghasemi, A., Saif, A., Gharaei, A.: Robust job-shop scheduling under deterministic and stochastic unavailability constraints due to preventive and corrective maintenance. Comput. Ind. Eng. 168, 108130 (2022)","journal-title":"Comput. Ind. Eng."},{"issue":"5","key":"33_CR25","doi-asserted-by":"publisher","first-page":"1427","DOI":"10.1080\/00207543.2018.1489160","volume":"57","author":"M Benttaleb","year":"2019","unstructured":"Benttaleb, M., Hnaien, F., Yalaoui, F.: Minimising the makespan in the two-machine job shop problem under availability constraints. Int. J. Prod. Res. 57(5), 1427\u20131457 (2019)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"33_CR26","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1177\/1063293X19898727","volume":"28","author":"J Dou","year":"2020","unstructured":"Dou, J., Su, C., Zhao, X.: Mixed integer programming models for concurrent configuration design and scheduling in a reconfigurable manufacturing system. Concurr. Eng. 28(1), 32\u201346 (2020)","journal-title":"Concurr. Eng."},{"key":"33_CR27","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107741","volume":"162","author":"B Naderi","year":"2021","unstructured":"Naderi, B., Azab, A.: Production scheduling for reconfigurable assembly systems: mathematical modeling and algorithms. Comput. Ind. Eng. 162, 107741 (2021)","journal-title":"Comput. Ind. Eng."},{"key":"33_CR28","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1007\/s10601-018-9281-x","volume":"23","author":"P Laborie","year":"2018","unstructured":"Laborie, P., Rogerie, J., Shaw, P., Vil\u00edm, P.: IBM ILOG CP optimizer for scheduling: 20+ years of scheduling with constraints at IBM\/ILOG. Constraints 23, 210\u2013250 (2018)","journal-title":"Constraints"},{"key":"33_CR29","doi-asserted-by":"crossref","unstructured":"Naderi, B., Ruiz, R., Roshanaei, V.: Mixed-integer programming vs. constraint programming for shop scheduling problems: new results and outlook. INFORMS J. Comput. (2023)","DOI":"10.1287\/ijoc.2023.1287"},{"key":"33_CR30","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2022.105676","volume":"118","author":"M Rohaninejad","year":"2023","unstructured":"Rohaninejad, M., Janota, M., Hanz\u00e1lek, Z.: Integrated lot-sizing and scheduling: mitigation of uncertainty in demand and processing time by machine learning. Eng. Appl. Artif. Intell. 118, 105676 (2023)","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"20","key":"33_CR31","doi-asserted-by":"publisher","first-page":"6205","DOI":"10.1080\/00207543.2021.1987550","volume":"60","author":"M Rohaninejad","year":"2022","unstructured":"Rohaninejad, M., Tavakkoli-Moghaddam, R., Vahedi-Nouri, B., Hanz\u00e1lek, Z., Shirazian, S.: A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines. Int. J. Prod. Res. 60(20), 6205\u20136225 (2022)","journal-title":"Int. J. Prod. Res."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-43670-3_33","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,13]],"date-time":"2023-09-13T08:07:45Z","timestamp":1694592465000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-43670-3_33"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023]]},"ISBN":["9783031436697","9783031436703"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-43670-3_33","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2023]]},"assertion":[{"value":"14 September 2023","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Trondheim","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Norway","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2023","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"17 September 2023","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"21 September 2023","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2023","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}