{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T12:06:29Z","timestamp":1742990789116,"version":"3.40.3"},"publisher-location":"Cham","reference-count":16,"publisher":"Springer Nature Switzerland","isbn-type":[{"type":"print","value":"9783031625770"},{"type":"electronic","value":"9783031625787"}],"license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-3-031-62578-7_25","type":"book-chapter","created":{"date-parts":[[2024,6,27]],"date-time":"2024-06-27T07:03:19Z","timestamp":1719471799000},"page":"263-276","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["On Considering a PLM Platform for Design Change Management in Construction"],"prefix":"10.1007","author":[{"given":"Hamidreza","family":"Pourzarei","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Conrad","family":"Boton","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Louis","family":"Rivest","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,6,28]]},"reference":[{"unstructured":"Pourzarei, H., Ghnaya, O., Boton, C., Rivest, L.: Comparing engineering\/design change management and related concepts in BIM- and PLM-supported industry from the literature. Res. Eng. Des. (2022). No. Submitted in Journal of Research in Engineering Design","key":"25_CR1"},{"unstructured":"Hao, Q., Shen, W., Neelamkavil, J., Thomas, R.: Change management in construction projects. NRC Inst. Res. Constr. NRCC-50325 (2008)","key":"25_CR2"},{"key":"25_CR3","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"publisher","first-page":"630","DOI":"10.1007\/978-3-642-41501-2_62","volume-title":"Product Lifecycle Management for Society","author":"JR Jupp","year":"2013","unstructured":"Jupp, J.R.: Incomplete BIM implementation: exploring challenges and the role of product lifecycle management functions. In: Bernard, A., Rivest, L., Dutta, D. (eds.) PLM 2013. IAICT, vol. 409, pp. 630\u2013640. Springer, Heidelberg (2013). https:\/\/doi.org\/10.1007\/978-3-642-41501-2_62"},{"key":"25_CR4","doi-asserted-by":"publisher","DOI":"10.1002\/9781119287568","volume-title":"A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers","author":"R Sacks","year":"2018","unstructured":"Sacks, R., Eastman, C., Lee, G., Teicholz, P., Handbook, B.I.M.: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers. Wiley, Hoboken (2018)"},{"issue":"3","key":"25_CR5","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1504\/IJPLM.2018.094714","volume":"11","author":"C Boton","year":"2018","unstructured":"Boton, C., Rivest, L., Forgues, D., Jupp, J.R.: Comparison of shipbuilding and construction industries from the product structure standpoint. Int. J. Prod. Lifecycle Manag. 11(3), 191 (2018). https:\/\/doi.org\/10.1504\/IJPLM.2018.094714","journal-title":"Int. J. Prod. Lifecycle Manag."},{"issue":"3","key":"25_CR6","doi-asserted-by":"publisher","first-page":"368","DOI":"10.1016\/j.autcon.2006.07.005","volume":"16","author":"IA Motawa","year":"2007","unstructured":"Motawa, I.A., Anumba, C.J., Lee, S., Pe\u00f1a-Mora, F.: An integrated system for change management in construction. Autom. Constr. 16(3), 368\u2013377 (2007)","journal-title":"Autom. Constr."},{"issue":"2","key":"25_CR7","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1061\/(ASCE)0733-9364(2008)134:2(139)","volume":"134","author":"S Isaac","year":"2008","unstructured":"Isaac, S., Navon, R.: Feasibility study of an automated tool for identifying the implications of changes in construction projects. J. Constr. Eng. Manag. 134(2), 139\u2013145 (2008)","journal-title":"J. Constr. Eng. Manag."},{"unstructured":"Biovia, D.S.: 3DEXPERIENCE User Assistance. Dassault Syst\u00e8mes (2022). https:\/\/www.3ds.com\/support\/documentation\/users-guides\/","key":"25_CR8"},{"issue":"4","key":"25_CR9","first-page":"261","volume":"2","author":"M Sun","year":"2006","unstructured":"Sun, M., Fleming, A., Senaratne, S., Motawa, I., Yeoh, M.L.: A change management toolkit for construction projects. Archit. Eng. Des. Manag. 2(4), 261\u2013271 (2006)","journal-title":"Archit. Eng. Des. Manag."},{"issue":"1","key":"25_CR10","first-page":"39","volume":"13","author":"\u00d8 Mejl\u00e6nder-Larsen","year":"2017","unstructured":"Mejl\u00e6nder-Larsen, \u00d8.: Using a change control system and building information modelling to manage change in design. Archit. Eng. Des. Manag. 13(1), 39\u201351 (2017)","journal-title":"Archit. Eng. Des. Manag."},{"issue":"7","key":"25_CR11","doi-asserted-by":"publisher","first-page":"817","DOI":"10.1016\/j.ijproman.2011.11.001","volume":"30","author":"B-G Hwang","year":"2012","unstructured":"Hwang, B.-G., Low, L.K.: Construction project change management in Singapore: status, importance and impact. Int. J. Proj. Manag. 30(7), 817\u2013826 (2012). https:\/\/doi.org\/10.1016\/j.ijproman.2011.11.001","journal-title":"Int. J. Proj. Manag."},{"unstructured":"Ibbs, W.: \u2018Project Change Management.\u2019 Construction Industry Institute Special Publication, Austin, Texas (1994)","key":"25_CR12"},{"key":"25_CR13","volume-title":"CMII for Business Process Infrastructure","author":"VC Guess","year":"2002","unstructured":"Guess, V.C.: CMII for Business Process Infrastructure. Holly Publishing Company, Lancaster (2002)"},{"unstructured":"Maurino, M.: La gestion des donn\u00e9es techniques: technologie du concurrent engineering. Masson, Paris (1993)","key":"25_CR14"},{"doi-asserted-by":"publisher","unstructured":"Pourzarei, H., Rivest, L., Boton, C.: Cross-Pollination as a comparative analysis approach to comparing BIM and PLM: a literature review. In: Nyffenegger, F., R\u00edos, J., Rivest, L., Bouras, A. (eds.) PLM 2020. IFIP, vol. 594, pp. 724\u2013737. Springer, Cham (2020). https:\/\/doi.org\/10.1007\/978-3-030-62807-9_57","key":"25_CR15","DOI":"10.1007\/978-3-030-62807-9_57"},{"unstructured":"Ghnaya, O.: Comparaison des outils informatiques pour la gestion des modifications de conception\/d\u2019ing\u00e9nierie entre les industries soutenues par le BIM et le PLM, Master thesis, \u00c9cole de technologie sup\u00e9rieure (2023)","key":"25_CR16"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management. Leveraging Digital Twins, Circular Economy, and Knowledge Management for Sustainable Innovation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-62578-7_25","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,27]],"date-time":"2024-06-27T07:11:36Z","timestamp":1719472296000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-62578-7_25"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"ISBN":["9783031625770","9783031625787"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-62578-7_25","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"28 June 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"PLM","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Product Lifecycle Management","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Montreal, QC","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Canada","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2023","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 July 2023","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"12 July 2023","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"20","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"plm2023","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.plm-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}