{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,31]],"date-time":"2026-03-31T00:03:10Z","timestamp":1774915390910,"version":"3.50.1"},"publisher-location":"Cham","reference-count":10,"publisher":"Springer Nature Switzerland","isbn-type":[{"value":"9783031658938","type":"print"},{"value":"9783031658945","type":"electronic"}],"license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-3-031-65894-5_2","type":"book-chapter","created":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T17:02:36Z","timestamp":1725555756000},"page":"17-28","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Data-Driven Scheduling of Cellular Manufacturing Systems Using Process Mining with Petri Nets"],"prefix":"10.1007","author":[{"given":"Hidefumi","family":"Kurakado","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tatsushi","family":"Nishi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ziang","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,9,6]]},"reference":[{"issue":"2","key":"2_CR1","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1080\/19761597.2010.9668694","volume":"18","author":"C Liu","year":"2010","unstructured":"Liu, C., Lian, J., Yin, Y., Li, W.: Seru seisan - an innovation of the production management mode in Japan. Asian J. Technol. Innov. 18(2), 89\u2013113 (2010)","journal-title":"Asian J. Technol. Innov."},{"issue":"3","key":"2_CR2","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1007\/BF02601620","volume":"7","author":"JA Cecil","year":"1992","unstructured":"Cecil, J.A., Srihari, K., Emerson, C.R.: A review of Petri-net applications in manufacturing. Int. J. Adv. Manuf. Technol. 7(3), 168\u2013177 (1992)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"18","key":"2_CR3","doi-asserted-by":"publisher","first-page":"2305","DOI":"10.3390\/electronics10182305","volume":"10","author":"I Grobelna","year":"2021","unstructured":"Grobelna, I., Karatkevich, A.: Challenges in application of Petri nets in manufacturing systems. Electronic 10(18), 2305 (2021)","journal-title":"Electronic"},{"issue":"3","key":"2_CR4","doi-asserted-by":"publisher","first-page":"846","DOI":"10.1080\/00207543.2015.1083626","volume":"54","author":"F Alhourani","year":"2016","unstructured":"Alhourani, F.: Cellular manufacturing system design considering machines reliability and parts alternative process routings. Int. J. Prod. Res. 54(3), 846\u2013863 (2016)","journal-title":"Int. J. Prod. Res."},{"issue":"19","key":"2_CR5","doi-asserted-by":"publisher","first-page":"5656","DOI":"10.1080\/00207543.2014.903343","volume":"52","author":"GA S\u00fcer","year":"2014","unstructured":"S\u00fcer, G.A., Ates, O.K., Mese, E.M.: Cell loading and family scheduling for jobs with individual due dates to minimise maximum tardiness. Int. J. Prod. Res. 52(19), 5656\u20135674 (2014)","journal-title":"Int. J. Prod. Res."},{"issue":"18","key":"2_CR6","doi-asserted-by":"publisher","first-page":"8312","DOI":"10.3390\/app11188312","volume":"11","author":"R Ferro","year":"2021","unstructured":"Ferro, R., Cordeiro, G.A., Ord\u00f3\u00f1ez, R.E.C., Beydoun, G., Shukla, N.: An optimization tool for production planning: a case study in a textile industry. Appl. Sci. 11(18), 8312 (2021)","journal-title":"Appl. Sci."},{"issue":"11","key":"2_CR7","first-page":"7","volume":"20","author":"T Kloud","year":"2018","unstructured":"Kloud, T., Koblasa, F.: Solving job shop scheduling with the computer simulation. Int. J. Transp. Logist. 20(11), 7\u201317 (2018)","journal-title":"Int. J. Transp. Logist."},{"issue":"3","key":"2_CR8","doi-asserted-by":"publisher","first-page":"143","DOI":"10.3311\/PPme.7888","volume":"59","author":"C Haraszk\u00f3","year":"2015","unstructured":"Haraszk\u00f3, C., N\u00e9meth, I.: DES configurators for rapid virtual prototyping and optimization of manufacturing systems. Periodica Polytechnica Mech. Eng. 59(3), 143\u2013152 (2015)","journal-title":"Periodica Polytechnica Mech. Eng."},{"key":"2_CR9","doi-asserted-by":"publisher","unstructured":"Van Der Aalst, W.M.P.: Process Mining: Data Science in Action, Springer, Heidelberg (2018). https:\/\/doi.org\/10.1007\/978-3-662-49851-4","DOI":"10.1007\/978-3-662-49851-4"},{"key":"2_CR10","doi-asserted-by":"crossref","unstructured":"Berti, A., Zelst, S.V., Schuster, D.: PM4Py: a process mining library for Python. Softw. Impacts 17, 100556 (2023)","DOI":"10.1016\/j.simpa.2023.100556"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-65894-5_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,4]],"date-time":"2025-04-04T07:28:05Z","timestamp":1743751685000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-65894-5_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"ISBN":["9783031658938","9783031658945"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-65894-5_2","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"6 September 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chemnitz","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2024","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 September 2024","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 September 2024","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"43","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2024","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}