{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,27]],"date-time":"2026-07-27T23:30:30Z","timestamp":1785195030016,"version":"3.55.0"},"publisher-location":"Cham","reference-count":44,"publisher":"Springer Nature Switzerland","isbn-type":[{"value":"9783031658938","type":"print"},{"value":"9783031658945","type":"electronic"}],"license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-3-031-65894-5_3","type":"book-chapter","created":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T17:02:36Z","timestamp":1725555756000},"page":"29-43","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A Study on\u00a0Sophisticated Production Management for\u00a0Engineer-to-Order Production: A Mixed Integer Programming Formulation for\u00a0Production Scheduling"],"prefix":"10.1007","author":[{"given":"Eiji","family":"Morinaga","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Koji","family":"Iwamura","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yoshiyuki","family":"Hirahara","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Masamitsu","family":"Fukuda","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ayumu","family":"Niinuma","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hirotomo","family":"Oshima","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yasuo","family":"Namioka","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2024,9,6]]},"reference":[{"key":"3_CR1","doi-asserted-by":"publisher","unstructured":"Hirahara, Y., et al.: A study on sophisticated production management for engineer-to-order production. In: Proceedings of the Japan Joint Automatic Control Conference (2022). 2E2-1 (In Japanese). https:\/\/doi.org\/10.11511\/jacc.65.0_1156","DOI":"10.11511\/jacc.65.0_1156"},{"issue":"3","key":"3_CR2","doi-asserted-by":"publisher","first-page":"551","DOI":"10.1111\/itor.12199","volume":"23","author":"IA Chaudhry","year":"2016","unstructured":"Chaudhry, I.A., Khan, A.A.: A research survey: review of flexible job shop scheduling techniques. Int. Trans. Oper. Res. 23(3), 551\u2013591 (2016). https:\/\/doi.org\/10.1111\/itor.12199","journal-title":"Int. Trans. Oper. Res."},{"issue":"2","key":"3_CR3","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1016\/j.ejor.2023.05.017","volume":"314","author":"S Dauz\u00e8re-P\u00e9r\u00e8s","year":"2024","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s, S., Ding, J., Shen, L., Tamssaouet, K.: The flexible job shop scheduling problem: a review. Eur. J. Oper. Res. 314(2), 409\u2013432 (2024). https:\/\/doi.org\/10.1016\/j.ejor.2023.05.017","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"3_CR4","doi-asserted-by":"publisher","first-page":"1539","DOI":"10.1016\/j.apm.2009.09.002","volume":"34","author":"C \u00d6zg\u00fcven","year":"2010","unstructured":"\u00d6zg\u00fcven, C., \u00d6zbakir, L., Yavuz, Y.: Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl. Math. Model. 34(6), 1539\u20131548 (2010). https:\/\/doi.org\/10.1016\/j.apm.2009.09.002","journal-title":"Appl. Math. Model."},{"issue":"3","key":"3_CR5","doi-asserted-by":"publisher","first-page":"977","DOI":"10.1016\/j.apm.2012.03.020","volume":"37","author":"Y Demir","year":"2013","unstructured":"Demir, Y., \u0130\u015fleyen, S.K.: Evaluation of mathematical models for flexible job-shop scheduling problems. Appl. Math. Model. 37(3), 977\u2013988 (2013). https:\/\/doi.org\/10.1016\/j.apm.2012.03.020","journal-title":"Appl. Math. Model."},{"issue":"10","key":"3_CR6","doi-asserted-by":"publisher","first-page":"3202","DOI":"10.1016\/j.cor.2007.02.014","volume":"35","author":"F Pezzella","year":"2008","unstructured":"Pezzella, F., Morganti, G., Ciaschette, G.: A genetic algorithm for the flexible job-shop scheduling problem. Comput. Oper. Res. 35(10), 3202\u20133212 (2008). https:\/\/doi.org\/10.1016\/j.cor.2007.02.014","journal-title":"Comput. Oper. Res."},{"key":"3_CR7","doi-asserted-by":"publisher","unstructured":"Roshanaei, V., Azab, A., ElMaraghy, H.: Mathematical modelling and a meta-heuristic for flexible job shop scheduling. Int. J. Prod. Res.51(20), 6247\u20136274 (2013). https:\/\/doi.org\/10.1080\/00207543.2013.827806","DOI":"10.1080\/00207543.2013.827806"},{"key":"3_CR8","series-title":"Operations Research\/Computer Science Interfaces Series","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1007\/978-3-319-23350-5_13","volume-title":"Metaheuristics for Production Systems","author":"M Gaham","year":"2016","unstructured":"Gaham, M., Bouzouia, B., Achour, N., Tebani, K.: Meta-heuristics approaches for the flexible job shop scheduling problem. In: Talbi, E.-G., Yalaoui, F., Amodeo, L. (eds.) Metaheuristics for Production Systems. ORSIS, vol. 60, pp. 285\u2013314. Springer, Cham (2016). https:\/\/doi.org\/10.1007\/978-3-319-23350-5_13"},{"key":"3_CR9","doi-asserted-by":"publisher","unstructured":"Kaweegitbundit, P., Eguchi, T.: Flexible job shop scheduling using genetic algorithm and heuristic rules. J. Adv. Mech. Des. Syst. Manuf. 10(1), JAMDSM0010 (2016). https:\/\/doi.org\/10.1299\/jamdsm.2016jamdsm0010","DOI":"10.1299\/jamdsm.2016jamdsm0010"},{"key":"3_CR10","doi-asserted-by":"publisher","unstructured":"Zaidi, M., Amirat, A., Jarboui, B., Yahyaoui, A.: A hybrid meta-heuristic to solve flexible job shop scheduling problem. In: Alharbi, I., Ben Ncir, CE., Alyoubi, B., Ben-Romdhane, H. (eds.) Advances in Computational Logistics and Supply Chain Analytics. Unsupervised and Semi-Supervised Learning. Springer, Cham (2024). https:\/\/doi.org\/10.1007\/978-3-031-50036-7_4","DOI":"10.1007\/978-3-031-50036-7_4"},{"issue":"2","key":"3_CR11","doi-asserted-by":"publisher","first-page":"1600","DOI":"10.1109\/TII.2022.3189725","volume":"19","author":"W Song","year":"2023","unstructured":"Song, W., Chen, X., Li, Q., Cao, Z.: Flexible job-shop scheduling via graph neural network and deep reinforcement learning. IEEE Trans. Industr. Inf. 19(2), 1600\u20131610 (2023). https:\/\/doi.org\/10.1109\/TII.2022.3189725","journal-title":"IEEE Trans. Industr. Inf."},{"key":"3_CR12","doi-asserted-by":"publisher","unstructured":"Pan, F.S., Ye, C.M., Yang, J.: Flexible job-shop scheduling problem under uncertainty based on QPSO algorithm. Adv. Mater. Res. 605, 487\u2013492 (2012). https:\/\/doi.org\/10.4028\/www.scientific.net\/amr.605-607.487","DOI":"10.4028\/www.scientific.net\/amr.605-607.487"},{"key":"3_CR13","doi-asserted-by":"publisher","unstructured":"Li, W.-L., Murata, T., Bin Md Fauadi, M.H.F.: Robust scheduling for flexible job-shop problems with uncertain processing times. IEEJ Trans. Electron. Inf. Syst. 135(6), 713\u2013720 (2015). https:\/\/doi.org\/10.1541\/ieejeiss.135.713","DOI":"10.1541\/ieejeiss.135.713"},{"key":"3_CR14","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2022.109783","volume":"131","author":"N Chen","year":"2022","unstructured":"Chen, N., Xie, N., Wang, Y.: An elite genetic algorithm for flexible job shop scheduling problem with extracted grey processing time. Appl. Soft Comput. 131, 109783 (2022). https:\/\/doi.org\/10.1016\/j.asoc.2022.109783","journal-title":"Appl. Soft Comput."},{"issue":"1\u20134","key":"3_CR15","doi-asserted-by":"publisher","first-page":"501","DOI":"10.1007\/s00170-012-4344-4","volume":"66","author":"W He","year":"2013","unstructured":"He, W., Sun, D.: Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies. Int. J. Adv. Manuf. Technol. 66(1\u20134), 501\u2013514 (2013). https:\/\/doi.org\/10.1007\/s00170-012-4344-4","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"13","key":"3_CR16","doi-asserted-by":"publisher","first-page":"3858","DOI":"10.1080\/00207543.2013.784408","volume":"52","author":"D-H Sun","year":"2013","unstructured":"Sun, D.-H., He, W., Zheng, L.-J., Liao, X.-Y.: Scheduling flexible job shop problem subject to machine breakdown with game theory. Int. J. Prod. Res. 52(13), 3858\u20133876 (2013). https:\/\/doi.org\/10.1080\/00207543.2013.784408","journal-title":"Int. J. Prod. Res."},{"key":"3_CR17","doi-asserted-by":"publisher","unstructured":"Ayyoubzadeh, B., Ebrahimnejad, S., Bashiri, M., Baradaran, V., Hosseini, S.M.H.: A reactive approach for flexible job shop scheduling problem with tardiness penalty under uncertainty. Sci. Iranica 29 (2022). https:\/\/doi.org\/10.24200\/sci.2022.58491.5754","DOI":"10.24200\/sci.2022.58491.5754"},{"key":"3_CR18","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.117460","volume":"203","author":"G Zhang","year":"2022","unstructured":"Zhang, G., Lu, X., Liu, X., Zhang, L., Wei, S., Zhang, W.: An effective two-stage algorithm based on convolutional neural network for the bi-objective flexible job shop scheduling problem with machine breakdown. Expert Syst. Appl. 203, 117460 (2022). https:\/\/doi.org\/10.1016\/j.eswa.2022.117460","journal-title":"Expert Syst. Appl."},{"key":"3_CR19","doi-asserted-by":"publisher","first-page":"105480","DOI":"10.1016\/j.asoc.2019.05.007","volume":"81","author":"G Deng","year":"2019","unstructured":"Deng, G., Zhang, Z., Jiang, T., Zhang, S.: Total flow time minimization in no-wait job shop using a hybrid discrete group search optimizer. Appl. Soft Comput. 81, 105480 (2019). https:\/\/doi.org\/10.1016\/j.asoc.2019.05.007","journal-title":"Appl. Soft Comput."},{"issue":"7","key":"3_CR20","doi-asserted-by":"publisher","first-page":"1979","DOI":"10.1080\/00207543.2011.561375","volume":"50","author":"S Lee","year":"2012","unstructured":"Lee, S., Moon, I., Bae, H., Kim, J.: Flexible job-shop scheduling problems with \u2018AND\u2019\/\u2018OR\u2019 precedence constraints. Int. J. Prod. Res. 50(7), 1979\u20132001 (2012). https:\/\/doi.org\/10.1080\/00207543.2011.561375","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"3_CR21","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1002\/jos.102","volume":"5","author":"SJ Mason","year":"2002","unstructured":"Mason, S.J., Fowler, J.W., Matthew, C.W.: A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. J. Sched. 5(3), 247\u2013262 (2002). https:\/\/doi.org\/10.1002\/jos.102","journal-title":"J. Sched."},{"key":"3_CR22","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1007\/s00354-008-0048-6","volume":"26","author":"LN Xing","year":"2008","unstructured":"Xing, L.N., Chen, Y.W., Yang, K.W.: Double layer ACO algorithm for the multi-objective FJSSP. N. Gener. Comput. 26, 313\u2013327 (2008). https:\/\/doi.org\/10.1007\/s00354-008-0048-6","journal-title":"N. Gener. Comput."},{"key":"3_CR23","doi-asserted-by":"publisher","unstructured":"Davarzani, Z., Akbarzadeh-T, M.-R, Khairdoost, N.: Multiobjective artificial immune algorithm for flexible job shop scheduling problem. Int. J. Hybrid Inf. Technol. 5(3), 75\u201388 (2012). https:\/\/doi.org\/10.14257\/ijhit.2012.5.3.08","DOI":"10.14257\/ijhit.2012.5.3.08"},{"key":"3_CR24","doi-asserted-by":"publisher","unstructured":"Gao, K.Z., Suganthan, P.N., Pan, Q.K., Chua, T.J., Cai, T.X., Chong, C.S.: Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling. Inf. Sci. 289, 76\u201390 (2014). https:\/\/doi.org\/10.1016\/j.ins.2014.07.039","DOI":"10.1016\/j.ins.2014.07.039"},{"issue":"9","key":"3_CR25","doi-asserted-by":"publisher","first-page":"1871","DOI":"10.1007\/s00170-015-7347-0","volume":"81","author":"G Zambrano Rey","year":"2015","unstructured":"Zambrano Rey, G., Bekrar, A., Trentesaux, D., Zhou, B.-H.: Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs. Int. J. Adv. Manuf. Technol. 81(9), 1871\u20131891 (2015). https:\/\/doi.org\/10.1007\/s00170-015-7347-0","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"17","key":"3_CR26","doi-asserted-by":"publisher","first-page":"5120","DOI":"10.1080\/00207543.2013.793428","volume":"51","author":"MC Gomes","year":"2013","unstructured":"Gomes, M.C., Barbosa-P\u00f3voa, A.P., Novais, A.Q.: Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach. Int. J. Prod. Res. 51(17), 5120\u20135141 (2013). https:\/\/doi.org\/10.1080\/00207543.2013.793428","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"3_CR27","doi-asserted-by":"publisher","first-page":"992","DOI":"10.1016\/j.ejor.2023.03.041","volume":"310","author":"L Shen","year":"2023","unstructured":"Shen, L., Dauz\u00e8re-P\u00e9r\u00e8s, S., Maecker, S.: Energy cost efficient scheduling in flexible job-shop manufacturing systems. Eur. J. Oper. Res. 310(3), 992\u20131016 (2023). https:\/\/doi.org\/10.1016\/j.ejor.2023.03.041","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"3_CR28","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1016\/S0377-2217(99)00285-4","volume":"126","author":"WHM Raaymakers","year":"2000","unstructured":"Raaymakers, W.H.M., Hoogeveen, J.A.: Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. Eur. J. Oper. Res. 126(1), 131\u2013151 (2000). https:\/\/doi.org\/10.1016\/S0377-2217(99)00285-4","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"3_CR29","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1016\/j.ejor.2004.04.020","volume":"165","author":"R Alvarez-Valdes","year":"2005","unstructured":"Alvarez-Valdes, R., Fuertes, A., Tamarit, J.M., Gim\u00e9nez, G., Ramos, R.: A heuristic to schedule flexible job-shop in a glass factory. Eur. J. Oper. Res. 165(2), 525\u2013534 (2005). https:\/\/doi.org\/10.1016\/j.ejor.2004.04.020","journal-title":"Eur. J. Oper. Res."},{"issue":"11","key":"3_CR30","doi-asserted-by":"publisher","first-page":"1293","DOI":"10.1016\/j.ifacol.2018.08.354","volume":"51","author":"A Aschauer","year":"2018","unstructured":"Aschauer, A., Roetzer, F., Steinboeck, A., Kugi, A.: Scheduling of a flexible job shop with multiple constraints. IFAC-PapersOnLine 51(11), 1293\u20131298 (2018). https:\/\/doi.org\/10.1016\/j.ifacol.2018.08.354","journal-title":"IFAC-PapersOnLine"},{"issue":"1","key":"3_CR31","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/j.ejor.2021.03.069","volume":"296","author":"K Tamssaouet","year":"2022","unstructured":"Tamssaouet, K., Dauz\u00e8re-P\u00e9r\u00e8s, S., Knopp, S., Bitar, A., Yugma, C.: Multiobjective optimization for complex flexible job-shop scheduling problems. Eur. J. Oper. Res. 296(1), 87\u2013100 (2022). https:\/\/doi.org\/10.1016\/j.ejor.2021.03.069","journal-title":"Eur. J. Oper. Res."},{"issue":"12","key":"3_CR32","doi-asserted-by":"publisher","first-page":"3476","DOI":"10.1080\/00207543.2012.746480","volume":"51","author":"M Mousakhani","year":"2013","unstructured":"Mousakhani, M.: Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness. Int. J. Prod. Res. 51(12), 3476\u20133487 (2013). https:\/\/doi.org\/10.1080\/00207543.2012.746480","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"3_CR33","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi, A.: The third comprehensive survey on scheduling problems with setup times\/costs. Eur. J. Oper. Res. 246(2), 345\u2013378 (2015). https:\/\/doi.org\/10.1016\/j.ejor.2015.04.004","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR34","doi-asserted-by":"publisher","first-page":"1654","DOI":"10.1016\/j.procs.2022.01.366","volume":"200","author":"P Winklehner","year":"2022","unstructured":"Winklehner, P., Hauder, V.A.: Flexible job-shop scheduling with release dates, deadlines and sequence dependent setup times: a real-world case. Procedia Comput. Sci. 200, 1654\u20131663 (2022). https:\/\/doi.org\/10.1016\/j.procs.2022.01.366","journal-title":"Procedia Comput. Sci."},{"issue":"5","key":"3_CR35","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1016\/j.rcim.2006.06.004","volume":"23","author":"A Rossi","year":"2007","unstructured":"Rossi, A., Dini, G.: Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Robot. Comput. Integr. Manuf. 23(5), 503\u2013516 (2007). https:\/\/doi.org\/10.1016\/j.rcim.2006.06.004","journal-title":"Robot. Comput. Integr. Manuf."},{"issue":"2","key":"3_CR36","doi-asserted-by":"publisher","first-page":"846","DOI":"10.1016\/j.apm.2011.07.037","volume":"36","author":"C \u00d6zg\u00fcven","year":"2012","unstructured":"\u00d6zg\u00fcven, C., Yavuz, Y., \u00d6zbakir, L.: Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times. Appl. Math. Model. 36(2), 846\u2013858 (2012). https:\/\/doi.org\/10.1016\/j.apm.2011.07.037","journal-title":"Appl. Math. Model."},{"key":"3_CR37","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2022.108786","volume":"174","author":"X Li","year":"2022","unstructured":"Li, X., et al.: Survey of integrated flexible job shop scheduling problems. Comput. Ind. Eng. 174, 108786 (2022). https:\/\/doi.org\/10.1016\/j.cie.2022.108786","journal-title":"Comput. Ind. Eng."},{"issue":"17","key":"3_CR38","doi-asserted-by":"publisher","first-page":"4523","DOI":"10.1080\/00207540210147043","volume":"40","author":"A Baykaso\u011flu","year":"2002","unstructured":"Baykaso\u011flu, A.: Linguistic-based meta-heuristic optimization model for flexible job shop scheduling. Int. J. Prod. Res. 40(17), 4523\u20134543 (2002). https:\/\/doi.org\/10.1080\/00207540210147043","journal-title":"Int. J. Prod. Res."},{"key":"3_CR39","doi-asserted-by":"publisher","unstructured":"Baykaso\u011flu, A., \u00d6zbakir, L., S\u00f6nmez, A.\u0130: Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems. J. Intell. Manuf. 15(6), 777\u2013785 (2004). https:\/\/doi.org\/10.1023\/B:JIMS.0000042663.16199.84","DOI":"10.1023\/B:JIMS.0000042663.16199.84"},{"issue":"23","key":"3_CR40","doi-asserted-by":"publisher","first-page":"14893","DOI":"10.1007\/s00500-021-06053-0","volume":"25","author":"A Baykaso\u011flu","year":"2021","unstructured":"Baykaso\u011flu, A., Madeno\u011flu, F.S.: Greedy randomized adaptive search procedure for simultaneous scheduling of production and preventive maintenance activities in dynamic flexible job shops. Soft. Comput. 25(23), 14893\u201314932 (2021). https:\/\/doi.org\/10.1007\/s00500-021-06053-0","journal-title":"Soft. Comput."},{"key":"3_CR41","doi-asserted-by":"publisher","first-page":"460","DOI":"10.1007\/978-3-031-43688-8_32","volume-title":"Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures: IFIP WG 5.7 International Conference, APMS 2023, Trondheim, Norway, September 17\u201321, 2023, Proceedings, Part IV","author":"R Ghorbani Saber","year":"2023","unstructured":"Ghorbani Saber, R., Leyman, P., Aghezzaf, E.-H.: Mixed integer programming for\u00a0integrated flexible job-shop and\u00a0operator scheduling in\u00a0flexible manufacturing systems. In: Alfnes, E., Romsdal, A., Strandhagen, J.O., von Cieminski, G., Romero, D. (eds.) Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures: IFIP WG 5.7 International Conference, APMS 2023, Trondheim, Norway, September 17\u201321, 2023, Proceedings, Part IV, pp. 460\u2013470. Springer Nature Switzerland, Cham (2023). https:\/\/doi.org\/10.1007\/978-3-031-43688-8_32"},{"key":"3_CR42","doi-asserted-by":"publisher","unstructured":"Morinaga, E., Sakaguchi, Y., Wakamatsu, H., Arai, E.: A method for flexible job-shop scheduling considering workers and teams. In: Proceedings of International Conference on Leading Edge Manufacturing in 21st century : LEM21, 126 (2017). https:\/\/doi.org\/10.1299\/jsmelem.2017.9.126","DOI":"10.1299\/jsmelem.2017.9.126"},{"key":"3_CR43","unstructured":"Hirahara, Y., et al.: A study on sophisticated production management for engineer-to-order production\u2014A load planning method based on integer programming problem for long-term production plan. In: Proceedings of the Scheduling Symposium (2023). GS6-1. (In Japanese)"},{"key":"3_CR44","doi-asserted-by":"crossref","unstructured":"Iwamura, K., et al.: A study on hierarchical production planning framework for engineer-to-order production of large products. In: Proceedings of International Symposium on Flexible Automation (2024). Accepted","DOI":"10.1115\/ISFA2024-140135"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-65894-5_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,4]],"date-time":"2025-04-04T07:29:36Z","timestamp":1743751776000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-65894-5_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"ISBN":["9783031658938","9783031658945"],"references-count":44,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-65894-5_3","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"6 September 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chemnitz","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2024","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 September 2024","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 September 2024","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"43","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2024","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}