{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T10:12:39Z","timestamp":1742983959690,"version":"3.40.3"},"publisher-location":"Cham","reference-count":35,"publisher":"Springer Nature Switzerland","isbn-type":[{"type":"print","value":"9783031716362"},{"type":"electronic","value":"9783031716379"}],"license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-3-031-71637-9_5","type":"book-chapter","created":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T21:02:18Z","timestamp":1725742938000},"page":"61-75","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Optimization of Reconfigurable Manufacturing Systems Configuration Using Constraint Programming"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0009-0003-4118-722X","authenticated-orcid":false,"given":"Damien","family":"Lovato","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5961-6406","authenticated-orcid":false,"given":"Hamza","family":"Bouzekri","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0359-6335","authenticated-orcid":false,"given":"Rachel Campos","family":"Sabioni","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6552-5989","authenticated-orcid":false,"given":"Slim","family":"Zidi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,9,8]]},"reference":[{"key":"5_CR1","doi-asserted-by":"crossref","unstructured":"Koren, Y., Ulsoy, A.G.: Reconfigurable manufacturing systems. Engineering research center for reconfigurable machining systems. CIRP Ann. 48(2), 527\u2013540 (1999)","DOI":"10.1016\/S0007-8506(07)63232-6"},{"issue":"59","key":"5_CR2","doi-asserted-by":"publisher","first-page":"6400","DOI":"10.1080\/00207543.2020.1813913","volume":"21","author":"AR Yelles-Chaouche","year":"2021","unstructured":"Yelles-Chaouche, A.R., Gurevsky, E., Brahimi, N., Dolgui, A.: Reconfigurable manufacturing systems from an optimization perspective: a focused review of literature. Int. J. Prod. Res. 21(59), 6400\u20136418 (2021)","journal-title":"Int. J. Prod. Res."},{"key":"5_CR3","doi-asserted-by":"crossref","unstructured":"Campos Sabioni, R., Daaboul, J., Le Duigou, J.: Optimization of Reconfigurable Manufacturing Systems configuration: a literature review. In: Joint Conference on Mechanics, Design Engineering and Advanced Manufacturing 2020, pp. 426\u2013435 (2021)","DOI":"10.1007\/978-3-030-70566-4_67"},{"key":"5_CR4","doi-asserted-by":"publisher","first-page":"923","DOI":"10.1080\/09511920902870650","volume":"22","author":"J Dou","year":"2009","unstructured":"Dou, J., Dai, X., Meng, Z.: Precedence graphoriented approach to optimise single-product flow-line configurations of reconfigurable manufacturing system. Int. J. Comput. Integr. Manuf. 22, 923\u2013940 (2009)","journal-title":"Int. J. Comput. Integr. Manuf."},{"issue":"14","key":"5_CR5","doi-asserted-by":"publisher","first-page":"4071","DOI":"10.1080\/00207540903036305","volume":"48","author":"J Dou","year":"2010","unstructured":"Dou, J., Dai, X., Meng, Z.: Optimisation for multi-part flow-line configuration of reconfigurable manufacturing system using GA. Int. J. Prod. Res. 48(14), 4071\u20134100 (2010)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"5_CR6","doi-asserted-by":"publisher","DOI":"10.1115\/1.4024288","volume":"135","author":"A Bryan","year":"2013","unstructured":"Bryan, A., Jack, H., Koren, Y.: Assembly system reconfiguration planning. J. Manuf. Sci. Eng. 135(4), 041005 (2013)","journal-title":"J. Manuf. Sci. Eng."},{"key":"5_CR7","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1007\/s10696-007-9020-x","volume":"19","author":"AMA Youssef","year":"2007","unstructured":"Youssef, A.M.A., ElMaraghy, H.A.: Optimal configuration selection for reconfigurable manufacturing systems. Int. J. Flex. Manuf. Syst. 19, 67\u2013106 (2007)","journal-title":"Int. J. Flex. Manuf. Syst."},{"key":"5_CR8","doi-asserted-by":"crossref","unstructured":"Ashraf, M., Hasan, F.: configuration selection for a reconfigurable manufacturing flow line involving part production with operation constraints. Int. J. Adv. Manufac. Technol. 98, 2137\u20132156 (2018)","DOI":"10.1007\/s00170-018-2361-7"},{"key":"5_CR9","doi-asserted-by":"crossref","unstructured":"Dou, J., Li, J., Su, C.: Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II. Int. J. Adv. Manufac. Technol. 86, 1945\u20131962 (2016)","DOI":"10.1007\/s00170-015-8291-8"},{"key":"5_CR10","doi-asserted-by":"publisher","first-page":"1719","DOI":"10.1007\/s00170-018-2826-8","volume":"100","author":"A Kumar","year":"2018","unstructured":"Kumar, A., Pattanaik, L.N., Agrawal, R.: Optimal sequence planning for multi-model reconfigurable assembly systems. Int. J. Adv. Manufac. Technol. 100, 1719\u20131730 (2018)","journal-title":"Int. J. Adv. Manufac. Technol."},{"key":"5_CR11","first-page":"1587","volume":"84","author":"KK Goyal","year":"2015","unstructured":"Goyal, K.K., Jain, P.K.: Design of reconfigurable flow lines using MOPSO and maximum deviation theory. Int. J. Adv. Manufac. Technol. 84, 1587\u20131600 (2015)","journal-title":"Int. J. Adv. Manufac. Technol."},{"issue":"8","key":"5_CR12","doi-asserted-by":"publisher","first-page":"2531","DOI":"10.1080\/00207543.2018.1522006","volume":"57","author":"FA Touzout","year":"2018","unstructured":"Touzout, F.A., Benyoucef, L.: Multi-objective sustainable process plan generation in a reconfigurable manufacturing environment: exact and adapted evolutionary approaches. Int. J. Prod. Res. 57(8), 2531\u20132547 (2018)","journal-title":"Int. J. Prod. Res."},{"issue":"5","key":"5_CR13","doi-asserted-by":"publisher","first-page":"1368","DOI":"10.1080\/00207543.2016.1213451","volume":"55","author":"O Batta\u00efa","year":"2017","unstructured":"Batta\u00efa, O., Dolgui, A., Guschinsky, N.: Decision support for design of reconfigurable rotary machining systems for family part production. Int. J. Prod. Res. 55(5), 1368\u20131385 (2017)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"5_CR14","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1080\/0951192X.2018.1550673","volume":"32","author":"LN Pattanaik","year":"2018","unstructured":"Pattanaik, L.N., Jena, A.: Tri-objective optimisation of mixed model reconfigurable assembly system for modular products. Int. J. Comput. Integr. Manuf. 32(1), 72\u201382 (2018)","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"5_CR15","doi-asserted-by":"crossref","unstructured":"Dou, J., Su, C., Zhao, X.: Mixed integer programming models for concurrent configuration design and scheduling in a reconfigurable manufacturing system. Concurr. Eng. Res. Appl. 28(1), 32\u201346 (2020)","DOI":"10.1177\/1063293X19898727"},{"issue":"2","key":"5_CR16","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1016\/j.jmsy.2011.08.006","volume":"31","author":"K Mpofu","year":"2012","unstructured":"Mpofu, K., Tlale, N.S.: Multi-level decision making in reconfigurable machining systems using fuzzy logic. J. Manuf. Syst. 31(2), 103\u2013112 (2012)","journal-title":"J. Manuf. Syst."},{"issue":"4","key":"5_CR17","doi-asserted-by":"publisher","first-page":"379","DOI":"10.1080\/0951192X.2014.902106","volume":"28","author":"Y-C Choi","year":"2015","unstructured":"Choi, Y.-C., Xirouchakis, P.: A holistic production planning approach in a reconfigurable manufacturing system with energy consumption and environmental effects. Int. J. Comput. Integr. Manuf. 28(4), 379\u2013394 (2015)","journal-title":"Int. J. Comput. Integr. Manuf."},{"issue":"12","key":"5_CR18","doi-asserted-by":"publisher","first-page":"3359","DOI":"10.1080\/00207543.2011.578161","volume":"50","author":"LK Saxena","year":"2012","unstructured":"Saxena, L.K., Jain, P.K.: A model and optimisation approach for reconfigurable manufacturing system configuration design. Int. J. Prod. Res. 50(12), 3359\u20133381 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"5_CR19","first-page":"363","volume":"27","author":"KK Mittal","year":"2017","unstructured":"Mittal, K.K., Jain, P.K., Kumar, D.: Configuration selection in reconfigurable manufacturing system based on reconfigurability. Int. J. Logist. Syst. Manage. 27(3), 363\u2013379 (2017)","journal-title":"Int. J. Logist. Syst. Manage."},{"issue":"6","key":"5_CR20","doi-asserted-by":"publisher","first-page":"1058","DOI":"10.1108\/03684921011046834","volume":"39","author":"C Lv","year":"2010","unstructured":"Lv, C., Li, A.P., Xu, L.Y.: Research and optimization of reconfigurable manufacturing system configuration based on system reliability. Int. J. Cybern. Syst. Manage. Sci. 39(6), 1058\u20131065 (2010)","journal-title":"Int. J. Cybern. Syst. Manage. Sci."},{"issue":"12","key":"5_CR21","doi-asserted-by":"publisher","first-page":"1635","DOI":"10.1057\/jors.2012.9","volume":"63","author":"JM Yu","year":"2012","unstructured":"Yu, J.M., Doh, H.H., Kim, H.W., Kim, J.S., Lee, D.H., Nam, S.H.: Iterative algorithms for part grouping and loading in cellular reconfigurable manufacturing systems. J. Oper. Res. Soc. 63(12), 1635\u20131644 (2012)","journal-title":"J. Oper. Res. Soc."},{"issue":"7","key":"5_CR22","doi-asserted-by":"publisher","first-page":"2275","DOI":"10.1080\/00207543.2021.1886369","volume":"60","author":"SR Campos","year":"2022","unstructured":"Campos, S.R., Daaboul, J., Le Duigou, J.: Concurrent optimisation of modular product and Reconfigurable Manufacturing System configuration: a customer-oriented offer for mass customisation. Int. J. Prod. Res. 60(7), 2275\u20132291 (2022)","journal-title":"Int. J. Prod. Res."},{"key":"5_CR23","doi-asserted-by":"publisher","first-page":"729","DOI":"10.1007\/s00170-017-0803-2","volume":"94","author":"HH Benderbal","year":"2017","unstructured":"Benderbal, H.H., Dahane, M., Benyoucef, L.: Modularity assessment in Reconfigurable Manufacturing System (RMS) design: an archived multi-objective simulated annealing-based approach. Int. J. Adv. Manufac. Technol. 94, 729\u2013749 (2017)","journal-title":"Int. J. Adv. Manufac. Technol."},{"issue":"15","key":"5_CR24","doi-asserted-by":"publisher","first-page":"4175","DOI":"10.1080\/00207543.2011.599345","volume":"50","author":"KK Goyal","year":"2012","unstructured":"Goyal, K.K., Jain, P.K., Jain, M.: Optimal configuration selection for reconfigurable manufacturing system using NSGA II and TOPSIS. Int. J. Prod. Res. 50(15), 4175\u20134191 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"7","key":"5_CR25","doi-asserted-by":"publisher","first-page":"1930","DOI":"10.1080\/00207543.2016.1229066","volume":"55","author":"MR Abdi","year":"2016","unstructured":"Abdi, M.R., Labib, A.: RMS capacity utilization: product family and supply chain. Int. J. Prod. Res. 55(7), 1930\u20131956 (2016)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"5_CR26","doi-asserted-by":"publisher","first-page":"725","DOI":"10.1016\/j.rcim.2010.04.005","volume":"26","author":"LJ Zeballos","year":"2010","unstructured":"Zeballos, L.J.: A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems. Robot. Comput.-Integrat. Manufac. 26(6), 725\u2013743 (2010)","journal-title":"Robot. Comput.-Integrat. Manufac."},{"issue":"5","key":"5_CR27","doi-asserted-by":"publisher","first-page":"2286","DOI":"10.1016\/j.eswa.2013.09.026","volume":"41","author":"JM Novas","year":"2014","unstructured":"Novas, J.M., Henning, G.P.: Integrated scheduling of resource-constrained flexible manufacturing systems using constraint programming. Expert Syst. Appl. 41(5), 2286\u20132299 (2014)","journal-title":"Expert Syst. Appl."},{"key":"5_CR28","doi-asserted-by":"publisher","first-page":"435","DOI":"10.1016\/j.apm.2023.06.009","volume":"122","author":"Y Zhang","year":"2023","unstructured":"Zhang, Y., Zhang, Z., Zeng, Y., Wu, T.: Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations. Appl. Math. Model. 122, 435\u2013455 (2023)","journal-title":"Appl. Math. Model."},{"key":"5_CR29","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2022.105915","volume":"146","author":"D Kizilay","year":"2022","unstructured":"Kizilay, D.: A novel constraint programming and simulated annealing for disassembly line balancing problem with AND\/OR precedence and sequence dependent setup times. Comput. Oper. Res. 146, 105915 (2022)","journal-title":"Comput. Oper. Res."},{"key":"5_CR30","doi-asserted-by":"publisher","first-page":"946","DOI":"10.1016\/j.procs.2023.03.130","volume":"122","author":"F Yuraszeck","year":"2023","unstructured":"Yuraszeck, F., Mej\u00eda, G., Canut-de-Bon, D.: A competitive constraint programming approach for the group shop scheduling problem. Procedia Comput. Sci. 122, 946\u2013951 (2023)","journal-title":"Procedia Comput. Sci."},{"key":"5_CR31","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2022.102770","volume":"115","author":"S Fatemi-Anaraki","year":"2023","unstructured":"Fatemi-Anaraki, S., Tavakkoli-Moghaddam, R., Foumani, M., Vahedi-Nouri, B.: Scheduling of multi-robot job shop systems in dynamic environments: mixed-integer linear programming and constraint programming approaches. Omega 115, 102770 (2023)","journal-title":"Omega"},{"key":"5_CR32","volume":"9","author":"G Da Col","year":"2022","unstructured":"Da Col, G., Teppan, E.C.: Industrial-size job shop scheduling with constraint programming. Oper. Res. Perspect. 9, 100249 (2022)","journal-title":"Oper. Res. Perspect."},{"issue":"3","key":"5_CR33","doi-asserted-by":"publisher","first-page":"874","DOI":"10.1016\/j.ejor.2022.01.034","volume":"302","author":"D M\u00fcller","year":"2022","unstructured":"M\u00fcller, D., M\u00fcller, M.G., Kress, D., Pesch, E.: An algorithm selection approach for the flexible job shop scheduling problem: Choosing constraint programming solvers through machine learning. Eur. J. Oper. Res. 302(3), 874\u2013891 (2022)","journal-title":"Eur. J. Oper. Res."},{"key":"5_CR34","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2022.108586","volume":"172","author":"V Heinz","year":"2022","unstructured":"Heinz, V., Nov\u00e1k, A., Vlk, M., Hanz\u00e1lek, Z.: Constraint Programming and constructive heuristics for parallel machine scheduling with sequence-dependent setups and common servers. Comput. Ind. Eng. 172, 108586 (2022)","journal-title":"Comput. Ind. Eng."},{"key":"5_CR35","doi-asserted-by":"crossref","unstructured":"Allibe, M., Sylla, A., Alpan, G.: A generic knowledge model for resource reconfiguration in the context of reconfigurable manufacturing systems. In: Proceedings of the 26th ACM International Systems and Software Product Line Conference, pp. 217\u2013223. Association for Computing Machinery, Graz, Austria (2022)","DOI":"10.1145\/3503229.3547040"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-71637-9_5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T21:03:31Z","timestamp":1725743011000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-71637-9_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"ISBN":["9783031716362","9783031716379"],"references-count":35,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-71637-9_5","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"8 September 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chemnitz","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2024","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 September 2024","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 September 2024","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"43","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2024","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}