{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T03:45:44Z","timestamp":1742960744704,"version":"3.40.3"},"publisher-location":"Cham","reference-count":33,"publisher":"Springer Nature Switzerland","isbn-type":[{"type":"print","value":"9783031716447"},{"type":"electronic","value":"9783031716454"}],"license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-3-031-71645-4_18","type":"book-chapter","created":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T21:02:18Z","timestamp":1725742938000},"page":"258-273","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Makespan Minimisation in\u00a0Hybrid Flexible Flowshops with\u00a0Buffers and\u00a0Machine-Dependent Transportation Times"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7487-2512","authenticated-orcid":false,"given":"Stavros","family":"Vatikiotis","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0009-0002-2621-5264","authenticated-orcid":false,"given":"Ilias","family":"Mpourdakos","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0009-0005-8987-1308","authenticated-orcid":false,"given":"Dimitrios","family":"Papathanasiou","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9243-7327","authenticated-orcid":false,"given":"Ioannis","family":"Mourtos","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,9,8]]},"reference":[{"key":"18_CR1","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","volume":"1","author":"JK Lenstra","year":"1977","unstructured":"Lenstra, J.K., Kan, A.R., Brucker, P.: Complexity of machine scheduling problems. Ann. Disc. Math. 1, 343\u2013362 (1977)","journal-title":"Ann. Disc. Math."},{"issue":"3","key":"18_CR2","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/0305-0483(87)90071-5","volume":"15","author":"SK Gupta","year":"1987","unstructured":"Gupta, S.K., Kyparisis, J.: Single machine scheduling research. Omega 15(3), 207\u2013227 (1987)","journal-title":"Omega"},{"issue":"3","key":"18_CR3","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/0377-2217(90)90215-W","volume":"47","author":"TCE Cheng","year":"1990","unstructured":"Cheng, T.C.E., Sin, C.C.S.: A state-of-the-art review of parallel-machine scheduling research. Eur. J. Oper. Res. 47(3), 271\u2013292 (1990)","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"18_CR4","doi-asserted-by":"publisher","first-page":"3237","DOI":"10.1111\/itor.13108","volume":"29","author":"CR M\u00e1rquez","year":"2022","unstructured":"M\u00e1rquez, C.R., Ribeiro, C.C.: Shop scheduling in manufacturing environments: a review. Int. Trans. Oper. Res. 29(6), 3237\u20133293 (2022)","journal-title":"Int. Trans. Oper. Res."},{"issue":"1","key":"18_CR5","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2022.08.009","volume":"309","author":"JS Neufeld","year":"2023","unstructured":"Neufeld, J.S., Schulz, S., Buscher, U.: A systematic review of multi-objective hybrid flow shop scheduling. Eur. J. Oper. Res. 309(1), 1\u201323 (2023)","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107683","volume":"162","author":"X Lian","year":"2021","unstructured":"Lian, X., Zheng, Z., Wang, C., Gao, X.: An energy-efficient hybrid flow shop scheduling problem in steelmaking plants. Comput. Ind. Eng. 162, 107683 (2021)","journal-title":"Comput. Ind. Eng."},{"issue":"15\u201316","key":"18_CR7","doi-asserted-by":"publisher","first-page":"6196","DOI":"10.1016\/j.eswa.2015.03.012","volume":"42","author":"S Jun","year":"2015","unstructured":"Jun, S., Park, J.: A hybrid genetic algorithm for the hybrid flow shop scheduling problem with nighttime work and simultaneous work constraints: A case study from the transformer industry. Expert Syst. Appl. 42(15\u201316), 6196\u20136204 (2015)","journal-title":"Expert Syst. Appl."},{"issue":"17","key":"18_CR8","doi-asserted-by":"publisher","first-page":"5934","DOI":"10.1080\/00207543.2022.2119294","volume":"61","author":"Z Li","year":"2023","unstructured":"Li, Z., Wan, G.: Batching and scheduling in a continuous-discrete hybrid flowshop: Lagrangian relaxation-based heuristic algorithms. Int. J. Prod. Res. 61(17), 5934\u20135955 (2023)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"18_CR9","doi-asserted-by":"publisher","first-page":"9625","DOI":"10.1016\/j.eswa.2008.09.063","volume":"36","author":"B Naderi","year":"2009","unstructured":"Naderi, B., Zandieh, M., Balagh, A.K.G., Roshanaei, V.: An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness. Expert Syst. Appl. 36(6), 9625\u20139633 (2009)","journal-title":"Expert Syst. Appl."},{"issue":"12","key":"18_CR10","doi-asserted-by":"publisher","first-page":"1144","DOI":"10.1080\/0951192X.2013.874576","volume":"27","author":"A Elmi","year":"2014","unstructured":"Elmi, A., Topaloglu, S.: Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot. Int. J. Comput. Integr. Manuf. 27(12), 1144\u20131159 (2014)","journal-title":"Int. J. Comput. Integr. Manuf."},{"issue":"10","key":"18_CR11","doi-asserted-by":"publisher","first-page":"2570","DOI":"10.1080\/00207543.2010.543178","volume":"50","author":"SM Mousavi","year":"2012","unstructured":"Mousavi, S.M., Zandieh, M., Amiri, M.: Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times. Int. J. Prod. Res. 50(10), 2570\u20132591 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"18_CR12","doi-asserted-by":"publisher","first-page":"2721","DOI":"10.1007\/s12351-021-00629-2","volume":"22","author":"M Dabiri","year":"2022","unstructured":"Dabiri, M., Yazdani, M., Naderi, B., Haleh, H.: Modeling and solution methods for hybrid flow shop scheduling problem with job rejection. Oper. Res. Int. J. 22(3), 2721\u20132765 (2022)","journal-title":"Oper. Res. Int. J."},{"key":"18_CR13","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1016\/j.cor.2019.06.009","volume":"111","author":"H \u00d6ztop","year":"2019","unstructured":"\u00d6ztop, H., Tasgetiren, M.F., Eliiyi, D.T., Pan, Q.K.: Metaheuristic algorithms for the hybrid flowshop scheduling problem. Comput. Oper. Res. 111, 177\u2013196 (2019)","journal-title":"Comput. Oper. Res."},{"key":"18_CR14","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/j.matcom.2020.08.019","volume":"180","author":"E Gheisariha","year":"2021","unstructured":"Gheisariha, E., Tavana, M., Jolai, F., Rabiee, M.: A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation. Math. Comput. Simul. 180, 152\u2013178 (2021)","journal-title":"Math. Comput. Simul."},{"issue":"3","key":"18_CR15","first-page":"1853","volume":"28","author":"N Abbaszadeh","year":"2021","unstructured":"Abbaszadeh, N., Asadi-Gangraj, E., Emami, S.: Flexible flow shop scheduling problem to minimize makespan with renewable resources. Scientia Iranica 28(3), 1853\u20131870 (2021)","journal-title":"Scientia Iranica"},{"key":"18_CR16","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2019.07.041","volume":"139","author":"C Lei","year":"2020","unstructured":"Lei, C., Zhao, N., Ye, S., Wu, X.: Memetic algorithm for solving flexible flow-shop scheduling problems with dynamic transport waiting times. Comput. Ind. Eng. 139, 105984 (2020)","journal-title":"Comput. Ind. Eng."},{"issue":"24","key":"18_CR17","doi-asserted-by":"publisher","first-page":"5767","DOI":"10.1016\/j.apm.2014.04.012","volume":"38","author":"B Naderi","year":"2014","unstructured":"Naderi, B., Gohari, S., Yazdani, M.: Hybrid flexible flowshop problems: models and solution methods. Appl. Math. Model. 38(24), 5767\u20135780 (2014)","journal-title":"Appl. Math. Model."},{"key":"18_CR18","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2022.108672","volume":"173","author":"A Amirteimoori","year":"2022","unstructured":"Amirteimoori, A., Mahdavi, I., Solimanpur, M., Ali, S.S., Tirkolaee, E.B.: A parallel hybrid PSO-GA algorithm for the flexible flow-shop scheduling with transportation. Comput. Ind. Eng. 173, 108672 (2022)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"18_CR19","first-page":"137","volume":"14","author":"A Mollaei","year":"2019","unstructured":"Mollaei, A., Mohammadi, M., Naderi, B.: A bi-objective MILP model for blocking hybrid flexible flow shop scheduling problem: robust possibilistic programming approach. Int. J. Manag. Sci. Eng. Manag. 14(2), 137\u2013146 (2019)","journal-title":"Int. J. Manag. Sci. Eng. Manag."},{"key":"18_CR20","unstructured":"Armstrong, E., Garraffa, M., O\u2019Sullivan, B., Simonis, H.: The hybrid flexible flowshop with transportation times. In: 27th International Conference on Principles and Practice of Constraint Programming (CP 2021). Schloss Dagstuhl-Leibniz-Zentrum f\u00fcr Informatik (2021)"},{"key":"18_CR21","first-page":"1","volume-title":"International Conference on Integration of Constraint Programming, Artificial Intelligence, and Operations Research","author":"E Armstrong","year":"2022","unstructured":"Armstrong, E., Garraffa, M., O\u2019Sullivan, B., Simonis, H.: A two-phase hybrid approach for the hybrid flexible flowshop with transportation times. In: Schaus, P. (ed.) International Conference on Integration of Constraint Programming, Artificial Intelligence, and Operations Research, vol. 13292, pp. 1\u201313. Springer, Heidelberg (2022)"},{"key":"18_CR22","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.119200","volume":"213","author":"SL Jiang","year":"2023","unstructured":"Jiang, S.L., Xu, C., Zhang, L., Ma, Y.: A decomposition-based two-stage online scheduling approach and its integrated system in the hybrid flow shop of steel industry. Expert Syst. Appl. 213, 119200 (2023)","journal-title":"Expert Syst. Appl."},{"issue":"4","key":"18_CR23","doi-asserted-by":"publisher","first-page":"982","DOI":"10.1080\/00207543.2020.1712488","volume":"59","author":"HY Zhang","year":"2021","unstructured":"Zhang, H.Y., Xi, S.H., Chen, Q.X., Smith, J.M., Mao, N., Li, X.: Performance analysis of a flexible flow shop with random and state-dependent batch transport. Int. J. Prod. Res. 59(4), 982\u20131002 (2021)","journal-title":"Int. J. Prod. Res."},{"key":"18_CR24","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Kan, A.R.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Disc. Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Disc. Math."},{"key":"18_CR25","doi-asserted-by":"crossref","unstructured":"Naderi, B., Ruiz, R., Roshanaei, V.: Mixed-integer programming vs. constraint programming for shop scheduling problems: new results and outlook. INFORMS J. Comput. 35(4), 817\u2013843 (2023)","DOI":"10.1287\/ijoc.2023.1287"},{"key":"18_CR26","volume-title":"Adaptation in Natural and Artificial Systems","author":"JH Holland","year":"1975","unstructured":"Holland, J.H.: Adaptation in Natural and Artificial Systems. University of Michigan Press, Ann Arbor (1975)"},{"issue":"1\u20132","key":"18_CR27","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1080\/00207543.2023.2275634","volume":"62","author":"I Avgerinos","year":"2024","unstructured":"Avgerinos, I., Mourtos, I., Vatikiotis, S., Zois, G.: Weighted tardiness minimisation for unrelated machines with sequence-dependent and resource-constrained setups. Int. J. Prod. Res. 62(1\u20132), 359\u2013379 (2024)","journal-title":"Int. J. Prod. Res."},{"key":"18_CR28","unstructured":"IBM: IBM ILOG CPLEX 12.7 User\u2019s Manual. IBM ILOG CPLEX Division, Incline Village (2017)"},{"key":"18_CR29","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-58821-6","volume-title":"Pyomo-Optimization Modeling in Python","author":"ML Bynum","year":"2021","unstructured":"Bynum, M.L., et al.: Pyomo-Optimization Modeling in Python, 3rd edn. Springer, Heidelberg (2021). https:\/\/doi.org\/10.1007\/978-3-319-58821-6","edition":"3"},{"key":"18_CR30","unstructured":"Gurobi Optimization, LLC: Gurobi Optimizer Reference Manual (2024)"},{"issue":"7","key":"18_CR31","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1016\/j.ifacol.2016.07.258","volume":"49","author":"M Bauer","year":"2016","unstructured":"Bauer, M., Lucke, M., Johnsson, C., Harjunkoski, I., Schlake, J.C.: KPIs as the interface between scheduling and control. IFAC-PapersOnLine 49(7), 687\u2013692 (2016)","journal-title":"IFAC-PapersOnLine"},{"issue":"3","key":"18_CR32","doi-asserted-by":"publisher","first-page":"666","DOI":"10.1016\/j.ejor.2014.07.033","volume":"240","author":"E Vallada","year":"2015","unstructured":"Vallada, E., Ruiz, R., Framinan, J.M.: New hard benchmark for flowshop scheduling problems minimising makespan. Eur. J. Oper. Res. 240(3), 666\u2013677 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"18_CR33","doi-asserted-by":"publisher","first-page":"501","DOI":"10.1016\/j.ejor.2022.03.045","volume":"305","author":"M Geurtsen","year":"2023","unstructured":"Geurtsen, M., Didden, J.B., Adan, J., Atan, Z., Adan, I.J.B.F.: Production, maintenance and resource scheduling: a review. Eur. J. Oper. Res. 305(2), 501\u2013529 (2023)","journal-title":"Eur. J. Oper. Res."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-71645-4_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T21:10:23Z","timestamp":1725743423000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-71645-4_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"ISBN":["9783031716447","9783031716454"],"references-count":33,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-71645-4_18","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"8 September 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"The authors have no competing interests to declare that are relevant to the content of this article.","order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Disclosure of Interests"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Chemnitz","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Germany","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2024","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 September 2024","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 September 2024","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"43","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2024","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}