{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T11:43:24Z","timestamp":1777635804111,"version":"3.51.4"},"publisher-location":"Cham","reference-count":29,"publisher":"Springer Nature Switzerland","isbn-type":[{"value":"9783031976537","type":"print"},{"value":"9783031976544","type":"electronic"}],"license":[{"start":{"date-parts":[[2025,6,28]],"date-time":"2025-06-28T00:00:00Z","timestamp":1751068800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,6,28]],"date-time":"2025-06-28T00:00:00Z","timestamp":1751068800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2026]]},"DOI":"10.1007\/978-3-031-97654-4_13","type":"book-chapter","created":{"date-parts":[[2025,7,5]],"date-time":"2025-07-05T05:18:08Z","timestamp":1751692688000},"page":"195-213","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Construction Cost Estimate and Building Information Modeling in Renovation Projects Early Design Stages"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8139-3640","authenticated-orcid":false,"given":"Pietro","family":"Bonifaci","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1975-6620","authenticated-orcid":false,"given":"Sergio","family":"Copiello","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0937-9160","authenticated-orcid":false,"given":"Federico","family":"Panarotto","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2025,6,28]]},"reference":[{"key":"13_CR1","volume-title":"Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method","author":"P Duverlie","year":"1999","unstructured":"Duverlie, P., Castelain, J.M.: Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method. (1999)"},{"key":"13_CR2","doi-asserted-by":"publisher","first-page":"246","DOI":"10.1016\/j.cie.2016.06.007","volume":"98","author":"A Salmi","year":"2016","unstructured":"Salmi, A., David, P., Blanco, E., Summers, J.D.: A review of cost estimation models for determining assembly automation level. Comput. Ind. Eng. 98, 246\u2013259 (2016). https:\/\/doi.org\/10.1016\/j.cie.2016.06.007","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"13_CR3","doi-asserted-by":"publisher","first-page":"563","DOI":"10.1115\/1.2137750","volume":"128","author":"A Niazi","year":"2006","unstructured":"Niazi, A., Dai, J.S., Balabani, S., Seneviratne, L.: Product cost estimation: technique classification and methodology review. J. Manuf. Sci. Eng. 128(2), 563\u2013575 (2006). https:\/\/doi.org\/10.1115\/1.2137750","journal-title":"J. Manuf. Sci. Eng."},{"key":"13_CR4","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1061\/9780784413616.048","volume-title":"Computing in Civil and Building Engineering (2014)","author":"S Aram","year":"2014","unstructured":"Aram, S., Eastman, C., Beetz, J.: Qualitative and Quantitative Cost Estimation: A Methodology Analysis. In: Computing in Civil and Building Engineering (2014), pp. 381\u2013389. American Society of Civil Engineers, Reston, VA (2014). https:\/\/doi.org\/10.1061\/9780784413616.048"},{"key":"13_CR5","unstructured":"AACE International: Recommended practice 56R-08. Cost Estimate Classification System-as Applied in Engineering, Procurement, and Construction for the Building and General Construction Industries. TMC Framework: 7.3 - Cost Estimating and Budgeting. Morgantown, WV (2020)"},{"key":"13_CR6","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1108\/IJMPB-01-2015-0008","volume":"9","author":"B Andersen","year":"2016","unstructured":"Andersen, B., Samset, K., Welde, M.: Low estimates \u2013 high stakes: underestimation of costs at the front-end of projects. Int. J. Manag. Proj. Bus. 9, 171\u2013193 (2016). https:\/\/doi.org\/10.1108\/IJMPB-01-2015-0008","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"13_CR7","doi-asserted-by":"publisher","first-page":"591","DOI":"10.1016\/j.sbspro.2014.03.066","volume":"119","author":"A Johansen","year":"2014","unstructured":"Johansen, A., Sandvin, B., Torp, O., \u00d8kland, A.: Uncertainty analysis \u2013 5 challenges with today\u2019s practice. Procedia. Soc. Behav. Sci. 119, 591\u2013600 (2014). https:\/\/doi.org\/10.1016\/j.sbspro.2014.03.066","journal-title":"Procedia. Soc. Behav. Sci."},{"key":"13_CR8","doi-asserted-by":"publisher","first-page":"612","DOI":"10.1080\/01441647.2016.1278285","volume":"37","author":"M Welde","year":"2017","unstructured":"Welde, M., Odeck, J.: Cost escalations in the front-end of projects\u2013empirical evidence from Norwegian road projects. Transp. Rev. 37, 612\u2013630 (2017). https:\/\/doi.org\/10.1080\/01441647.2016.1278285","journal-title":"Transp. Rev."},{"key":"13_CR9","doi-asserted-by":"publisher","first-page":"537","DOI":"10.1108\/JEDT-05-2018-0080","volume":"17","author":"M Mayouf","year":"2019","unstructured":"Mayouf, M., Gerges, M., Cox, S.: 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. J. Eng. Des. Technol. 17, 537\u2013553 (2019). https:\/\/doi.org\/10.1108\/JEDT-05-2018-0080","journal-title":"J. Eng. Des. Technol."},{"key":"13_CR10","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/222\/1\/012003","volume-title":"IOP Conference Series: Earth and Environmental Science","author":"P Mes\u00e1ro\u0161","year":"2019","unstructured":"Mes\u00e1ro\u0161, P., Smetankov\u00e1, J., Mandi\u010d\u00e1k, T.: The fifth dimension of BIM - Implementation survey. In: IOP Conference Series: Earth and Environmental Science. Institute of Physics Publishing (2019). https:\/\/doi.org\/10.1088\/1755-1315\/222\/1\/012003"},{"key":"13_CR11","doi-asserted-by":"publisher","first-page":"9553","DOI":"10.3390\/app12199553","volume":"12","author":"SW Yang","year":"2022","unstructured":"Yang, S.W., Moon, S.W., Jang, H., Choo, S., Kim, S.A.: Parametric method and building information modeling-based cost estimation model for construction cost prediction in architectural planning. Appl. Sci. 12, 9553 (2022). https:\/\/doi.org\/10.3390\/app12199553","journal-title":"Appl. Sci."},{"key":"13_CR12","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1016\/j.autcon.2012.05.008","volume":"27","author":"FKT Cheung","year":"2012","unstructured":"Cheung, F.K.T., Rihan, J., Tah, J., Duce, D., Kurul, E.: Early stage multi-level cost estimation for schematic BIM models. Autom. Constr. 27, 67\u201377 (2012). https:\/\/doi.org\/10.1016\/j.autcon.2012.05.008","journal-title":"Autom. Constr."},{"key":"13_CR13","doi-asserted-by":"publisher","first-page":"1293","DOI":"10.36680\/j.itcon.2024.058","volume":"29","author":"J Cassandro","year":"2024","unstructured":"Cassandro, J., Mirarchi, C., Zanchetta, C., Pavan, A.: Enhancing accuracy in cost estimation: structured cost data integration and model validation. J. Inf. Technolo. Constr. 29, 1293\u20131325 (2024). https:\/\/doi.org\/10.36680\/j.itcon.2024.058","journal-title":"J. Inf. Technolo. Constr."},{"key":"13_CR14","doi-asserted-by":"publisher","first-page":"1214","DOI":"10.1108\/ECAM-04-2019-0222","volume":"28","author":"F Elghaish","year":"2020","unstructured":"Elghaish, F., Abrishami, S., Hosseini, M.R., Abu-Samra, S.: Revolutionising cost structure for integrated project delivery: a BIM-based solution. Eng. Constr. Archit. Manag. 28, 1214\u20131240 (2020). https:\/\/doi.org\/10.1108\/ECAM-04-2019-0222","journal-title":"Eng. Constr. Archit. Manag."},{"key":"13_CR15","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1108\/JFMPC-05-2019-0042","volume":"25","author":"SO Babatunde","year":"2020","unstructured":"Babatunde, S.O., Perera, S., Ekundayo, D., Adeleye, T.E.: An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. J. Financ. Manag. Prop. Constr. 25, 61\u201381 (2020). https:\/\/doi.org\/10.1108\/JFMPC-05-2019-0042","journal-title":"J. Financ. Manag. Prop. Constr."},{"key":"13_CR16","doi-asserted-by":"publisher","first-page":"2828","DOI":"10.1108\/ECAM-01-2020-0027","volume":"28","author":"A Fazeli","year":"2021","unstructured":"Fazeli, A., Dashti, M.S., Jalaei, F., Khanzadi, M.: An integrated BIM-based approach for cost estimation in construction projects. Eng. Constr. Archit. Manag. 28, 2828\u20132854 (2021). https:\/\/doi.org\/10.1108\/ECAM-01-2020-0027","journal-title":"Eng. Constr. Archit. Manag."},{"key":"13_CR17","doi-asserted-by":"publisher","first-page":"105549","DOI":"10.1016\/j.autcon.2024.105549","volume":"165","author":"S Alathamneh","year":"2024","unstructured":"Alathamneh, S., Collins, W., Azhar, S.: BIM-based quantity takeoff: current state and future opportunities. Autom. Constr. 165, 105549 (2024). https:\/\/doi.org\/10.1016\/j.autcon.2024.105549","journal-title":"Autom. Constr."},{"key":"13_CR18","first-page":"535","volume":"19","author":"S Wu","year":"2014","unstructured":"Wu, S., Wood, G., Ginige, K.: A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools. Electron. J. Inf. Technol. Constr. 19, 535\u2013563 (2014)","journal-title":"Electron. J. Inf. Technol. Constr."},{"key":"13_CR19","doi-asserted-by":"publisher","first-page":"185","DOI":"10.30880\/ijscet.2021.12.01.019","volume":"12","author":"TY Ying","year":"2021","unstructured":"Ying, T.Y., Kamal, E.M.: The revolution of quantity surveying profession in building information modelling (Bim) era: The malaysian perspective. Int. J. Sustain. Constr. Eng. Technol. 12, 185\u2013195 (2021). https:\/\/doi.org\/10.30880\/ijscet.2021.12.01.019","journal-title":"Int. J. Sustain. Constr. Eng. Technol."},{"key":"13_CR20","first-page":"62","volume":"6","author":"RB Raja Taihairan","year":"2015","unstructured":"Raja Taihairan, R.B., Ismail, Z.: BIM: Integrating Cost Estimates at Initial\/Design Stage. Int. J. Sustain. Constr. Eng. Technol. 6, 62\u201374 (2015)","journal-title":"Int. J. Sustain. Constr. Eng. Technol."},{"key":"13_CR21","doi-asserted-by":"publisher","DOI":"10.4324\/9781315708867","volume-title":"Cost Studies of Buildings","author":"A Ashworth","year":"2015","unstructured":"Ashworth, A., Perera, S.: Cost Studies of Buildings. Routledge (2015). https:\/\/doi.org\/10.4324\/9781315708867"},{"key":"13_CR22","volume-title":"New rules of measurement NRM 1: Order of cost estimating and cost planning for capital building works, London","author":"Royal Institution of Chartered Surveyors","year":"2021","unstructured":"Royal Institution of Chartered Surveyors: New rules of measurement NRM 1: Order of cost estimating and cost planning for capital building works, London (2021)"},{"key":"13_CR23","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(210)","volume":"124","author":"T Hegazy","year":"1998","unstructured":"Hegazy, T., Ayed, A.: Neural network model for parametric cost estimation of highway projects. J. Constr. Eng. Manag. 124, 210\u2013218 (1998). https:\/\/doi.org\/10.1061\/(ASCE)0733-9364(1998)124:3(210)","journal-title":"J. Constr. Eng. Manag."},{"key":"13_CR24","doi-asserted-by":"publisher","first-page":"33","DOI":"10.2478\/remav-2018-0014","volume":"26","author":"S Copiello","year":"2018","unstructured":"Copiello, S., Bonifaci, P.: Depreciated replacement cost: Improving the method through a variant based on three cornerstones. Real Estate Manag. Valuat. 26, 33\u201347 (2018). https:\/\/doi.org\/10.2478\/remav-2018-0014","journal-title":"Real Estate Manag. Valuat."},{"key":"13_CR25","volume-title":"Prezzi Tipologie Edilizie","author":"Milan Board of Engineers and Architects","year":"2019","unstructured":"Milan Board of Engineers and Architects: Prezzi Tipologie Edilizie. Dei - Tipografia del Genio Civile, Roma (2019)"},{"key":"13_CR26","doi-asserted-by":"publisher","DOI":"10.1002\/9781119287568","volume-title":"BIM Handbook","author":"R Sacks","year":"2018","unstructured":"Sacks, R., Eastman, C., Lee, G., Teicholz, P.: BIM Handbook. Wiley (2018). https:\/\/doi.org\/10.1002\/9781119287568"},{"key":"13_CR27","doi-asserted-by":"publisher","first-page":"104788","DOI":"10.1016\/j.autcon.2023.104788","volume":"149","author":"A Salzano","year":"2023","unstructured":"Salzano, A., Parisi, C.M., Acampa, G., Nicolella, M.: Existing assets maintenance management: Optimizing maintenance procedures and costs through BIM tools. Autom. Constr. 149, 104788 (2023). https:\/\/doi.org\/10.1016\/j.autcon.2023.104788","journal-title":"Autom. Constr."},{"key":"13_CR28","doi-asserted-by":"publisher","first-page":"102925","DOI":"10.1016\/j.autcon.2019.102925","volume":"107","author":"C Cavalliere","year":"2019","unstructured":"Cavalliere, C., Dell\u2019Osso, G.R., Favia, F., Lovicario, M.: BIM-based assessment metrics for the functional flexibility of building designs. Autom. Constr. 107, 102925 (2019). https:\/\/doi.org\/10.1016\/j.autcon.2019.102925","journal-title":"Autom. Constr."},{"key":"13_CR29","volume-title":"Cost Engineering Terminology","author":"AACE International","year":"2024","unstructured":"AACE International: Recommended practice No. 10S-90. In: Cost Engineering Terminology. TMC Framework: General Reference, Morgantown, WV (2024)"}],"container-title":["Lecture Notes in Computer Science","Computational Science and Its Applications \u2013 ICCSA 2025 Workshops"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-97654-4_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T05:32:45Z","timestamp":1777440765000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-97654-4_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,6,28]]},"ISBN":["9783031976537","9783031976544"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-97654-4_13","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,6,28]]},"assertion":[{"value":"28 June 2025","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICCSA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Computational Science and Its Applications","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Istanbul","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"T\u00fcrkiye","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2025","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"30 June 2025","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 July 2025","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"25","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"iccsa2025","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/iccsa.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}