{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,11]],"date-time":"2025-09-11T21:10:53Z","timestamp":1757625053891,"version":"3.44.0"},"publisher-location":"Cham","reference-count":23,"publisher":"Springer Nature Switzerland","isbn-type":[{"type":"print","value":"9783032035417"},{"type":"electronic","value":"9783032035424"}],"license":[{"start":{"date-parts":[[2025,8,27]],"date-time":"2025-08-27T00:00:00Z","timestamp":1756252800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,8,27]],"date-time":"2025-08-27T00:00:00Z","timestamp":1756252800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2026]]},"DOI":"10.1007\/978-3-032-03542-4_13","type":"book-chapter","created":{"date-parts":[[2025,8,26]],"date-time":"2025-08-26T22:04:05Z","timestamp":1756245845000},"page":"185-199","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Concept of Manufacturing Control for a Workstation with Sequence-Dependent Setup Times in a Make-to-Stock Production"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0009-0007-1161-4330","authenticated-orcid":false,"given":"Constantin","family":"Steffens","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1804-5007","authenticated-orcid":false,"given":"Christopher","family":"Mundt","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hermann","family":"L\u00f6dding","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2025,8,27]]},"reference":[{"key":"13_CR1","volume-title":"Theory of Scheduling","author":"RW Conway","year":"1967","unstructured":"Conway, R.W., Maxwell, W.L., Miller, L.W.: Theory of Scheduling. Addison-Wesley, Reading, Mass (1967)"},{"key":"13_CR2","doi-asserted-by":"publisher","DOI":"10.4324\/9781315136479","volume-title":"A Revolution in Manufacturing: The SMED System","author":"S Shingo","year":"2019","unstructured":"Shingo, S.: A Revolution in Manufacturing: The SMED System, 1st edn. Routledge (2019). https:\/\/doi.org\/10.4324\/9781315136479","edition":"1"},{"issue":"1","key":"13_CR3","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/09537287.2020.1822642","volume":"33","author":"F Engehausen","year":"2022","unstructured":"Engehausen, F., L\u00f6dding, H.: Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles. Production Planning & Control 33(1), 1 (2022). https:\/\/doi.org\/10.1080\/09537287.2020.1822642","journal-title":"Production Planning & Control"},{"issue":"22","key":"13_CR4","doi-asserted-by":"publisher","first-page":"6311","DOI":"10.1080\/00207543.2011.631605","volume":"50","author":"H L\u00f6dding","year":"2012","unstructured":"L\u00f6dding, H.: A manufacturing control model. Int. J. Prod. Res. 50(22), 6311\u20136328 (2012). https:\/\/doi.org\/10.1080\/00207543.2011.631605","journal-title":"Int. J. Prod. Res."},{"key":"13_CR5","doi-asserted-by":"publisher","DOI":"10.15480\/882.13487","author":"M Th\u00fcrer","year":"2024","unstructured":"Th\u00fcrer, M., Fernandes, N.O., L\u00f6dding, H., Stevenson, M.: Material flow control in make-to-stock production systems\u202f: an assessment of order generation, order release and production authorization by simulation. Flex. Serv. Manuf. J. (2024). https:\/\/doi.org\/10.15480\/882.13487","journal-title":"Flex. Serv. Manuf. J."},{"key":"13_CR6","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-24458-2","volume-title":"Handbook of Manufacturing Control","author":"L\u00f6dding","year":"2013","unstructured":"L\u00f6dding: Handbook of Manufacturing Control. Springer, Berlin Heidelberg, Berlin, Heidelberg (2013). https:\/\/doi.org\/10.1007\/978-3-642-24458-2"},{"key":"13_CR7","doi-asserted-by":"crossref","unstructured":"Heinemeyer, W.: Planung und Steuerung des logistischen Prozesses mit Fortschrittszahlen [Planning and control of logistical processes with Cumulative Production Figures]. In: Flexible Fertigungssysteme, Wiesbaden: Springer Gabler. Springer Fachmedien Wiesbaden GmbH, pp. 161\u2013188 (1993)","DOI":"10.1007\/978-3-322-89141-9_9"},{"key":"13_CR8","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-65625-9","volume-title":"Handbook Integral Logistics Management: Operations and Supply Chain Management Within and Across Companies","author":"P Sch\u00f6nsleben","year":"2023","unstructured":"Sch\u00f6nsleben, P.: Handbook Integral Logistics Management: Operations and Supply Chain Management Within and Across Companies. Springer, Berlin, Heidelberg (2023). https:\/\/doi.org\/10.1007\/978-3-662-65625-9"},{"key":"13_CR9","doi-asserted-by":"publisher","first-page":"1077","DOI":"10.1016\/j.procir.2025.02.250","volume":"134","author":"C Steffens","year":"2025","unstructured":"Steffens, C., L\u00f6dding, H.: Assessing the impact of cyclical sequencing in make-to-stock production with sequence-dependent setup times. Procedia CIRP 134, 1077 (2025)","journal-title":"Procedia CIRP"},{"key":"13_CR10","unstructured":"Petermann, D.: Modellbasierte Produktionsregelung [model based production control], Als Ms. gedr. In: Fortschritt-Berichte VDI Reihe 20, Rechnerunterst\u00fctzte Verfahren, vol. 193. VDI-Verl, D\u00fcsseldorf (1996)"},{"issue":"20","key":"13_CR11","doi-asserted-by":"publisher","first-page":"5823","DOI":"10.1080\/00207543.2011.629634","volume":"50","author":"CW Pickardt","year":"2012","unstructured":"Pickardt, C.W., Branke, J.: Setup-oriented dispatching rules \u2013 a survey. Int. J. Prod. Res. 50(20), 5823\u20135842 (2012). https:\/\/doi.org\/10.1080\/00207543.2011.629634","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"13_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2010.06.011","volume":"210","author":"EMM Winands","year":"2011","unstructured":"Winands, E.M.M., Adan, I.J.B.F., Van Houtum, G.J.: The stochastic economic lot scheduling problem: a survey. Eur. J. Oper. Res. 210(1), 1\u20139 (2011). https:\/\/doi.org\/10.1016\/j.ejor.2010.06.011","journal-title":"Eur. J. Oper. Res."},{"key":"13_CR13","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1287\/opre.46.3.S98","volume":"46","author":"R Anupindi","year":"1998","unstructured":"Anupindi, R., Tayur, S.R.: Managing stochastic multiproduct systems: model, measures, and analysis. Oper. Res. 46, 98\u2013111 (1998)","journal-title":"Oper. Res."},{"issue":"6","key":"13_CR14","doi-asserted-by":"publisher","first-page":"783","DOI":"10.1287\/mnsc.42.6.783","volume":"42","author":"A Federgruen","year":"1996","unstructured":"Federgruen, A., Katalan, Z.: The stochastic economic lot scheduling problem: cyclical base-stock policies with idle times. Manag. Sci. 42(6), 783\u2013796 (1996). https:\/\/doi.org\/10.1287\/mnsc.42.6.783","journal-title":"Manag. Sci."},{"issue":"12","key":"13_CR15","doi-asserted-by":"publisher","first-page":"1158","DOI":"10.1080\/07408170801967062","volume":"40","author":"SE Grasman","year":"2008","unstructured":"Grasman, S.E., Olsen, T.L., Birge, J.R.: Setting basestock levels in multi-product systems with setups and random yield. IIE Trans. 40(12), 1158\u20131170 (2008). https:\/\/doi.org\/10.1080\/07408170801967062","journal-title":"IIE Trans."},{"issue":"1\u20134","key":"13_CR16","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1023\/B:ANOR.0000011189.48656.14","volume":"125","author":"GN Krieg","year":"2004","unstructured":"Krieg, G.N., Kuhn, H.: Analysis of multi-product Kanban systems with state-dependent setups and lost sales. Ann. Oper. Res. 125(1\u20134), 141\u2013166 (2004). https:\/\/doi.org\/10.1023\/B:ANOR.0000011189.48656.14","journal-title":"Ann. Oper. Res."},{"issue":"3","key":"13_CR17","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1016\/S0925-5273(03)00209-3","volume":"90","author":"SR Smits","year":"2004","unstructured":"Smits, S.R., Wagner, M., de Kok, T.G.: Determination of an order-up-to policy in the stochastic economic lot scheduling model. Int. J. Prod. Econ. 90(3), 377\u2013389 (2004)","journal-title":"Int. J. Prod. Econ."},{"issue":"9","key":"13_CR18","doi-asserted-by":"publisher","first-page":"2091","DOI":"10.1080\/0020754031000087166","volume":"41","author":"TS Vaughan","year":"2003","unstructured":"Vaughan, T.S.: The effect of correlated demand on the cyclical scheduling system. Int. J. Prod. Res. 41(9), 2091\u20132106 (2003). https:\/\/doi.org\/10.1080\/0020754031000087166","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"13_CR19","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1016\/S0925-5273(97)00008-X","volume":"49","author":"H Missbauer","year":"1997","unstructured":"Missbauer, H.: Order release and sequence-dependent setup times. Int. J. Prod. Econ. 49(2), 131\u2013143 (1997). https:\/\/doi.org\/10.1016\/S0925-5273(97)00008-X","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"13_CR20","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1080\/09537287.2022.2076627","volume":"35","author":"R Romero-Silva","year":"2024","unstructured":"Romero-Silva, R., Santos, J., Hurtado-Hern\u00e1ndez, M.: A conceptual framework of the applicability of production scheduling from a contingency theory approach: addressing the theory-practice gap. Prod. Plan. Control 35(3), 262\u2013282 (2024). https:\/\/doi.org\/10.1080\/09537287.2022.2076627","journal-title":"Prod. Plan. Control"},{"key":"13_CR21","unstructured":"L\u00f6dding, H., Fernandes, N.O., Th\u00fcrer, M.: Designing manufacturing control for make-to-stock production \u2013 Improving customer supply and reducing inventory levels. unpublished, 2025"},{"key":"13_CR22","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/09537287.2024.2344066","volume":"36","author":"C Mundt","year":"2024","unstructured":"Mundt, C., L\u00f6dding, H.: Coping with the uncertainties of make-to-order production: a new approach for determining reliable delivery times with the throughput diagram. Prod. Plan. Control 36, 1\u201327 (2024). https:\/\/doi.org\/10.1080\/09537287.2024.2344066","journal-title":"Prod. Plan. Control"},{"key":"13_CR23","doi-asserted-by":"publisher","first-page":"106774","DOI":"10.1016\/j.cie.2020.106774","volume":"149","author":"A Bueno","year":"2020","unstructured":"Bueno, A., Godinho Filho, M., Frank, A.G.: Smart production planning and control in the Industry 4.0 context: a systematic literature review. Comput. Ind. Eng.. Ind. Eng. 149, 106774 (2020). https:\/\/doi.org\/10.1016\/j.cie.2020.106774","journal-title":"Comput. Ind. Eng.. Ind. Eng."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Cyber-Physical-Human Production Systems: Human-AI Collaboration and Beyond"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-032-03542-4_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,9]],"date-time":"2025-09-09T16:38:45Z","timestamp":1757435925000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-032-03542-4_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,8,27]]},"ISBN":["9783032035417","9783032035424"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-032-03542-4_13","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2025,8,27]]},"assertion":[{"value":"27 August 2025","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"The authors have no competing interests to declare that are relevant to the content of this article.","order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Disclosure of Interests"}},{"value":"APMS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"IFIP International Conference on Advances in Production Management Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Kamakura","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Japan","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2025","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"31 August 2025","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"4 September 2025","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"44","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apms2025","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.apms-conference.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}