{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T15:55:08Z","timestamp":1742918108016,"version":"3.40.3"},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319037790"},{"type":"electronic","value":"9783319037806"}],"license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-319-03780-6_7","type":"book-chapter","created":{"date-parts":[[2013,11,21]],"date-time":"2013-11-21T01:13:18Z","timestamp":1384996398000},"page":"72-83","source":"Crossref","is-referenced-by-count":1,"title":["Integrated Job Scheduling with Parallel-Batch Processing and Batch Deliveries"],"prefix":"10.1007","author":[{"given":"Xin","family":"Feng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Feifeng","family":"Zheng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"7_CR1","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1002\/(SICI)1099-1425(199806)1:1<31::AID-JOS4>3.0.CO;2-R","volume":"1","author":"P. Brucker","year":"1998","unstructured":"Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., Van de Velde, S.L.: Scheduling a batching machine. Journal of Scheduling\u00a01, 31\u201354 (1998)","journal-title":"Journal of Scheduling"},{"issue":"9","key":"7_CR2","doi-asserted-by":"publisher","first-page":"2097","DOI":"10.1080\/00207549308956847","volume":"31","author":"V. Chandru","year":"1993","unstructured":"Chandru, V., Lee, C.Y., Uzsoy, R.: Minimizing total completion time on a batch processing machines. International Journal of Production Research\u00a031(9), 2097\u20132122 (1993a)","journal-title":"International Journal of Production Research"},{"issue":"2","key":"7_CR3","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1016\/0167-6377(93)90030-K","volume":"13","author":"V. Chandru","year":"1993","unstructured":"Chandru, V., Lee, C.Y., Uzsoy, R.: Minimizing total completion time on a batch processing machines. Operations Research Letters\u00a013(2), 61\u201365 (1993b)","journal-title":"Operations Research Letters"},{"issue":"1","key":"7_CR4","doi-asserted-by":"publisher","first-page":"130","DOI":"10.1287\/opre.1080.0688","volume":"58","author":"Z.L. Chen","year":"2010","unstructured":"Chen, Z.L.: Integrated production and outbound distribution scheduling: review and extensions. Operation Research\u00a058(1), 130\u2013148 (2010)","journal-title":"Operation Research"},{"issue":"4","key":"7_CR5","doi-asserted-by":"publisher","first-page":"614","DOI":"10.1287\/mnsc.1040.0325","volume":"51","author":"Z.L. Chen","year":"2005","unstructured":"Chen, Z.L., Vairaktarakis, G.L.: Integrated scheduling of production and distribution operations. Management Science\u00a051(4), 614\u2013628 (2005)","journal-title":"Management Science"},{"issue":"2","key":"7_CR6","doi-asserted-by":"publisher","first-page":"277","DOI":"10.1016\/0377-2217(96)00127-0","volume":"94","author":"T.C.E. Cheng","year":"1996","unstructured":"Cheng, T.C.E., Gordon, V.S., Kovalyov, M.Y.: Single machine scheduling with batch deliveries. European Journal of Operational Research\u00a094(2), 277\u2013283 (1996)","journal-title":"European Journal of Operational Research"},{"key":"7_CR7","unstructured":"Gong, H., Tang, L.: A scheduling problem on a single batching machine with batch deliveries. In: Proceedings of the 30th Chinese Control Conference, July 22-24 (2011)"},{"issue":"4","key":"7_CR8","doi-asserted-by":"publisher","first-page":"566","DOI":"10.1287\/opre.51.4.566.16106","volume":"51","author":"N.G. Hall","year":"2003","unstructured":"Hall, N.G., Potts, C.N.: Supply chain scheduling: batching and delivery. Operations Research\u00a051(4), 566\u2013584 (2003)","journal-title":"Operations Research"},{"issue":"6","key":"7_CR9","doi-asserted-by":"publisher","first-page":"874","DOI":"10.1287\/opre.45.6.874","volume":"45","author":"D. Hochbaum","year":"1997","unstructured":"Hochbaum, D., Landy, D.: Scheduling semiconductor burn-in operations to minimize total flowtime. Operation Research\u00a045(6), 874\u2013885 (1997)","journal-title":"Operation Research"},{"issue":"4","key":"7_CR10","doi-asserted-by":"publisher","first-page":"764","DOI":"10.1287\/opre.40.4.764","volume":"40","author":"C.Y. Lee","year":"1992","unstructured":"Lee, C.Y., Uzsoy, R., Martin-Vega, L.A.: Efficient algorithms for scheduling semiconductor burn-in operations. Operation Research\u00a040(4), 764\u2013775 (1992)","journal-title":"Operation Research"},{"issue":"12","key":"7_CR11","doi-asserted-by":"publisher","first-page":"575","DOI":"10.1016\/j.ipl.2011.03.014","volume":"111","author":"S.S. Li","year":"2011","unstructured":"Li, S.S., Yuan, J.J., Fan, B.Q.: Unbounded parallel-batch scheduling with family jobs and delivery coordination. Information Processing Letters\u00a0111(12), 575\u2013582 (2011)","journal-title":"Information Processing Letters"},{"issue":"4","key":"7_CR12","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1142\/S0129054104002637","volume":"15","author":"C.K. Poon","year":"2004","unstructured":"Poon, C.K., Yu, W.: On minimizing total completion time in batch machine scheduling. International Journal of Foundations of Computer Science\u00a015(4), 593\u2013607 (2004)","journal-title":"International Journal of Foundations of Computer Science"},{"issue":"2","key":"7_CR13","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C.N. Potts","year":"2000","unstructured":"Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. European Journal of Operational Research\u00a0120(2), 228\u2013249 (2000)","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"7_CR14","doi-asserted-by":"publisher","first-page":"571","DOI":"10.1002\/nav.20100","volume":"52","author":"G. Pundoor","year":"2005","unstructured":"Pundoor, G., Chen, Z.L.: Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Naval Research Logistics\u00a052(6), 571\u2013589 (2005)","journal-title":"Naval Research Logistics"},{"issue":"10","key":"7_CR15","doi-asserted-by":"publisher","first-page":"3854","DOI":"10.1016\/j.apm.2009.01.002","volume":"33","author":"L. Tang","year":"2009","unstructured":"Tang, L., Gong, H.: The coordination of transportation and batching scheduling. Applied Mathematical Modelling\u00a033(10), 3854\u20133862 (2009)","journal-title":"Applied Mathematical Modelling"},{"issue":"4","key":"7_CR16","doi-asserted-by":"publisher","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S. Webster","year":"1995","unstructured":"Webster, S., Baker, K.R.: Scheduling groups of jobs on a single machine. Operation Research\u00a043(4), 692\u2013703 (1995)","journal-title":"Operation Research"},{"issue":"8","key":"7_CR17","first-page":"735","volume":"32","author":"X. Yang","year":"2000","unstructured":"Yang, X.: Scheduling with generalized batch delivery dates and earliness penalties. IIE Transactions\u00a032(8), 735\u2013741 (2000)","journal-title":"IIE Transactions"}],"container-title":["Lecture Notes in Computer Science","Combinatorial Optimization and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-03780-6_7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,24]],"date-time":"2019-05-24T09:29:57Z","timestamp":1558690197000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-03780-6_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783319037790","9783319037806"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-03780-6_7","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2013]]}}}