{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,10]],"date-time":"2024-09-10T17:08:34Z","timestamp":1725988114920},"publisher-location":"Cham","reference-count":25,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319071237"},{"type":"electronic","value":"9783319071244"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-07124-4_57","type":"book-chapter","created":{"date-parts":[[2018,8,13]],"date-time":"2018-08-13T15:09:59Z","timestamp":1534172999000},"page":"1051-1077","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Maritime Container Terminal Problems"],"prefix":"10.1007","author":[{"given":"Christopher","family":"Exp\u00f3sito-Izquierdo","sequence":"first","affiliation":[]},{"given":"Eduardo","family":"Lalla-Ruiz","sequence":"additional","affiliation":[]},{"given":"Jesica","family":"de Armas","sequence":"additional","affiliation":[]},{"given":"Bel\u00e9n","family":"Meli\u00e1n-Batista","sequence":"additional","affiliation":[]},{"given":"J. Marcos","family":"Moreno-Vega","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,8,14]]},"reference":[{"key":"57_CR1","doi-asserted-by":"crossref","unstructured":"Angeloudis P, Bell MGH (2010) An uncertainty-aware AGV assignment algorithm for automated container terminals. Transp Res E Logist Transp Rev 46(3):354\u2013366","DOI":"10.1016\/j.tre.2009.09.001"},{"key":"57_CR2","doi-asserted-by":"crossref","unstructured":"Bierwirth C, Meisel F (2009) A fast heuristic for quay crane scheduling with interference constraints. J Sched 12(4):345\u2013360","DOI":"10.1007\/s10951-009-0105-0"},{"key":"57_CR3","doi-asserted-by":"crossref","unstructured":"Bierwirth C, Meisel F (2010) A survey of berth allocation and quay crane scheduling problems in container terminals. Eur J Oper Res 202(3):615\u2013627","DOI":"10.1016\/j.ejor.2009.05.031"},{"key":"57_CR4","doi-asserted-by":"crossref","unstructured":"Bish EK, Chen FY, Leong YT, Nelson BL, Ng JWC, Simchi-Levi D (2005) Dispatching vehicles in a mega container terminal. OR Spectr 27(4):491\u2013506","DOI":"10.1007\/s00291-004-0194-2"},{"key":"57_CR5","doi-asserted-by":"crossref","unstructured":"Briskorn D, Drexl A, Hartmann S (2006) Inventory-based dispatching of automated guided vehicles on container terminals. OR Spectr 28(4):611\u2013630","DOI":"10.1007\/s00291-006-0033-8"},{"key":"57_CR6","doi-asserted-by":"crossref","unstructured":"Caserta M, Schwarze S, Vo\u00dfS (2011) Container rehandling at maritime container terminals. In: B\u00f6se JW (ed) Handbook of terminal planning. Volume 49 of operations research\/computer science interfaces series. Springer, New York, pp 247\u2013269","DOI":"10.1007\/978-1-4419-8408-1_13"},{"key":"57_CR7","doi-asserted-by":"crossref","unstructured":"Caserta M, Schwarze S, Vo\u00dfS (2012) A mathematical formulation and complexity considerations for the blocks relocation problem. Eur J Oper Res 219(1):96\u2013104","DOI":"10.1016\/j.ejor.2011.12.039"},{"key":"57_CR8","doi-asserted-by":"crossref","unstructured":"Chen G, Govindan K, Yang Z (2013) Managing truck arrivals with time windows to alleviate gate congestion at container terminals. Int J Prod Econ 141(1):179\u2013188","DOI":"10.1016\/j.ijpe.2012.03.033"},{"key":"57_CR9","doi-asserted-by":"crossref","unstructured":"Cordeau JF, Laporte G, Legato P, Moccia L (2005) Models and tabu search heuristics for the berth-allocation problem. Transp Sci 39(4):526\u2013538","DOI":"10.1287\/trsc.1050.0120"},{"key":"57_CR10","doi-asserted-by":"crossref","unstructured":"Cordeau JF, Gaudioso M, Laporte G, Moccia L (2007) The service allocation problem at the Gioia Tauro maritime terminal. Eur J Oper Res 176(2):1167\u20131184","DOI":"10.1016\/j.ejor.2005.09.004"},{"key":"57_CR11","doi-asserted-by":"crossref","unstructured":"Exp\u00f3sito-Izquierdo C, Meli\u00e1n-Batista B, Moreno-Vega JM (2012) Pre-marshalling problem: heuristic solution method and instances generator. Expert Syst Appl 39(9):8337\u20138349","DOI":"10.1016\/j.eswa.2012.01.187"},{"key":"57_CR12","doi-asserted-by":"crossref","unstructured":"Exp\u00f3sito-Izquierdo C, Gonz\u00e1lez-Velarde JL, Meli\u00e1n-Batista B, Moreno-Vega JM (2013) Hybrid estimation of distribution algorithm for the quay crane scheduling problem. Appl Soft Comput 13(10):4063\u20134076","DOI":"10.1016\/j.asoc.2013.05.006"},{"key":"57_CR13","doi-asserted-by":"crossref","unstructured":"Exp\u00f3sito-Izquierdo C, Lalla-Ruiz E, de Armas J, Meli\u00e1n-Batista B, Moreno-Vega JM (2015) A heuristic algorithm based on an improvement strategy to exploit idle time periods for the stacking problem. Comput Ind Eng 87:410\u2013424","DOI":"10.1016\/j.cie.2015.05.030"},{"key":"57_CR14","doi-asserted-by":"crossref","unstructured":"Exp\u00f3sito-Izquierdo C, Meli\u00e1n-Batista B, Moreno-Vega JM (2015) An exact approach for the blocks relocation problem. Expert Syst Appl 42(17\u201318):6408\u20136422","DOI":"10.1016\/j.eswa.2015.04.021"},{"key":"57_CR15","doi-asserted-by":"crossref","unstructured":"Gharehgozli AH, Yu Y, de Koster R, Udding JT (2014) An exact method for scheduling a yard crane. Eur J Oper Res 235(2):431\u2013447. Maritime Logistics.","DOI":"10.1016\/j.ejor.2013.09.038"},{"key":"57_CR16","unstructured":"Henesey L (2006) Overview of transshipment operations and simulation. In: MedTrade conference, pp 6\u20137"},{"issue":"4","key":"57_CR17","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/S0191-2615(99)00057-0","volume":"35","author":"A Imai","year":"2001","unstructured":"Imai A, Nishimura E, Papadimitriou S (2001) The dynamic berth allocation problem for a container port. Transp Res Part B Methodol 35(4):401\u2013407","journal-title":"Transp Res Part B Methodol"},{"issue":"3","key":"57_CR18","doi-asserted-by":"publisher","first-page":"752","DOI":"10.1016\/S0377-2217(03)00133-4","volume":"156","author":"KH Kim","year":"2004","unstructured":"Kim KH, Park YM (2004) A crane scheduling method for port container terminals. Eur J Oper Res 156(3):752\u2013768","journal-title":"Eur J Oper Res"},{"issue":"2","key":"57_CR19","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1007\/s10732-008-9092-0","volume":"16","author":"JE Korsvik","year":"2010","unstructured":"Korsvik JE, Fagerholt K (2010) A tabu search heuristic for ship routing and scheduling with flexible cargo quantities. J Heuristics 16(2):117\u2013137","journal-title":"J Heuristics"},{"issue":"6","key":"57_CR20","doi-asserted-by":"publisher","first-page":"1132","DOI":"10.1016\/j.engappai.2012.06.001","volume":"25","author":"E Lalla-Ruiz","year":"2012","unstructured":"Lalla-Ruiz E, Meli\u00e1n-Batista B, Moreno-Vega JM (2012) Artificial intelligence hybrid heuristic based on tabu search for the dynamic berth allocation problem. Eng Appl Artif Intell 25(6):1132\u20131141","journal-title":"Eng Appl Artif Intell"},{"issue":"2","key":"57_CR21","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1287\/trsc.1120.0419","volume":"47","author":"F Meisel","year":"2013","unstructured":"Meisel F, Bierwirth C (2013) A framework for integrated berth allocation and crane operations planning in seaport container terminals. Transp Sci 47(2):131\u2013147","journal-title":"Transp Sci"},{"issue":"1","key":"57_CR22","doi-asserted-by":"publisher","first-page":"256","DOI":"10.1016\/j.ejor.2014.05.030","volume":"239","author":"MF Monaco","year":"2014","unstructured":"Monaco MF, Sammarra M, Sorrentino G (2014) The terminal-oriented ship stowage planning problem. Eur J Oper Res 239(1):256\u2013265","journal-title":"Eur J Oper Res"},{"issue":"3","key":"57_CR23","doi-asserted-by":"publisher","first-page":"379","DOI":"10.1111\/j.1475-3995.2011.00831.x","volume":"19","author":"RJ Rei","year":"2012","unstructured":"Rei RJ, Pedroso JP (2012) Heuristic search for the stacking problem. Int Trans Oper Res 19(3):379\u2013395","journal-title":"Int Trans Oper Res"},{"key":"57_CR24","first-page":"386","volume":"2","author":"J Shang","year":"2010","unstructured":"Shang J (2010) A heuristic algorithm for the integrated yard truck scheduling in container terminal with twin 40-foot quay crane. In: 2010 international conference on computer, mechatronics, control and electronic engineering, Piscataway, vol 2, pp 386\u2013389","journal-title":"Piscataway, vol"},{"key":"57_CR25","unstructured":"United Nations Conference on Trade and Development. Review of maritime transport (2014)"}],"container-title":["Handbook of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-07124-4_57","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,22]],"date-time":"2019-10-22T03:22:44Z","timestamp":1571714564000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-07124-4_57"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319071237","9783319071244"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-07124-4_57","relation":{},"subject":[],"published":{"date-parts":[[2018]]}}}