{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,12]],"date-time":"2026-06-12T07:16:13Z","timestamp":1781248573153,"version":"3.54.1"},"publisher-location":"Cham","reference-count":14,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319077666","type":"print"},{"value":"9783319077673","type":"electronic"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-07767-3_4","type":"book-chapter","created":{"date-parts":[[2014,5,14]],"date-time":"2014-05-14T04:27:53Z","timestamp":1400041673000},"page":"34-43","source":"Crossref","is-referenced-by-count":4,"title":["Risk Management in Construction Project Using Agent-Based Simulation"],"prefix":"10.1007","author":[{"given":"Franck","family":"Taillandier","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Patrick","family":"Taillandier","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"4_CR1","unstructured":"Walewski, J., Gibson, E.G.: International Project Risk Assessment: Methods, Procedures, and Critical Factors, Center Construction Industry Studies Report, 31, University of Texas, Austin (2003)"},{"key":"4_CR2","doi-asserted-by":"publisher","first-page":"847","DOI":"10.1016\/S0965-9978(01)00036-9","volume":"32","author":"V. Carr","year":"2001","unstructured":"Carr, V., Tah, J.H.M.: A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. Advances in Engineering Software\u00a032, 847\u2013857 (2001)","journal-title":"Advances in Engineering Software"},{"issue":"7","key":"4_CR3","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1016\/S0965-9978(03)00038-3","volume":"34","author":"C.J. Anumba","year":"2003","unstructured":"Anumba, C.J., Ren, Z., Thorpe, A., Ugwu, O.O., Newnham, L.: Negotiation within a Multiagent System for the Collaborative Design of Light Industrial Buildings. Advances in Engineering Software\u00a034(7), 389\u2013401 (2003)","journal-title":"Advances in Engineering Software"},{"key":"4_CR4","unstructured":"Obonyo, E.A.: APRON: Agent-based Specification and Procurement of Construction Product. PhD Thesis, Loughborough University, UK (2004)"},{"key":"4_CR5","doi-asserted-by":"publisher","first-page":"736","DOI":"10.1016\/j.autcon.2005.01.004","volume":"14","author":"B.H.W. Hadikusumo","year":"2005","unstructured":"Hadikusumo, B.H.W., Petchpong, S., Charoenngam, C.: Construction material procurement using internet-based agent system. Automation in Construction\u00a014, 736\u2013749 (2005)","journal-title":"Automation in Construction"},{"key":"4_CR6","unstructured":"Li, W.: An agent-based negotiation model for the Sourcing of construction suppliers. PhD Thesis, University of Hong Kong (2008)"},{"issue":"3","key":"4_CR7","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/j.autcon.2004.08.010","volume":"14","author":"X.L. Xue","year":"2005","unstructured":"Xue, X.L., Li, X.D., Shen, Q.P., Wang, Y.W.: An agent-based framework for supply chain coordination in construction. Automation in Construction\u00a014(3), 413\u2013430 (2005)","journal-title":"Automation in Construction"},{"issue":"1","key":"4_CR8","doi-asserted-by":"publisher","first-page":"10","DOI":"10.1061\/(ASCE)0887-3801(2003)17:1(10)","volume":"17","author":"K. Kim","year":"2003","unstructured":"Kim, K., Paulson, B.C.: An agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. Journal of Computing in Civil Engineering\u00a017(1), 10\u201318 (2003)","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"3","key":"4_CR9","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1061\/(ASCE)0887-3801(2003)17:3(180)","volume":"17","author":"Z. Ren","year":"2003","unstructured":"Ren, Z., Anumba, C.J., Ugwu, O.O.: Multiagent system for construction claims negotiation. Journal of Computing in Civil Engineering\u00a017(3), 180\u2013188 (2003)","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"6","key":"4_CR10","first-page":"1","volume":"20","author":"E. Rojas","year":"2006","unstructured":"Rojas, E., Mukherjee, A.: A multi-agent framework for general purpose situational simulations in the construction management domain. Journal of Computing in Civil Engineering\u00a020(6), 1\u201312 (2006)","journal-title":"Journal of Computing in Civil Engineering"},{"key":"4_CR11","unstructured":"Kerzner, H.: Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 8th edn. Wiley (2003)"},{"key":"4_CR12","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1007\/978-3-642-44927-7_9","volume-title":"PRIMA 2013: Principles and Practice of Multi-Agent Systems","author":"A. Grignard","year":"2013","unstructured":"Grignard, A., Taillandier, P., Gaudou, B., Vo, D.A., Huynh, N.Q., Drogoul, A.: GAMA 1.6: Advancing the art of complex agent-based modeling and simulation. In: Boella, G., Elkind, E., Savarimuthu, B.T.R., Dignum, F., Purvis, M.K. (eds.) PRIMA 2013. LNCS, vol.\u00a08291, pp. 117\u2013131. Springer, Heidelberg (2013)"},{"key":"4_CR13","unstructured":"Mehdizadeh, R.: Dynamic and multi-perspective risk management of construction projects using tailor-made Risk Breakdown Structures. PhD Thesis, Uni Bordeaux 1, France (2012)"},{"issue":"1","key":"4_CR14","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.ijproman.2013.03.004","volume":"32","author":"A. Taroun","year":"2014","unstructured":"Taroun, A.: Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management\u00a032(1), 101\u2013115 (2014)","journal-title":"International Journal of Project Management"}],"container-title":["Communications in Computer and Information Science","Highlights of Practical Applications of Heterogeneous Multi-Agent Systems. The PAAMS Collection"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-07767-3_4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,21]],"date-time":"2024-10-21T13:04:27Z","timestamp":1729515867000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-07767-3_4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319077666","9783319077673"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-07767-3_4","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014]]}}}