{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,30]],"date-time":"2025-12-30T23:32:44Z","timestamp":1767137564362,"version":"build-2238731810"},"publisher-location":"Cham","reference-count":16,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319091730","type":"print"},{"value":"9783319091747","type":"electronic"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-09174-7_10","type":"book-chapter","created":{"date-parts":[[2014,7,21]],"date-time":"2014-07-21T01:42:05Z","timestamp":1405906925000},"page":"112-124","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Proactive Reactive Scheduling in Resource Constrained Projects with Flexibility and Quality Robustness Requirements"],"prefix":"10.1007","author":[{"given":"Mario","family":"Br\u010di\u0107","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Damir","family":"Kalpi\u0107","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marija","family":"Kati\u0107","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,7,22]]},"reference":[{"key":"10_CR1","unstructured":"Brcic, M., Kalpic, D., Fertalj, K.: Resource constrained project scheduling under uncertainty: a survey. In: Proceedings of the 23rd Central European Conference on Information and Intelligent Systems, pp. 401\u2013409 (2012)"},{"issue":"4","key":"10_CR2","doi-asserted-by":"publisher","first-page":"194","DOI":"10.1287\/mnsc.13.4.B194","volume":"13","author":"AR Klingel","year":"1966","unstructured":"Klingel, A.R.: Bias in PERT project completion time calculations for a real network. Manag. Sci. 13(4), 194\u2013201 (1966)","journal-title":"Manag. Sci."},{"key":"10_CR3","volume-title":"Robust Project Scheduling","author":"E Demeulemeester","year":"2011","unstructured":"Demeulemeester, E., Herroelen, W.: Robust Project Scheduling. Now Publishers, Boston (2011)"},{"issue":"1","key":"10_CR4","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/j.cie.2006.10.002","volume":"52","author":"S Van de Vonder","year":"2007","unstructured":"Van de Vonder, S., Ballestin, F., Demeulemeester, E., Herroelen, W.: Heuristic procedures for reactive project scheduling. Comput. Ind. Eng. 52(1), 11\u201328 (2007)","journal-title":"Comput. Ind. Eng."},{"issue":"7","key":"10_CR5","first-page":"193","volume":"28","author":"RH M\u00f6hring","year":"1984","unstructured":"M\u00f6hring, R.H., Radermacher, F.J., Weiss, G.: Stochastic scheduling problems I general strategies. Z. Oper. Res. 28(7), 193\u2013260 (1984)","journal-title":"Z. Oper. Res."},{"key":"10_CR6","series-title":"Lecture Notes in Economics and Mathematical Systems","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1007\/978-3-642-46534-5_6","volume-title":"Contributions to Operations Research","author":"RH M\u00f6hring","year":"1985","unstructured":"M\u00f6hring, R.H., Radermacher, F.J.: Introduction to stochastic scheduling problems. In: Neumann, P.D.K., Pallaschke, P.D.D. (eds.) Contributions to Operations Research. Lecture Notes in Economics and Mathematical Systems, vol. 240, pp. 72\u2013130. Springer, Heidelberg (1985)"},{"key":"10_CR7","unstructured":"Stork, F.: Stochastic resource-constrained project scheduling. Ph.D. thesis, Technical University at Berlin, Berlin, Germany (2001)"},{"key":"10_CR8","unstructured":"Tai, C.H.C.: A stochastic project scheduling problem with resource constraints. Ph.D. thesis, University of Missouri-Columbia (1997)"},{"issue":"13","key":"10_CR9","doi-asserted-by":"publisher","first-page":"1214","DOI":"10.1002\/rnc.1164","volume":"17","author":"J Choi","year":"2007","unstructured":"Choi, J., Realff, M.J., Lee, J.H.: A Q-learning-based method applied to stochastic resource constrained project scheduling with new project arrivals. Int. J. Robust Nonlinear Control 17(13), 1214\u20131231 (2007)","journal-title":"Int. J. Robust Nonlinear Control"},{"issue":"1","key":"10_CR10","first-page":"453","volume":"32","author":"B Cs\u00e1ji","year":"2008","unstructured":"Cs\u00e1ji, B., Monostori, L.: Adaptive stochastic resource control: a machine learning approach. J. Artif. Intel. Res. 32(1), 453\u2013486 (2008)","journal-title":"J. Artif. Intel. Res."},{"issue":"7","key":"10_CR11","doi-asserted-by":"publisher","first-page":"667","DOI":"10.1080\/07408170490447348","volume":"36","author":"R Leus","year":"2004","unstructured":"Leus, R., Herroelen, W.: Stability and resource allocation in project planning. IIE Trans. 36(7), 667\u2013682 (2004)","journal-title":"IIE Trans."},{"key":"10_CR12","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1007\/978-0-387-33768-5_2","volume-title":"Perspectives in Modern Project Scheduling","author":"S Van de Vonder","year":"2006","unstructured":"Van de Vonder, S., Demeulemeester, E., Leus, R., Herroelen, W.: Proactive-reactive project scheduling trade-offs and procedures. In: Jzefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, vol. 92, pp. 25\u201351. Springer, New York (2006)"},{"issue":"2","key":"10_CR13","doi-asserted-by":"publisher","first-page":"308","DOI":"10.1016\/j.ejor.2011.04.019","volume":"214","author":"F Deblaere","year":"2011","unstructured":"Deblaere, F., Demeulemeester, E., Herroelen, W.: Proactive policies for the stochastic resource-constrained project scheduling problem. Eur. J. Oper. Res. 214(2), 308\u2013316 (2011)","journal-title":"Eur. J. Oper. Res."},{"key":"10_CR14","unstructured":"Lambrechts, O.: Robust project scheduling subject to resource breakdowns. Ph.D. thesis, Faculty of Business and Economics, Katholieke Universiteit Leuven, Leuven, Belgium (2007)"},{"key":"10_CR15","doi-asserted-by":"publisher","DOI":"10.1002\/9780470316887","volume-title":"Markov Decision Processes: Discrete Stochastic Dynamic Programming","author":"ML Puterman","year":"1994","unstructured":"Puterman, M.L.: Markov Decision Processes: Discrete Stochastic Dynamic Programming, 1st edn. Wiley-Interscience, New York (1994)","edition":"1"},{"key":"10_CR16","volume-title":"Dynamic Programming and Optimal Control","author":"DP Bertsekas","year":"2005","unstructured":"Bertsekas, D.P.: Dynamic Programming and Optimal Control, vol. 1, 3rd edn. Athena Scientific, Belmont (2005)","edition":"3"}],"container-title":["Lecture Notes in Computer Science","Combinatorial Optimization"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-09174-7_10","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,12,21]],"date-time":"2023-12-21T21:09:21Z","timestamp":1703192961000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-09174-7_10"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319091730","9783319091747"],"references-count":16,"aliases":["10.1007\/978-3-319-14115-2_10"],"URL":"https:\/\/doi.org\/10.1007\/978-3-319-09174-7_10","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014]]},"assertion":[{"value":"22 July 2014","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}