{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T03:29:52Z","timestamp":1773804592322,"version":"3.50.1"},"publisher-location":"Cham","reference-count":23,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319108308","type":"print"},{"value":"9783319108315","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-10831-5_20","type":"book-chapter","created":{"date-parts":[[2014,9,5]],"date-time":"2014-09-05T15:14:03Z","timestamp":1409930043000},"page":"143-150","source":"Crossref","is-referenced-by-count":11,"title":["A Cooperative System of GIS and BIM for Traffic Planning: A High-Rise Building Case Study"],"prefix":"10.1007","author":[{"given":"Jun","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lei","family":"Hou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Heap-Yih","family":"Chong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xin","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiangyu","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jun","family":"Guo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"20_CR1","unstructured":"Managing Urban Traffic Congestion, \n                  \n                    http:\/\/www.transportstrategygroup.com"},{"issue":"13","key":"20_CR2","doi-asserted-by":"publisher","first-page":"1723","DOI":"10.1016\/0169-7552(96)00012-8","volume":"28","author":"R. Jain","year":"1996","unstructured":"Jain, R.: Congestion Control and Traffic Management in ATM Networks: Recent Advances and a Survey. Computer Networks and ISDN Systems\u00a028(13), 1723\u20131738 (1996)","journal-title":"Computer Networks and ISDN Systems"},{"key":"20_CR3","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1061\/(ASCE)0733-9364(2001)127:4(291)","volume":"127","author":"M.Y. Cheng","year":"2001","unstructured":"Cheng, M.Y., Yang, S.C.: GIS-based Cost Estimates Integrating with Material Layout Planning. Journal of Construction Engineering and Management\u00a0127, 291\u2013299 (2001)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"20_CR4","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1016\/j.autcon.2004.08.011","volume":"14","author":"Z. Ma","year":"2005","unstructured":"Ma, Z., Shen, Q., Zhang, J.: Application of 4D for Dynamic Site Layout and Management of Construction Projects. Automation in Construction\u00a014(3), 369\u2013381 (2005)","journal-title":"Automation in Construction"},{"issue":"4","key":"20_CR5","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1061\/(ASCE)0733-9488(2007)133:4(222)","volume":"133","author":"Y.C. Chiu","year":"2007","unstructured":"Chiu, Y.C., Zhou, X., Hernandez, J.: Evaluating Urban Downtown One-way to Two-way Street Conversion using Multiple Resolution Simulation and Assignment Approach. Journal of Urban Planning and Development\u00a0133(4), 222\u2013232 (2007)","journal-title":"Journal of Urban Planning and Development"},{"issue":"2","key":"20_CR6","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1080\/03081060.2011.554670","volume":"34","author":"B.I. Bustillos","year":"2011","unstructured":"Bustillos, B.I., Shelton, J., Chiu, Y.C.: Urban University Campus Transportation and Parking Planning through a Dynamic Traffic Simulation and Assignment Approach. Transportation Planning and Technology\u00a034(2), 177\u2013197 (2011)","journal-title":"Transportation Planning and Technology"},{"key":"20_CR7","doi-asserted-by":"crossref","unstructured":"Wang, Y., Wang, X., Wang, J., Yung, P., Jun, G.: Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Advances in Civil Engineering (2013)","DOI":"10.1155\/2013\/189105"},{"key":"20_CR8","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1016\/j.autcon.2012.09.010","volume":"33","author":"C.S. Park","year":"2013","unstructured":"Park, C.S., Lee, D.Y., Kwon, O.S., Wang, X.: A Framework for Proactive Construction Defect Management using BIM, Augmented Reality and Ontology-based Data Collection Template. Automation in Construction\u00a033, 61\u201371 (2013)","journal-title":"Automation in Construction"},{"key":"20_CR9","doi-asserted-by":"crossref","unstructured":"Wang, X., Love, P.: BIM+ AR: Onsite Information Sharing and Communication via Advanced Visualization. Paper presented at the 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design (2012)","DOI":"10.1109\/CSCWD.2012.6221920"},{"key":"20_CR10","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1016\/j.autcon.2013.12.003","volume":"40","author":"X. Wang","year":"2013","unstructured":"Wang, X., Truijens, M., Hou, L., Wang, Y., Zhou, Y.: Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry. Automation in Construction\u00a040, 96\u2013105 (2013)","journal-title":"Automation in Construction"},{"key":"20_CR11","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.autcon.2012.10.012","volume":"34","author":"X. Wang","year":"2013","unstructured":"Wang, X., Love, P.E., Kim, M.J., Park, C.-S., Sing, C.P., Hou, L.: A Conceptual Framework for Integrating Building Information Modeling with Augmented Reality. Automation in Construction\u00a034, 37\u201344 (2013)","journal-title":"Automation in Construction"},{"issue":"1","key":"20_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/2213-7459-1-13","volume":"1","author":"I. Kovacic","year":"2013","unstructured":"Kovacic, I., Oberwinter, L., M\u00fcller, C., Achammer, C.: The BIM-sustain Experiment\u2013simulation of BIM-supported Multi-disciplinary Design. Visualization in Engineering\u00a01(1), 1\u201311 (2013)","journal-title":"Visualization in Engineering"},{"issue":"1","key":"20_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/2213-7459-1-10","volume":"1","author":"Z. Zhu","year":"2013","unstructured":"Zhu, Z., Donia, S.: Spatial and Visual Data Fusion for Capturing, Retrieval, and Modeling of As-built Building Geometry and Features. Visualization in Engineering\u00a01(1), 1\u201310 (2013)","journal-title":"Visualization in Engineering"},{"issue":"1","key":"20_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1145\/1048687.1048688","volume":"2","author":"D.H. Shin","year":"2005","unstructured":"Shin, D.H., Dunston, P.S., Wang, X.: View Changes in Mixed Reality-based Collaborative Virtual Environments. ACM Transactions on Applied Perception, Association for Computing Machinery (ACM)\u00a02(1), 1\u201314 (2005)","journal-title":"ACM Transactions on Applied Perception, Association for Computing Machinery (ACM)"},{"issue":"4","key":"20_CR15","doi-asserted-by":"crossref","first-page":"501","DOI":"10.5772\/5677","volume":"4","author":"X. Wang","year":"2007","unstructured":"Wang, X.: Using Augmented Reality to Plan Virtual Construction Worksite. International Journal of Advanced Robotic Systems\u00a04(4), 501\u2013512 (2007)","journal-title":"International Journal of Advanced Robotic Systems"},{"key":"20_CR16","doi-asserted-by":"crossref","unstructured":"Wang, X., Schnabel, M.A.: Mixed Reality in Architecture, Design, and Construction. Springer (2009) ISBN: 978-1-4020-9087-5","DOI":"10.1007\/978-1-4020-9088-2"},{"key":"20_CR17","doi-asserted-by":"publisher","first-page":"2986","DOI":"10.4028\/www.scientific.net\/AMR.671-674.2986","volume":"671","author":"C. Zhang","year":"2013","unstructured":"Zhang, C., Zhao, K., Li, J.Q.: BIM Application Analysis in Transportation Project. Advanced Materials Research\u00a0671, 2986\u20132989 (2013)","journal-title":"Advanced Materials Research"},{"issue":"5","key":"20_CR18","first-page":"28","volume":"263","author":"A. Cho","year":"2009","unstructured":"Cho, A.: Document Building Information Modeling Boosters are Crossing That Bridge. ENR (Engineering News-Record)\u00a0263(5), 28\u201329 (2009)","journal-title":"ENR (Engineering News-Record)"},{"key":"20_CR19","unstructured":"Hammond, R.: BIM Transportation Sector: LiDAR and Mobile Mapping"},{"key":"20_CR20","unstructured":"Berglund, S.: GIS in transport modelling. Royal Institute of Technology, Department of Infrastructure. Report, 2001 (2013)"},{"issue":"1","key":"20_CR21","doi-asserted-by":"publisher","first-page":"54","DOI":"10.1016\/j.jtrangeo.2008.04.010","volume":"17","author":"S. Keshkamat","year":"2009","unstructured":"Keshkamat, S., Looijen, J., Zuidgeest, M.: The Formulation and Evaluation of Transport Route Planning Alternatives: a Spatial Decision Support System for the Via Baltica Project, Poland. Journal of Transport Geography\u00a017(1), 54\u201364 (2009)","journal-title":"Journal of Transport Geography"},{"key":"20_CR22","unstructured":"Maguire, D.J., Goodchiled, M., Rhinds, D.: An Overview and Definition of GIS. In: Geographical Information Systems: Principals and Applications, pp. 9\u201320 (1991)"},{"key":"20_CR23","unstructured":"ESRI Inc. ArcGIS. Redlands (2013)"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-10831-5_20","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,27]],"date-time":"2019-05-27T20:23:31Z","timestamp":1558988611000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-10831-5_20"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319108308","9783319108315"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-10831-5_20","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014]]}}}