{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T14:13:27Z","timestamp":1725804807963},"publisher-location":"Cham","reference-count":14,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319108308"},{"type":"electronic","value":"9783319108315"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-10831-5_41","type":"book-chapter","created":{"date-parts":[[2014,9,5]],"date-time":"2014-09-05T15:14:03Z","timestamp":1409930043000},"page":"286-293","source":"Crossref","is-referenced-by-count":1,"title":["A Steerable GA Method for Block Erection of Shipbuilding in Virtual Environment"],"prefix":"10.1007","author":[{"given":"Jinsong","family":"Bao","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qian","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Aiming","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"5","key":"41_CR1","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1007\/s10951-006-8499-4","volume":"9","author":"I. Aho","year":"2006","unstructured":"Aho, I., M\u00e4kinen, E.: On a parallel machine scheduling problem with precedence constraints. Journal of Scheduling\u00a09(5), 493\u2013495 (2006)","journal-title":"Journal of Scheduling"},{"issue":"1","key":"41_CR2","first-page":"272","volume":"45","author":"P. Alcan","year":"2011","unstructured":"Alcan, P., Ba\u015fl\u0131gil, H.: An application with non-identical parallel machines using genetic algorithm with the help of fuzzy logic. Proceedings of the World Congress on Engineering\u00a045(1), 272\u2013280 (2011)","journal-title":"Proceedings of the World Congress on Engineering"},{"issue":"3","key":"41_CR3","doi-asserted-by":"publisher","first-page":"404","DOI":"10.1007\/s00773-013-0217-2","volume":"18","author":"J.D. Caprace","year":"2013","unstructured":"Caprace, J.D., Petcu, C., Velarde, M., Rigo, P.: Optimization of shipyard space allocation and scheduling using heuristic algorithm. Journals of Marine Science & Technology\u00a018(3), 404\u2013417 (2013)","journal-title":"Journals of Marine Science & Technology"},{"key":"41_CR4","doi-asserted-by":"crossref","unstructured":"Gasior, J., Seredynski, F.: Multi-objective Parallel Machines Scheduling for Fault-Tolerant Cloud Systems. In: ICA3PP(1), pp. 247\u2013256 (2013)","DOI":"10.1007\/978-3-319-03859-9_21"},{"issue":"3","key":"41_CR5","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1007\/s10732-009-9107-5","volume":"16","author":"G.W. Klau","year":"2010","unstructured":"Klau, G.W., Lesh, N., Marks, J., Mitzenmacher, M.: Human-guided search. Journal of Heuristics\u00a016(3), 289\u2013310 (2010)","journal-title":"Journal of Heuristics"},{"key":"41_CR6","doi-asserted-by":"crossref","unstructured":"Klau, G.W., Lesh, N., Marks, J., Mitzenmacher, M., Schafer, G.T.: The HuGS platform: A toolkit for interactive optimization. In: Proceedings of the Working Conference on Advanced Visual Interfaces, pp. 324\u2013330. ACM (May 2002)","DOI":"10.1145\/1556262.1556314"},{"issue":"2","key":"41_CR7","doi-asserted-by":"publisher","first-page":"380","DOI":"10.1016\/S0377-2217(96)00205-6","volume":"97","author":"J.K. Lee","year":"1997","unstructured":"Lee, J.K., Lee, K.J., Park, H.K., Hong, J.S., Lee, J.S.: Developing scheduling systems for Daewoo shipbuilding: DAS project. European Journal of Operational Research\u00a097(2), 380\u2013395 (1997)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"41_CR8","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/S0377-2217(02)00914-1","volume":"156","author":"Y. Lin","year":"2004","unstructured":"Lin, Y., Li, W.: Parallel machine scheduling of machine-dependent jobs with unit-length. European Journal of Operational Research\u00a0156(1), 261\u2013266 (2004)","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"41_CR9","doi-asserted-by":"publisher","first-page":"3016","DOI":"10.1016\/j.cor.2005.11.011","volume":"34","author":"S. Malve","year":"2007","unstructured":"Malve, S., Uzsoy, R.: A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers & Operations Research\u00a034(10), 3016\u20133028 (2007)","journal-title":"Computers & Operations Research"},{"issue":"2","key":"41_CR10","doi-asserted-by":"crossref","first-page":"134","DOI":"10.5957\/jsp.2005.21.2.134","volume":"21","author":"Y. Okumoto","year":"2005","unstructured":"Okumoto, Y., Iseki, R.: Optimization of steel plate cutting sequence using the tabu search method. Journal of ship production\u00a021(2), 134\u2013139 (2005)","journal-title":"Journal of ship production"},{"issue":"3","key":"41_CR11","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/0360-8352(96)00004-6","volume":"30","author":"K. Park","year":"1996","unstructured":"Park, K., Lee, K., Park, S., Kim, S.: Modeling and solving the spatial block scheduling problem in a shipbuilding company. Computers & industrial engineering\u00a030(3), 357\u2013364 (1996)","journal-title":"Computers & industrial engineering"},{"issue":"1","key":"41_CR12","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.ijpe.2004.10.014","volume":"100","author":"G. Ramachandra","year":"2006","unstructured":"Ramachandra, G., Elmaghraby, S.E.: Sequencing precedence-related jobs on two machines to minimize the weighted completion time. International Journal of Production Economics\u00a0100(1), 44\u201358 (2006)","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"41_CR13","doi-asserted-by":"crossref","first-page":"139","DOI":"10.5957\/jsp.2006.22.3.139","volume":"22","author":"R. Varghese","year":"2006","unstructured":"Varghese, R., Yoon, D.Y.: Shipbuilding erection network optimization: a TSP method. Journal of ship production\u00a022(3), 139\u2013146 (2006)","journal-title":"Journal of ship production"},{"key":"41_CR14","doi-asserted-by":"crossref","unstructured":"Yoon, D.Y., Varghese, R.: Looking-forward scheduling approach applied in pre-erection area of a shipyard. Journal of Ship production\u00a023(1), 30\u201335 (2007)","DOI":"10.5957\/jsp.2007.23.1.30"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-10831-5_41","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,4,16]],"date-time":"2022-04-16T11:21:38Z","timestamp":1650108098000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-10831-5_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319108308","9783319108315"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-10831-5_41","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2014]]}}}