{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T21:51:21Z","timestamp":1743112281297,"version":"3.40.3"},"publisher-location":"Cham","reference-count":56,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319108933"},{"type":"electronic","value":"9783319108940"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-10894-0_23","type":"book-chapter","created":{"date-parts":[[2014,8,25]],"date-time":"2014-08-25T04:54:47Z","timestamp":1408942487000},"page":"317-334","source":"Crossref","is-referenced-by-count":2,"title":["A Modern Tool for Modelling and Optimisation of Production in Underground Coal Mine"],"prefix":"10.1007","author":[{"given":"Edyta","family":"Brzychczy","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"23_CR1","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/j.resourpol.2004.01.001","volume":"28","author":"S.A. Abdel Sabour","year":"2002","unstructured":"Abdel Sabour, S.A.: Mine size optimization using marginal analysis. Resources Policy\u00a028, 145\u2013151 (2002)","journal-title":"Resources Policy"},{"issue":"2","key":"23_CR2","first-page":"107","volume":"38","author":"R. Barbaro","year":"1986","unstructured":"Barbaro, R., Ramani, R.: Generalized multiperiod MIP model for production scheduling and processing facilities selection and location. Mining Engineering\u00a038(2), 107\u2013114 (1986)","journal-title":"Mining Engineering"},{"key":"23_CR3","doi-asserted-by":"crossref","unstructured":"Brazil, M., Lee, D.H., Van Leuven, M., Rubinstein, J.H., Thomas, D.A., Wormald, N.C.: Optimising declines in underground mines. Mining Technology: IMM Trans. Sect. A 112(3), A164\u2013A170 (2003)","DOI":"10.1179\/037178403225003546"},{"issue":"1","key":"23_CR4","doi-asserted-by":"publisher","first-page":"40","DOI":"10.1002\/net.20140","volume":"49","author":"M. Brazil","year":"2007","unstructured":"Brazil, M., Thomas, D.A.: Network optimization for the design of underground mines. Networks\u00a049(1), 40\u201350 (2007)","journal-title":"Networks"},{"key":"23_CR5","doi-asserted-by":"crossref","unstructured":"Edyta, B.: A New Solution Supporting the Designing Process of Mining Operations in Underground Coal Mines. In: Drebenstedt, C., Singhal, R. (eds.) Mine Planning and Equipment Selection, pp. 53\u201363. Springer, Heidelberg (2014)","DOI":"10.1007\/978-3-319-02678-7_6"},{"issue":"2","key":"23_CR6","first-page":"161","volume":"56","author":"E. Brzychczy","year":"2011","unstructured":"Brzychczy, E.: The planning optimization system for underground hard coal mines. Archives of Mining Sciences\u00a056(2), 161\u2013178 (2011)","journal-title":"Archives of Mining Sciences"},{"issue":"4","key":"23_CR7","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1287\/inte.31.4.50.9669","volume":"31","author":"W.M. Carlyle","year":"2001","unstructured":"Carlyle, W.M., Eaves, B.C.: Underground planning at Stillwater Mining Company. Interfaces\u00a031(4), 50\u201360 (2001)","journal-title":"Interfaces"},{"issue":"2","key":"23_CR8","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/0167-9031(90)90318-M","volume":"11","author":"E.K.C. Chanda","year":"1990","unstructured":"Chanda, E.K.C.: An application of integer programming and simulation to production planning for a stratiform ore body. Mining Sci. Tech.\u00a011(2), 165\u2013172 (1990)","journal-title":"Mining Sci. Tech."},{"key":"23_CR9","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1007\/978-3-642-28267-6_18","volume-title":"Building a National Distributed e-Infrastructure\u2013PL-Grid","author":"E. Ciepiela","year":"2012","unstructured":"Ciepiela, E., Nowakowski, P., Kocot, J., Har\u0119\u017clak, D., Guba\u0142a, T., Meizner, J., Kasztelnik, M., Barty\u0144ski, T., Malawski, M., Bubak, M.: Managing Entire Lifecycles of e-Science Applications in the GridSpace2 Virtual Laboratory \u2013 From Motivation through Idea to Operable Web-Accessible Environment Built on Top of PL-Grid e-Infrastructure. In: Bubak, M., Szepieniec, T., Wiatr, K. (eds.) PL-Grid 2011. LNCS, vol.\u00a07136, pp. 228\u2013239. Springer, Heidelberg (2012)"},{"key":"23_CR10","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"240","DOI":"10.1007\/978-3-642-28267-6_19","volume-title":"Building a National Distributed e-Infrastructure\u2013PL-Grid","author":"E. Ciepiela","year":"2012","unstructured":"Ciepiela, E., Zaraska, L., Sulka, G.D.: GridSpace2 Virtual Laboratory Case Study: Implementation of Algorithms for Quantitative Analysis of Grain Morphology in Self-assembled Hexagonal Lattices According to the Hillebrand Method. In: Bubak, M., Szepieniec, T., Wiatr, K. (eds.) PL-Grid 2011. LNCS, vol.\u00a07136, pp. 240\u2013251. Springer, Heidelberg (2012)"},{"key":"23_CR11","first-page":"209","volume-title":"Proc. IEEE Internat. Conf. Systems Man, Cybernetics","author":"L.D. Dornetto","year":"1988","unstructured":"Dornetto, L.D.: An adaptive control scheme \u2013 expert system \u2013 that optimizes the operation of a proposed underground coal mining system with applications to shortwall, longwall and room pillar mining systems. In: Proc. IEEE Internat. Conf. Systems Man, Cybernetics, pp. 209\u2013214. International Academic Publishers, Pergamon Press, Beijing (1988)"},{"key":"23_CR12","unstructured":"Epstein, R., Gaete, S., Caro, F., Weintraub, A., Santibanez, P., Catalan, J.: Optimizing long term planning for underground copper mines. In: Proc. Copper 2003-Cobre 2003, 5th Internat. Conf., Santiago, Chile, vol.\u00a0I, pp. 265\u2013279. CIM and the Chilean Institute of Mining (2003)"},{"key":"23_CR13","unstructured":"Fava, L., Millar, D., Maybee, B.: Scenario evaluation through mine schedule optimisation. In: Kuyvenhoven, R., Rubio, E., Smith, M. (eds.) Proceedings of the 2nd International Seminar on Mine Planning, Gecamin, Santiago, Chile, pp. 1\u201310 (2011)"},{"issue":"2","key":"23_CR14","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1016\/j.ejor.2004.03.008","volume":"166","author":"M. Gamache","year":"2005","unstructured":"Gamache, M., Grimard, R., Cohen, P.: A shortest-path algorithm for solving the fleet management problem in underground mines. Eur. J. Oper. Res.\u00a0166(2), 497\u2013506 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"23_CR15","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1179\/174328607X191038","volume":"116","author":"N. Grieco","year":"2007","unstructured":"Grieco, N., Dimitrakopoulos, R.: Managing grade risk in stope design optimization: Probabilistic mathematical programming model and application in sublevel stoping. Mining Techology: IMM Trans. Sect. A\u00a0116(2), 49\u201357 (2007)","journal-title":"Mining Techology: IMM Trans. Sect. A"},{"key":"23_CR16","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1007\/978-3-642-28267-6_17","volume-title":"Building a National Distributed e-Infrastructure\u2013PL-Grid","author":"D. Har\u0119\u017clak","year":"2012","unstructured":"Har\u0119\u017clak, D., Kasztelnik, M., Ciepiela, E., Bubak, M.: Scripting Language Extensions Offered by the GridSpace Experiment Platform. In: Bubak, M., Szepieniec, T., Wiatr, K. (eds.) PL-Grid 2011. LNCS, vol.\u00a07136, pp. 217\u2013227. Springer, Heidelberg (2012)"},{"issue":"4","key":"23_CR17","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1080\/09208119408964782","volume":"8","author":"Y. Huang","year":"1994","unstructured":"Huang, Y., Kumar, U.: Optimizing the number of load-hauldump machines in a\u00a0Swedish mine by using queuing theory \u2013 A case study. Internat. J. Surface Mining Reclamation Environ.\u00a08(4), 171\u2013174 (1994)","journal-title":"Internat. J. Surface Mining Reclamation Environ."},{"key":"23_CR18","first-page":"44","volume-title":"Proc. 24th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.","author":"M. Jawed","year":"1993","unstructured":"Jawed, M.: Optimal production planning in underground coal mines through goal programming: A case study from an Indian mine. In: Elbrond, J., Tang, X. (eds.) Proc. 24th Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., pp. 44\u201350. CIM, Montr\u00e9al (1993)"},{"issue":"2","key":"23_CR19","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1179\/037178404225004940","volume":"113","author":"M. Kumral","year":"2004","unstructured":"Kumral, M.: Optimal location of a mine facility by genetic algorithms. Mining Technology: IMM Trans. Sect. A\u00a0113(2), 83\u201388 (2004)","journal-title":"Mining Technology: IMM Trans. Sect. A"},{"issue":"3","key":"23_CR20","doi-asserted-by":"publisher","first-page":"186","DOI":"10.1016\/j.jlp.2005.04.001","volume":"18","author":"M. Kumral","year":"2005","unstructured":"Kumral, M.: Reliability-based optimisation of a mine production system using genetic algorithms. J. Loss Prevention Process Indust.\u00a018(3), 186\u2013189 (2005)","journal-title":"J. Loss Prevention Process Indust."},{"key":"23_CR21","unstructured":"Lemelin, B., Abdel Sabour, S.A., Poulin, R.: An integrated evaluation system for mine planning under uncertainty. In: Magri, E. (ed.) Proc. 33rd Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., Santiago, pp. 262\u2013269 (2007)"},{"key":"23_CR22","first-page":"115","volume-title":"Proc. 20th Internat. Appl. Comp. Math. Mineral Indust. (APCOM) Sympos. Mining","author":"Z. Li","year":"1987","unstructured":"Li, Z., Topuz, E.: Optimizing design capacity and field dimensions of under-ground coal mines. In: Proc. 20th Internat. Appl. Comp. Math. Mineral Indust (APCOM) Sympos. Mining, vol.\u00a0I, pp. 115\u2013122. SAIMM, Johannesburg (1987)"},{"issue":"873","key":"23_CR23","first-page":"41","volume":"78","author":"Y. Lizotte","year":"1985","unstructured":"Lizotte, Y., Elbrond, J.: Optimal layout of underground mining levels. CIM Bulletin\u00a078(873), 41\u201348 (1985)","journal-title":"CIM Bulletin"},{"issue":"4","key":"23_CR24","first-page":"107","volume":"24","author":"R. Magda","year":"2008","unstructured":"Magda, R., Franik, T.: Planning and design of rational parameters of longwall panels in underground hard coal mines. Mineral Resources Management\u00a024(4), 107\u2013117 (2008)","journal-title":"Mineral Resources Management"},{"issue":"1","key":"23_CR25","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1016\/0925-5273(94)90045-0","volume":"34","author":"R. Magda","year":"1994","unstructured":"Magda, R.: Mathematical model for estimating the economic effectiveness of production process in coal panels and an example of its practical application. Internat. J. Prod. Econom.\u00a034(1), 47\u201355 (1994)","journal-title":"Internat. J. Prod. Econom."},{"issue":"3","key":"23_CR26","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1142\/S0950609800000299","volume":"9","author":"R. McNearny","year":"2000","unstructured":"McNearny, R., Nie, Z.: Simulation of a conveyor belt network at an under-ground coal mine. Mineral Resources Engineering\u00a09(3), 343\u2013355 (2000)","journal-title":"Mineral Resources Engineering"},{"key":"23_CR27","first-page":"109","volume":"19","author":"M. Miladinovic","year":"2011","unstructured":"Miladinovic, M., Cebasek, V., Gojkovic, N.: Computer programs for design and modelling in mining. Underground Mining Engineering\u00a019, 109\u2013124 (2011)","journal-title":"Underground Mining Engineering"},{"key":"23_CR28","first-page":"89","volume":"102","author":"W. Mutagwaba","year":"1993","unstructured":"Mutagwaba, W., Hudson, J.: Use of object-oriented simulation model to assess operating and equipment options for underground mine transport system. Mining Technology: IMM Trans. Sect. A\u00a0102, 89\u201394 (1993)","journal-title":"Mining Technology: IMM Trans. Sect. A"},{"issue":"2","key":"23_CR29","doi-asserted-by":"publisher","first-page":"1205","DOI":"10.1016\/j.ejor.2005.09.008","volume":"176","author":"A. Newman","year":"2007","unstructured":"Newman, A., Kuchta, M.: Using aggregation to optimize long-term production planning at an underground mine. Eur. J. Oper. Res.\u00a0176(2), 1205\u20131218 (2007)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"23_CR30","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1287\/inte.1090.0492","volume":"40","author":"A. Newman","year":"2010","unstructured":"Newman, A., Rubio, E., Caro, R., Weintarub, A., Eurek, K.: A review of operations research in mine planning. Interfaces\u00a040(3), 222\u2013245 (2010)","journal-title":"Interfaces"},{"issue":"1-4","key":"23_CR31","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1023\/A:1018958209290","volume":"95","author":"P.C. Pendharkar","year":"2000","unstructured":"Pendharkar, P.C., Rodger, J.A.: Nonlinear programming and genetic search application for production scheduling in coal mines. Ann. Oper. Res.\u00a095(1-4), 251\u2013267 (2000)","journal-title":"Ann. Oper. Res."},{"key":"23_CR32","unstructured":"P\u0119dziwiatr, T.: OPTiCoalMine calculation service: Source code. ACC Cyfronet AGH, Krak\u00f3w (2014)"},{"key":"23_CR33","unstructured":"Qinglin, C., Stillborg, B., Li, C.: Optimization of underground mining methods using grey theory and neural networks. In: Hennies, W., Ayres da Silva, L., Chaves, A. (eds.) 5th Internat. Sympos. Mine Planning Equipment Selection MPES, pp. 393\u2013398, Sao Paulo (1996)"},{"key":"23_CR34","first-page":"123","volume-title":"Proc 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.","author":"D. Rahal","year":"2003","unstructured":"Rahal, D., Smith, M., Van Hout, G., Von Johannides, A.: The use of mixed integer linear programming for long-term scheduling in block caving mines. In: Camisani-Calzolari, F. (ed.) Proc 31st Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., pp. 123\u2013131. SAIMM, Cape Town (2003)"},{"issue":"2","key":"23_CR35","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1080\/07408170490447339","volume":"37","author":"S.C. Sarin","year":"2005","unstructured":"Sarin, S.C., West-Hansen, J.: The long-term mine production scheduling problem. IIE Trans.\u00a037(2), 109\u2013121 (2005)","journal-title":"IIE Trans."},{"issue":"6","key":"23_CR36","doi-asserted-by":"publisher","first-page":"1015","DOI":"10.1016\/j.ijrmms.2007.11.005","volume":"45","author":"F. Simsir","year":"2008","unstructured":"Simsir, F., Ozfirat, M.K.: Determination of the most effective longwall equipment combination in longwall top coal caving (LTCC) method by simulation modeling. Internat. J. Rock Mech. Mining Sci.\u00a045(6), 1015\u20131023 (2008)","journal-title":"Internat. J. Rock Mech. Mining Sci."},{"key":"23_CR37","first-page":"465","volume-title":"Proc. 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.","author":"M. Smith","year":"2003","unstructured":"Smith, M., Sheppard, I., Karunatillake, G.: Using MIP for strategic life-of-mine planning of the lead\/zinc stream at Mount Isa Mines. In: Camisani-Calzolari, F. (ed.) Proc. 31st Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., pp. 465\u2013474. SAIMM, Cape Town (2003)"},{"issue":"3","key":"23_CR38","first-page":"413","volume":"47","author":"R. Snopkowski","year":"2002","unstructured":"Snopkowski, R.: Longwall output plan considered in probability aspect. Arch. Min. Sci.\u00a047(3), 413\u2013420 (2002)","journal-title":"Arch. Min. Sci."},{"key":"23_CR39","first-page":"614","volume-title":"Proc. 17th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.","author":"E. Topuz","year":"1982","unstructured":"Topuz, E., Breeds, C., Karmis, M., Haycocks, C.: Comparison of two under-ground haulage systems. In: Proc. 17th Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., pp. 614\u2013619. SME, Littleton (1982)"},{"issue":"925","key":"23_CR40","first-page":"48","volume":"82","author":"E. Topuz","year":"1989","unstructured":"Topuz, E., Duan, C.: A survey of operations research applications in the mining industry. CIM Bulletin\u00a082(925), 48\u201350 (1989)","journal-title":"CIM Bulletin"},{"key":"23_CR41","unstructured":"Trout, L.: Underground mine production scheduling using mixed integer programming. In: Proc. 25th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., pp. 395\u2013400. AusIMM (1995)"},{"key":"23_CR42","first-page":"53","volume-title":"Proc. 27th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.","author":"B. Winkler","year":"1998","unstructured":"Winkler, B.: System for quality oriented mine production planning with MOLP. In: Proc. 27th Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., pp. 53\u201359. Royal School of Mines, London (1998)"},{"key":"23_CR43","unstructured":"Yun, Q., Liu, J., Chen, Y., Huang, G.: Optimization of planning and design in underground mines. In: Proc. 22nd Internat. Appl. Comput. Oper. Res. Mineral Indust (APCOM) Sympos., Berlin, pp. 255\u2013260 (1990)"},{"issue":"1","key":"23_CR44","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/S0957-4174(98)00032-3","volume":"16","author":"H. Zhang","year":"1999","unstructured":"Zhang, H., Zhao, G.: CMEOC \u2013 An expert system in the coal mining industry. Expert Systems with Applications\u00a016(1), 73\u201377 (1999)","journal-title":"Expert Systems with Applications"},{"key":"23_CR45","unstructured":"British Petroleum: BP Energy Outlook 2030 (2013)"},{"key":"23_CR46","unstructured":"British Petroleum: Statistical Review of World Energy 2013 (2013)"},{"key":"23_CR47","unstructured":"World Coal Association: Coal Facts 2012 (2013)"},{"key":"23_CR48","unstructured":"Bentley Systems Inc., \n                  \n                    http:\/\/www.bentley.com"},{"key":"23_CR49","unstructured":"CAE Datamine International Ltd., \n                  \n                    http:\/\/www.cae.com"},{"key":"23_CR50","unstructured":"Dassault Syst\u00e9mes GEOVIA Ltd., \n                  \n                    http:\/\/www.gemcomsoftware.com"},{"key":"23_CR51","unstructured":"Maptec Pty Ltd., \n                  \n                    http:\/\/www.maptek.com"},{"key":"23_CR52","unstructured":"Micromine, \n                  \n                    http:\/\/www.micromine.com"},{"key":"23_CR53","unstructured":"Minemax, \n                  \n                    http:\/\/www.minemax.com"},{"key":"23_CR54","unstructured":"Mintec Inc., \n                  \n                    http:\/\/www.minesight.com"},{"key":"23_CR55","unstructured":"RockWare Inc., \n                  \n                    http:\/\/www.rockware.com"},{"key":"23_CR56","unstructured":"Teberia Magazine, \n                  \n                    http:\/\/www.teberia.pl"}],"container-title":["Lecture Notes in Computer Science","eScience on Distributed Computing Infrastructure"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-10894-0_23","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,27]],"date-time":"2019-05-27T13:32:34Z","timestamp":1558963954000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-10894-0_23"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319108933","9783319108940"],"references-count":56,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-10894-0_23","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2014]]}}}