{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,4]],"date-time":"2025-05-04T20:10:08Z","timestamp":1746389408496,"version":"3.40.4"},"publisher-location":"Cham","reference-count":32,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319114200"},{"type":"electronic","value":"9783319114217"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-319-11421-7_9","type":"book-chapter","created":{"date-parts":[[2014,9,24]],"date-time":"2014-09-24T06:09:06Z","timestamp":1411538946000},"page":"132-150","source":"Crossref","is-referenced-by-count":5,"title":["Strategic Decision Support for Airside Operations at Commercial Airports"],"prefix":"10.1007","author":[{"given":"L. Douglas","family":"Smith","sequence":"first","affiliation":[]},{"given":"Jan F.","family":"Ehmke","sequence":"additional","affiliation":[]},{"given":"Dirk C.","family":"Mattfeld","sequence":"additional","affiliation":[]},{"given":"Raimund","family":"Waning","sequence":"additional","affiliation":[]},{"given":"Laura","family":"Hellmann","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"2","key":"9_CR1","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi, A., Gupta, J.N.D., Aldowaisan, T.: A review of scheduling research involving setup considerations. Omega\u00a027(2), 219\u2013239 (1999)","journal-title":"Omega"},{"issue":"3","key":"9_CR2","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C.T., Cheng, T.C.E., Kovalyov, M.Y.: A survey of scheduling prob-lems with setup times or costs. European Journal of Operational Research\u00a0187(3), 985\u20131032 (2008)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"9_CR3","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1007\/s12469-009-0011-z","volume":"1","author":"J.A.D. Atkin","year":"2009","unstructured":"Atkin, J.A.D., Burke, E.K., Greenwood, J.S., Reeson, D.: An examination of take-off scheduling constraints at London Heathrow airport. Public Transport\u00a01(1), 169\u2013187 (2009)","journal-title":"Public Transport"},{"key":"9_CR4","unstructured":"Atkin, J.A.D., Burke, E.K., Ravizza, S.: The airport ground movement problem: past and current research and future directions. In: 4th International Conference on Research in Air Transportation, Budapest, pp. 131\u2013138 (2010)"},{"issue":"4","key":"9_CR5","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1007\/s10951-008-0067-7","volume":"11","author":"E. Balas","year":"2008","unstructured":"Balas, E., Simonetti, N., Vazacopoulas, A.: Job shop scheduling with setup times, dead-lines and precedence constraints. Journal of Scheduling\u00a011(4), 253\u2013262 (2008)","journal-title":"Journal of Scheduling"},{"key":"9_CR6","doi-asserted-by":"crossref","unstructured":"Bazargan, M., Fleming, K., Subramanian, P.: A simulation study to investigate runway capacity using TAAM. In: Y\u00fccesan, E., Chen, C.-H., Snowdon, J.L., Charnes, J.M. (eds.) Proceedings of the 2002 Winter Simulation Conference, vol. 2, pp. 1235\u20131242. IEEE Press (2002)","DOI":"10.1109\/WSC.2002.1166383"},{"key":"9_CR7","unstructured":"Bertino, J., Boyajian, E.: 21st Century fast-time airport and airspace modeling analysis with Simmod. Managing the Skies, 21-23 (2011)"},{"issue":"7","key":"9_CR8","doi-asserted-by":"publisher","first-page":"962","DOI":"10.1057\/palgrave.jors.2602636","volume":"60","author":"A.R. Brentnall","year":"2009","unstructured":"Brentnall, A.R., Cheng, R.C.H.: Some effects of aircraft arrival sequence algorithms. Journal of the Operational Research Society\u00a060(7), 962\u2013972 (2009)","journal-title":"Journal of the Operational Research Society"},{"key":"9_CR9","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1007\/s11066-011-9065-6","volume":"12","author":"B. Bubalo","year":"2011","unstructured":"Bubalo, B., Daduna, J.R.: Airport capacity and demand calculations by simulation \u2013 the case of Berlin-Brandenburg International Airport. Netnomics\u00a012, 161\u2013181 (2011)","journal-title":"Netnomics"},{"key":"9_CR10","doi-asserted-by":"crossref","unstructured":"Capozzi, B., Brinton, M., Churchill, A., Atkins, S.: The metroplex simulation environment. In: IEEE\/AIAA 32nd Digital Avionics Systems Conference (DASC), pp. 1E5-1\u2013IE5-14. IEEE Press, New York (2013)","DOI":"10.1109\/DASC.2013.6712528"},{"key":"9_CR11","unstructured":"Federal Aviation Administration: SIMMOD Reference Manual AOR-200, Office of Op-erations Research, Federal Aviation Administration, Washington, D.C (FAA) (1989), http:\/\/www.tc.faa.gov\/acb300\/how_simmod_works.pdf"},{"key":"9_CR12","doi-asserted-by":"crossref","unstructured":"Fishburn, P.T., Golkar, J., Taafe, K.: Simulation of transportation systems. In: Proceedings of the 1995 Winter Simulation Conference, pp. 51-54. IEEE Press (1995)","DOI":"10.1145\/224401.224418"},{"issue":"8","key":"9_CR13","doi-asserted-by":"publisher","first-page":"895","DOI":"10.1057\/palgrave.jors.2601390","volume":"53","author":"C. Gagn\u00e9","year":"2002","unstructured":"Gagn\u00e9, C., Price, W.L., Gravel, M.: Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times. Journal of the Operational Research Society\u00a053(8), 895\u2013906 (2002)","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"9_CR14","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/S0377-2217(00)00197-1","volume":"133","author":"M. Gendreau","year":"2001","unstructured":"Gendreau, M., Laporte, G., Guimaraes, E.M.: A divide and merge heuristic for the multi-processor scheduling problem with sequence dependent setup times. European Journal of Operational Research\u00a0133(1), 183\u2013189 (2001)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"9_CR15","doi-asserted-by":"publisher","first-page":"144","DOI":"10.1109\/87.251882","volume":"1","author":"E.P. Gilbo","year":"1993","unstructured":"Gilbo, E.P.: Airport capacity \u2013 representation, estimation, optimization. IEEE Transactions on Control Systems Technology\u00a01(3), 144\u2013154 (1993)","journal-title":"IEEE Transactions on Control Systems Technology"},{"key":"9_CR16","unstructured":"Gotteland, J.B., Durand, N., Alliot, J.M., Page, E.: Aircraft ground traffic optimization. In: 4th USA\/Europe Air Traffic Management Seminar, pp. 04\u201307 (2001)"},{"key":"9_CR17","doi-asserted-by":"crossref","unstructured":"Gue, K.R., Kang, K.: Staging queues in material handling and transportation systems. In: Peters, B.A., Smith, J.S., Medeiros, D.J., Rohrer, M.W. (eds.) Proceedings of the 2001 Winter Simulation Conference, vol.\u00a02, pp. 1104\u20131108. IEEE Press (2001)","DOI":"10.1109\/WSC.2001.977421"},{"issue":"1","key":"9_CR18","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/j.cie.2011.09.002","volume":"62","author":"C. Guo","year":"2012","unstructured":"Guo, C., Zhibin, J., Zhang, H., Li, N.: Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system. Computers & In-dustrial Engineering\u00a062(1), 141\u2013151 (2012)","journal-title":"Computers & In-dustrial Engineering"},{"issue":"2","key":"9_CR19","doi-asserted-by":"publisher","first-page":"722","DOI":"10.1016\/j.ejor.2005.05.018","volume":"175","author":"S.R. Gupta","year":"2006","unstructured":"Gupta, S.R., Smith, J.S.: Algorithms for single machine total tardiness scheduling with sequence dependent setups. European Journal of Operational Research\u00a0175(2), 722\u2013739 (2006)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"9_CR20","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1007\/s10791-005-6618-z","volume":"22","author":"J.G. Herrero","year":"2005","unstructured":"Herrero, J.G., Berlanga, A., Molina, J.M., Casar, J.R.: Methods for operations planning in airport decision support systems. Applied Intelligence\u00a022(3), 183\u2013206 (2005)","journal-title":"Applied Intelligence"},{"issue":"3","key":"9_CR21","doi-asserted-by":"publisher","first-page":"266","DOI":"10.1108\/00022660110390677","volume":"73","author":"T. Horstmeier","year":"2001","unstructured":"Horstmeier, T., de Haan, F.: Influence of ground handling on turn round time of new large aircraft. Aircraft Engineering and Aerospace Technology\u00a073(3), 266\u2013270 (2001)","journal-title":"Aircraft Engineering and Aerospace Technology"},{"issue":"3","key":"9_CR22","doi-asserted-by":"publisher","first-page":"933","DOI":"10.2514\/1.57850","volume":"37","author":"H. Khadilkar","year":"2013","unstructured":"Khadilkar, H., Balakrishnan, H.: Network congestion control of airport surface operations. Journal of Guidance, Control and Dynamics\u00a037(3), 933\u2013940 (2013)","journal-title":"Journal of Guidance, Control and Dynamics"},{"key":"9_CR23","unstructured":"Norin, A., Granberg, T.A., Varbrand, P., Yuan, D.: Integrating optimization and simula-tion to gain more efficient airport logistics. In: Eighth USA\/Europe Air Traffic Management Research and Development Seminar (2009)"},{"key":"9_CR24","unstructured":"Odoni, A.R., Bowman, J., Delahaye, D., Deyst, J.J., Feron, E., Hansman, R.J., Khan, K., Kuchar, J.K., Pujet, N., Simpson, R.W.: Existing and required modeling capabilities for evaluating ATM systems and concepts, International Center for Air Transportation, Massachusetts Institute of Technology (1997)"},{"issue":"1\/2","key":"9_CR25","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1016\/S1290-0958(01)90017-6","volume":"3","author":"H. Offerman","year":"2001","unstructured":"Offerman, H.: Simulation to support the airport stakeholder decision-making process. Air and Space Europe\u00a03(1\/2), 60\u201367 (2001)","journal-title":"Air and Space Europe"},{"issue":"1-2","key":"9_CR26","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1007\/s12469-013-0060-1","volume":"4","author":"S. Ravizza","year":"2013","unstructured":"Ravizza, S., Chen, J., Atkin, J.A.D., Burke, E.K., Stewart, P.: The trade-off between taxi time and fuel consumption in airport ground movement. Public Transport\u00a04(1-2), 25\u201340 (2013)","journal-title":"Public Transport"},{"issue":"7","key":"9_CR27","doi-asserted-by":"publisher","first-page":"1049","DOI":"10.1287\/mnsc.38.7.1049","volume":"38","author":"H.D. Sherali","year":"1992","unstructured":"Sherali, H.D., Hobeika, A.G., Trani, A.A., Kim, B.J.: An integrated simulation and dynamic programming approach for determining optimal runway exit locations. Management Science\u00a038(7), 1049\u20131049 (1992)","journal-title":"Management Science"},{"issue":"5","key":"9_CR28","doi-asserted-by":"publisher","first-page":"669","DOI":"10.1016\/j.tre.2011.02.005","volume":"47","author":"L.D. Smith","year":"2011","unstructured":"Smith, L.D., Nauss, R.M., Mattfeld, D.C., Li, J., Ehmke, J.F.: Scheduling operations at system choke points with sequence-dependent delays and processing times. Transportation Research Part E\u00a047(5), 669\u2013691 (2011)","journal-title":"Transportation Research Part E"},{"issue":"4","key":"9_CR29","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1057\/palgrave.jors.2600888","volume":"51","author":"J.L. Snowdon","year":"2000","unstructured":"Snowdon, J.L., MacNair, E., Montevecchi, M., Callery, C.A., El-Taji, S., Miller, S.: IBM journey management library: An Arena system for airport simulations. Journal of the Operational Research Society\u00a051(4), 449\u2013456 (2000)","journal-title":"Journal of the Operational Research Society"},{"key":"9_CR30","doi-asserted-by":"crossref","unstructured":"Wei, G., Siyuan, J.: Simulation study on closely spaced parallel runway analysis using SIMMOD Plus. In: 2010 International Conference on Intelligent Computation Technology and Automation, pp. 344\u2013347. IEEE Press (2010)","DOI":"10.1109\/ICICTA.2010.223"},{"issue":"10","key":"9_CR31","first-page":"885","volume":"36","author":"S. Yan","year":"2002","unstructured":"Yan, S., Shieh, C., Chen, M.: A simulation framework for evaluating airport gate assignments. Transportation Research Part A\u00a036(10), 885\u2013898 (2002)","journal-title":"Transportation Research Part A"},{"issue":"1","key":"9_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.trc.2006.04.001","volume":"14","author":"K.G. Zografos","year":"2006","unstructured":"Zografos, K.G., Madas, M.A.: Development and demonstration for an integrated decision support system for airport performance analysis. Transportation Research Part C\u00a014(1), 1\u201317 (2006)","journal-title":"Transportation Research Part C"}],"container-title":["Lecture Notes in Computer Science","Computational Logistics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-11421-7_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,4]],"date-time":"2025-05-04T19:52:54Z","timestamp":1746388374000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-11421-7_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319114200","9783319114217"],"references-count":32,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-11421-7_9","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2014]]}}}