{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T11:11:28Z","timestamp":1743160288005,"version":"3.40.3"},"publisher-location":"Cham","reference-count":15,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319159935"},{"type":"electronic","value":"9783319159942"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-15994-2_39","type":"book-chapter","created":{"date-parts":[[2015,2,9]],"date-time":"2015-02-09T03:43:21Z","timestamp":1423453401000},"page":"388-396","source":"Crossref","is-referenced-by-count":1,"title":["Requirement Engineering for Emergency Simulations"],"prefix":"10.1007","author":[{"given":"Alena","family":"Oulehlov\u00e1","sequence":"first","affiliation":[]},{"given":"Ji\u0159\u00ed","family":"Barta","sequence":"additional","affiliation":[]},{"given":"Hana","family":"Malachov\u00e1","sequence":"additional","affiliation":[]},{"given":"Ji\u0159\u00ed F.","family":"Urb\u00e1nek","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"unstructured":"European Commission. Acton the identification and designation of European critical infrastructures and the assessment of the need to improve their protection. Council Directive, 2008\/114\/EC","key":"39_CR1"},{"unstructured":"Czech Republic. Act No. 240\/2000 Coll., on Crisis Management and on amendments of certain acts (Crisis Act)","key":"39_CR2"},{"unstructured":"Czech Republic. Act No. 432\/2010 Coll., on Criteria for determining the elements of critical infrastructure","key":"39_CR3"},{"unstructured":"European Commission. Critical Infrastructure Protection - Energy Infrastructure, \n                    \n                      http:\/\/ec.europa.eu\/energy\/infrastructure\/critical_en.htm","key":"39_CR4"},{"unstructured":"Software Engineering Institute. A Framework for Software Product Line Practice, Version 5.0. Carnegie Mellon University, \n                    \n                      http:\/\/www.sei.cmu.edu\/productlines\/frame_report\/req_eng.htm","key":"39_CR5"},{"unstructured":"Sutcliffe, A.G.: Requirements Engineering. In: Soegaard, M., Dam, R.F. (eds.) The Encyclopedia of Human-Computer Interaction, 2nd edn. The Interaction Design Foundation, Aarhus, \n                    \n                      http:\/\/www.interaction-design.org\/encyclopedia\/%20requirements_engineering.html","key":"39_CR6"},{"unstructured":"The Stakeholder Engagement Manual VolumeI: The guide to practitioners\u2019 perspectives on stakeholder engagement, p. 88. Stakeholder Research Associates Canada Inc. (2005), \n                    \n                      http:\/\/www.accountability.org\/images\/content\/2\/0\/207.pdf\n                    \n                    \n                   ISBN 0-9738383-0-2","key":"39_CR7"},{"unstructured":"The Stakeholder Engagement Manual Volume II: The practitioner\u2019s handbook on stake-holder engagement, p. 168. Beacon Press, \n                    \n                      http:\/\/www.accountability.org\/images\/content\/2\/0\/208.pdf\n                    \n                    \n                   ISBN 1901693220","key":"39_CR8"},{"unstructured":"ASME Innovative technologies institute, LLC. All-hazard risk and resilience: Prioritizing Critical Infrastructures Using the RAMCAP Plus Approach, 155. ASME. New York (2009) ISBN 978-0-7918-0287-8.","key":"39_CR9"},{"unstructured":"Bozek, F., Je\u0161onkov\u00e1, L., Dvorak, J., Bozek, A.: General Procedure of Risk Management. Economics and Management\u00a03, 15\u201324 (2012) ISSN1802-3975","key":"39_CR10"},{"unstructured":"Rehak, D., Senovsky, P.: Preference Risk Assessment of Electric Power Critical Infrastructure. Chemical Engineering Transactions\u00a036, 469\u2013474 (2014) ISSN 1974-9791, doi: 10.3303\/CET1436079","key":"39_CR11"},{"unstructured":"Czech Republic. Act No. 174\/2014 Coll., on significant information systemsandtheir underlyingcriteria","key":"39_CR12"},{"unstructured":"Czech Hydrometeorological Institute. Radar net CZRAD, \n                    \n                      http:\/\/www.chmi.cz\/%20files\/portal\/docs\/meteo\/rad\/info_czrad\/","key":"39_CR13"},{"unstructured":"EUMETSAT. Monitoring weather and climate from space, \n                    \n                      http:\/\/www.eumetsat.int\/website\/home\/%20AboutUs\/WhatWeDo\/index.html","key":"39_CR14"},{"unstructured":"Ministry of Economy and Energy. Critical Infrastructure Warning Information Network \u2013 CIWIN, \n                    \n                      http:\/\/www.mi.government.bg\/en\/themes\/critical-infrastructure-warning-informatio%20-network-ciwin-333-300.html","key":"39_CR15"}],"container-title":["IFIP Advances in Information and Communication Technology","Environmental Software Systems. Infrastructures, Services and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-15994-2_39","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T04:56:25Z","timestamp":1559105785000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-15994-2_39"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319159935","9783319159942"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-15994-2_39","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2015]]}}}