{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T19:50:35Z","timestamp":1743105035218,"version":"3.40.3"},"publisher-location":"Cham","reference-count":16,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319180076"},{"type":"electronic","value":"9783319180083"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-18008-3_7","type":"book-chapter","created":{"date-parts":[[2015,4,15]],"date-time":"2015-04-15T07:32:51Z","timestamp":1429083171000},"page":"91-107","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study"],"prefix":"10.1007","author":[{"given":"Christina N.","family":"Burt","sequence":"first","affiliation":[]},{"given":"Nir","family":"Lipovetzky","sequence":"additional","affiliation":[]},{"given":"Adrian R.","family":"Pearce","sequence":"additional","affiliation":[]},{"given":"Peter J.","family":"Stuckey","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,4,16]]},"reference":[{"issue":"3","key":"7_CR1","doi-asserted-by":"publisher","first-page":"534","DOI":"10.1016\/S0377-2217(03)00261-3","volume":"153","author":"R Aggoune","year":"2004","unstructured":"Aggoune, R.: Minimizing the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research 153(3), 534\u2013543 (2004)","journal-title":"European Journal of Operational Research"},{"key":"7_CR2","unstructured":"Bley, A., Boland, N., Froyland, G., Zuckerberg, M.: Solving mixed integer nonlinear programming problems for mine production planning with stockpiling. Tech. rep., University of New South Wales (2012). http:\/\/web.maths.unsw.edu.au\/ froyland\/bbfz.pdf"},{"key":"7_CR3","unstructured":"Burt, C.N., Lipovetzky, N., Pearce, A.R., Stuckey, P.J.: Approximate uni-directional Benders decomposition. In: Proceedings of PlanSOpt-15 Workshop on Planning, Search and Optimization AAAI-15 (2015)"},{"key":"7_CR4","unstructured":"Coal Shovel Clip Art: Accessed: 17\/11\/2014 (2014). gofreedownload.net\/"},{"key":"7_CR5","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1613\/jair.1129","volume":"20","author":"M Fox","year":"2003","unstructured":"Fox, M., Long, D.: PDDL2. 1: An extension to PDDL for expressing temporal planning domains. Journal of Artificial Intelligence Research 20, 61\u2013124 (2003)","journal-title":"Journal of Artificial Intelligence Research"},{"key":"7_CR6","unstructured":"Gecode Team: Gecode: Generic constraint development environment (2006). http:\/\/www.gecode.org"},{"key":"7_CR7","unstructured":"HSL: a collection of Fortran codes for large scale scientific computation (2013). http:\/\/www.hsl.rl.ac.uk"},{"key":"7_CR8","unstructured":"Immersive Technologies: Accessed: 17\/11\/2014 (2014). http:\/\/www.immersivetechnologies.com\/"},{"issue":"4","key":"7_CR9","doi-asserted-by":"publisher","first-page":"1216","DOI":"10.1080\/00207543.2014.951739","volume":"53","author":"R Jamshidi","year":"2015","unstructured":"Jamshidi, R., Esfahani, M.M.S.: Reliability-based maintenance and job scheduling for identical parallel machines. International Journal of Production Research 53(4), 1216\u20131227 (2015)","journal-title":"International Journal of Production Research"},{"key":"7_CR10","unstructured":"Khayat, G.E., Langevin, A., Riopel, D.: Integrated production and material handling scheduling using mathematical programming and constraint programming. In: Proceedings CPAIOR (2003)"},{"issue":"4","key":"7_CR11","doi-asserted-by":"publisher","first-page":"789","DOI":"10.1287\/opre.1060.0301","volume":"54","author":"MA Kubzin","year":"2006","unstructured":"Kubzin, M.A., Strusevich, V.A.: Planning machine maintenance in two-machine shop scheduling. Operations Research 54(4), 789\u2013800 (2006)","journal-title":"Operations Research"},{"key":"7_CR12","doi-asserted-by":"crossref","unstructured":"Lipovetzky, N., Burt, C.N., Pearce, A.R., Stuckey, P.J.: Planning for mining operations with time and resource constraints. In: Proceedings of the Twenty-Fourth International Conference on Automated Planning and Scheduling, ICAPS 2014 (2014)","DOI":"10.1609\/icaps.v24i1.13666"},{"issue":"6","key":"7_CR13","doi-asserted-by":"publisher","first-page":"7169","DOI":"10.1016\/j.eswa.2010.12.043","volume":"38","author":"E Moradi","year":"2011","unstructured":"Moradi, E., Ghoma, S.F., Zandieh, M.: Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Systems with Applications 38(6), 7169\u20137178 (2011)","journal-title":"Expert Systems with Applications"},{"key":"7_CR14","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1007\/978-3-540-74970-7_38","volume-title":"Principles and Practice of Constraint Programming \u2013 CP 2007","author":"N Nethercote","year":"2007","unstructured":"Nethercote, N., Stuckey, P.J., Becket, R., Brand, S., Duck, G.J., Tack, G.R.: MiniZinc: towards a standard CP modelling language. In: Bessi\u00e8re, C. (ed.) CP 2007. LNCS, vol. 4741, pp. 529\u2013543. Springer, Heidelberg (2007)"},{"key":"7_CR15","doi-asserted-by":"publisher","first-page":"830","DOI":"10.1016\/j.cie.2008.03.005","volume":"55","author":"M Sbihi","year":"2008","unstructured":"Sbihi, M., Varnier, C.: Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness. Computers & Industrial Engineering 55, 830\u2013840 (2008)","journal-title":"Computers & Industrial Engineering"},{"key":"7_CR16","first-page":"162","volume":"19","author":"C Ta","year":"2005","unstructured":"Ta, C., Kresta, J., Forbes, J., Marquez, H.: A stochastic optimization approach to mine truck allocation. International Journal of Surface Mining 19, 162\u2013175 (2005)","journal-title":"International Journal of Surface Mining"}],"container-title":["Lecture Notes in Computer Science","Integration of AI and OR Techniques in Constraint Programming"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-18008-3_7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,9]],"date-time":"2023-08-09T13:08:58Z","timestamp":1691586538000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-18008-3_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319180076","9783319180083"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-18008-3_7","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"16 April 2015","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}