{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T13:59:30Z","timestamp":1742997570285,"version":"3.40.3"},"publisher-location":"Cham","reference-count":26,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319181660"},{"type":"electronic","value":"9783319181677"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-18167-7_25","type":"book-chapter","created":{"date-parts":[[2015,5,7]],"date-time":"2015-05-07T04:27:19Z","timestamp":1430972839000},"page":"283-294","source":"Crossref","is-referenced-by-count":1,"title":["Integration of Process Planning and Scheduling with Sequence Dependent Setup Time: A Case Study from Electrical Wires and Power Cable Industry"],"prefix":"10.1007","author":[{"given":"Safwan","family":"Altarazi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Omar","family":"Yasin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"25_CR1","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C.T., Cheng, T.E., Kovalyov, M.Y.: A survey of scheduling problems with setup times or costs. Europ. J. Oper. Res.\u00a0187, 985\u20131032 (2008)","journal-title":"Europ. J. Oper. Res."},{"key":"25_CR2","doi-asserted-by":"publisher","first-page":"1069","DOI":"10.1007\/s00170-010-3129-x","volume":"55","author":"S. Altarazi","year":"2011","unstructured":"Altarazi, S.: An optimization tool for operational tolerances allocation, work in process inventory minimization, and machines assignment in a discrete part manufacturing environment. Int. J. Adv. Manuf. Technol.\u00a055, 1069\u20131078 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR3","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1007\/s00170-011-3488-y","volume":"59","author":"M.R. Amin-Naseri","year":"2012","unstructured":"Amin-Naseri, M.R., Afshari, A.J.: A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints. Int. J. Adv. Manuf. Technol.\u00a059, 273\u2013287 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR4","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1007\/s10845-008-0223-0","volume":"20","author":"A. Baykaso\u011flu","year":"2009","unstructured":"Baykaso\u011flu, A., \u00d6zbak\u0131r, L.: A grammatical optimization approach for integrated process planning and scheduling. J. Intell. Manuf.\u00a020, 211\u2013221 (2009)","journal-title":"J. Intell. Manuf."},{"issue":"1","key":"25_CR5","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1080\/00207549508930142","volume":"33","author":"P. Brandimarte","year":"1995","unstructured":"Brandimarte, P., Calderini, M.: A hierarchical bicriterion approach to integrate process plan selection and job shop scheduling. Int. J. Prod. Res.\u00a033(1), 161\u2013181 (1995)","journal-title":"Int. J. Prod. Res."},{"key":"25_CR6","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1007\/s10696-011-9126-z","volume":"24","author":"J.P. Garcia-Sabater","year":"2012","unstructured":"Garcia-Sabater, J.P., Maheut, J., Garcia-Sabater, J.J.: A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. Flex. Serv. Manuf. J.\u00a024, 171\u2013209 (2012)","journal-title":"Flex. Serv. Manuf. J."},{"key":"25_CR7","doi-asserted-by":"publisher","first-page":"280","DOI":"10.1016\/j.rcim.2007.12.002","volume":"25","author":"Y.W. Guo","year":"2009","unstructured":"Guo, Y.W., Li, W.D., Mileham, A.R., Owen, G.W.: Applications of particle swarm optimization in integrated process planning and scheduling. Robot. Comput.-Integr. Manuf.\u00a025, 280\u2013288 (2009)","journal-title":"Robot. Comput.-Integr. Manuf."},{"key":"25_CR8","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1007\/s00170-013-5469-9","volume":"71","author":"M. Haddadzade","year":"2014","unstructured":"Haddadzade, M., Razfar, M.R., Zarandi, M.F.: Integration of process planning and job shop scheduling with stochastic processing time. Int. J. Adv. Manuf. Technol.\u00a071, 241\u2013252 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR9","doi-asserted-by":"publisher","first-page":"1111","DOI":"10.1007\/s00170-005-0142-6","volume":"30","author":"A. Jain","year":"2006","unstructured":"Jain, A., Jain, P.K., Singh, I.P.: An integrated scheme for process planning and scheduling in FMS. Int. J. Adv. Manuf. Technol.\u00a030, 1111\u20131118 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR10","doi-asserted-by":"publisher","first-page":"589","DOI":"10.1016\/S0924-0136(03)00516-8","volume":"139","author":"M. Kang","year":"2003","unstructured":"Kang, M., Han, J., Moon, J.G.: An approach for interlinking design and process planning. J. Mater. Process. Technol.\u00a0139, 589\u2013595 (2003)","journal-title":"J. Mater. Process. Technol."},{"key":"25_CR11","doi-asserted-by":"publisher","first-page":"1151","DOI":"10.1016\/S0305-0548(02)00063-1","volume":"30","author":"Y.K. Kim","year":"2003","unstructured":"Kim, Y.K., Park, K., Ko, J.: A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput. Oper. Res.\u00a030, 1151\u20131171 (2003)","journal-title":"Comput. Oper. Res."},{"key":"25_CR12","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/s00170-004-2317-y","volume":"28","author":"M. Kumar","year":"2006","unstructured":"Kumar, M., Rajotia, S.: Integration of process planning and scheduling in a job shop environment. Int. J. Adv. Manuf. Technol.\u00a028, 109\u2013116 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR13","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1007\/s001700170035","volume":"18","author":"H. Lee","year":"2001","unstructured":"Lee, H., Kim, S.S.: Integration of process planning and scheduling using simulation based genetic algorithms. Int. J. Adv. Manuf. Technol.\u00a018, 586\u2013590 (2001)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR14","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1080\/09511920600667366","volume":"20","author":"W.D. Li","year":"2007","unstructured":"Li, W.D., McMahon, C.A.: A simulated annealing-based optimization approach for integrated process planning and scheduling. Int. J. Comput. Inetll. Manuf.\u00a020, 80\u201395 (2007)","journal-title":"Int. J. Comput. Inetll. Manuf."},{"key":"25_CR15","doi-asserted-by":"publisher","first-page":"656","DOI":"10.1016\/j.cor.2009.06.008","volume":"37","author":"X. Li","year":"2010","unstructured":"Li, X., Gao, L., Shao, X., Zhang, C., Wang, C.: Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Comput. Oper. Res.\u00a037, 656\u2013667 (2010)","journal-title":"Comput. Oper. Res."},{"key":"25_CR16","first-page":"30","volume":"6","author":"N. Mandahawi","year":"2011","unstructured":"Mandahawi, N., Al-Shihabi, S., Altarazi, S.: A max-min ant system to minimize total tardiness on a single machine with sequence dependent setup times implementing a limited budget local search. Int. J. Res. Rev. App. Sci.\u00a06, 30\u201340 (2011)","journal-title":"Int. J. Res. Rev. App. Sci."},{"key":"25_CR17","first-page":"2117","volume":"6","author":"S. Nourali","year":"2012","unstructured":"Nourali, S., Imanipour, N., Shahriari, M.R.: A Mathematical Model for Integrated Process Planning and Scheduling in Flexible Assembly Job Shop Environment with Sequence Dependent Setup Times. Int. J. Math. Analy.\u00a06, 2117\u20132132 (2012)","journal-title":"Int. J. Math. Analy."},{"key":"25_CR18","doi-asserted-by":"crossref","unstructured":"Pinedo, M.L.: Scheduling: theory, algorithms, and systems. Springer Science & Business Media, NewYork (2012)","DOI":"10.1007\/978-1-4614-2361-4"},{"key":"25_CR19","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1007\/s001700050066","volume":"15","author":"C. Saygin","year":"1999","unstructured":"Saygin, C., Kilic, S.E.: Integrating flexible process plans with scheduling in flexible manufacturing systems. Int. J. Adv. Manuf. Technol.\u00a015, 268\u2013280 (1999)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"25_CR20","doi-asserted-by":"publisher","first-page":"2082","DOI":"10.1016\/j.cor.2008.07.006","volume":"36","author":"X. Shao","year":"2009","unstructured":"Shao, X., Li, X., Gao, L., Zhang, C.: Integration of process planning and scheduling-A modified genetic algorithm-based approach. Comput. Oper. Res.\u00a036, 2082\u20132096 (2009)","journal-title":"Comput. Oper. Res."},{"key":"25_CR21","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1057\/palgrave.jors.2601805","volume":"56","author":"E.F. Stafford","year":"2005","unstructured":"Stafford, E.F., Tseng, F.T., Gupta, J.N.D.: Comparative evaluation of MILP flowshop models. J. Oper. Res. Soc.\u00a056, 88\u2013101 (2005)","journal-title":"J. Oper. Res. Soc."},{"key":"25_CR22","unstructured":"Taiwan Turnkey Project Association, \n                      http:\/\/www.tpcc.org.tw\/wholeplant2\/mainchoose\/1-4.htm"},{"key":"25_CR23","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1023\/B:JIMS.0000037710.80847.b6","volume":"15","author":"W. Tan","year":"2004","unstructured":"Tan, W., Khoshnevis, B.: A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. J. Intell. Manuf.\u00a015, 593\u2013605 (2004)","journal-title":"J. Intell. Manuf."},{"key":"25_CR24","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1023\/A:1008952024606","volume":"11","author":"W. Tan","year":"2000","unstructured":"Tan, W., Khoshnevis, B.: Integration of process planning and scheduling\u2014a review. J. Intell. Manuf.\u00a011, 51\u201363 (2000)","journal-title":"J. Intell. Manuf."},{"key":"25_CR25","unstructured":"Wan, S., Wong, T., Zhang, S., Zhang, L.: Integrated process planning and scheduling with setup time consideration by ant colony optimization: Doctoral dissertation. The University of Hong Kong, Hong Kong (2012)"},{"key":"25_CR26","doi-asserted-by":"publisher","first-page":"3627","DOI":"10.1080\/00207540600675801","volume":"44","author":"T.N. Wong","year":"2006","unstructured":"Wong, T.N., Leung, C.W., Mak, K.L., Fung, R.Y.K.: Integrated process planning and scheduling\/rescheduling\u2014an agent-based approach. Int. J. Prod. Res.\u00a044, 3627\u20133655 (2006)","journal-title":"Int. J. Prod. Res."}],"container-title":["Advances in Intelligent Systems and Computing","Modelling, Computation and Optimization in Information Systems and Management Sciences"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-18167-7_25","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,21]],"date-time":"2023-02-21T05:21:03Z","timestamp":1676956863000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-18167-7_25"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319181660","9783319181677"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-18167-7_25","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2015]]}}}