{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T11:35:34Z","timestamp":1742988934500,"version":"3.40.3"},"publisher-location":"Cham","reference-count":19,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319197180"},{"type":"electronic","value":"9783319197197"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-19719-7_41","type":"book-chapter","created":{"date-parts":[[2015,5,26]],"date-time":"2015-05-26T05:10:56Z","timestamp":1432617056000},"page":"475-483","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["Preparatory Stages of the Production Scheduling of Complex and Multivariant Products Structures"],"prefix":"10.1007","author":[{"given":"Krzysztof","family":"Kalinowski","sequence":"first","affiliation":[]},{"given":"Marcin","family":"Zemczak","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,5,27]]},"reference":[{"key":"41_CR1","doi-asserted-by":"publisher","first-page":"1056","DOI":"10.1016\/j.cor.2004.09.002","volume":"33","author":"A Allahverdi","year":"2006","unstructured":"Allahverdi A, Al-Anzi FS (2006) A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Comput Oper Res 33:1056\u20131080","journal-title":"Comput Oper Res"},{"key":"41_CR2","doi-asserted-by":"crossref","unstructured":"Artigues Ch, Lopez P, Ayache PD (2005) Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis. Ann Oper Res 138: 21\u201352","DOI":"10.1007\/s10479-005-2443-4"},{"key":"41_CR3","doi-asserted-by":"crossref","unstructured":"Brandimarte P (1993) Routing and scheduling in a flexible job shop by tabu search. Ann Oper Res 41: 157\u2013183","DOI":"10.1007\/BF02023073"},{"issue":"2","key":"41_CR4","doi-asserted-by":"publisher","first-page":"183","DOI":"10.5755\/j01.mech.20.2.4476","volume":"20","author":"T Dzitkowski","year":"2014","unstructured":"Dzitkowski T, Dymarek A (2014) Active reduction of identified machine drive system vibrations in the form of multi-stage gear units. Mechanika 20(2):183\u2013189","journal-title":"Mechanika"},{"issue":"3","key":"41_CR5","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","volume":"103","author":"AMA Hariri","year":"1997","unstructured":"Hariri AMA, Potts CN (1997) A branch and bound algorithm for the two-stage assembly scheduling problem. Eur J Oper Res 103(3):547\u2013556","journal-title":"Eur J Oper Res"},{"key":"41_CR6","doi-asserted-by":"publisher","first-page":"422","DOI":"10.4028\/www.scientific.net\/AMR.837.422","volume":"837","author":"K Kalinowski","year":"2014","unstructured":"Kalinowski K, Grabowik C, Kempa W, Paprocka I (2014) The graph representation of multivariant and complex processes for production scheduling. Adv Mater Res 837:422\u2013427","journal-title":"Adv Mater Res"},{"key":"41_CR7","unstructured":"Kalinowski K (2011) Decision making stages in production scheduling of complex products. J Mach Eng 11(1\u20132): 68\u201377"},{"key":"41_CR8","unstructured":"Kalinowski K (2009) Scheduling of production orders with assembly operations and alternatives. In: Proceedings of the 19th international conference on flexible automation and intelligent manufacturing, FAIM 2009, Middlesbrough, p 85"},{"key":"41_CR9","unstructured":"Kaliszewski I (2006) Soft computing for complex multiple criteria decision making. In: International series in operations research\u00a0&\u00a0management science, vol 85"},{"key":"41_CR10","doi-asserted-by":"crossref","unstructured":"Kim J, Ellis R (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. J Constr Eng Manage 136: 160\u2013169","DOI":"10.1061\/(ASCE)0733-9364(2010)136:2(160)"},{"key":"41_CR11","doi-asserted-by":"crossref","unstructured":"Klein R (2000) Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects. Eur J Oper Res 127: 619\u2013638","DOI":"10.1016\/S0377-2217(99)00347-1"},{"key":"41_CR12","doi-asserted-by":"crossref","unstructured":"Navaei J, Fatemi Ghomi SMT, Jolai F, Shiraqai ME, Hidaji H (2013) Two-stage flow-shop scheduling problem with non-identical second stage assembly machines. Int J Adv Manuf Technol 69(9\u201312) 2215\u20132226","DOI":"10.1007\/s00170-013-5187-3"},{"key":"41_CR13","doi-asserted-by":"crossref","unstructured":"Potts CN, Sevast\u2019janov SV, Strusevich VA, Van Wassenhove LN, Zwaneveld CM The two-stage assembly scheduling problem: complexity and approximation. Oper Res 43(2): 346\u2013355","DOI":"10.1287\/opre.43.2.346"},{"issue":"1","key":"41_CR14","doi-asserted-by":"publisher","first-page":"678","DOI":"10.1016\/j.eswa.2009.06.007","volume":"37","author":"A Rossi","year":"2010","unstructured":"Rossi A, Dini G (2010) Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Expert Syst Appl 37(1):678\u2013687","journal-title":"Expert Syst Appl"},{"key":"41_CR15","doi-asserted-by":"crossref","unstructured":"Scholl A, Klein R (1997) SALOME: a bidirectional branch-and-bound procedure for assembly line balancing. INFORMS J Comput Fall 9: 319\u2013334","DOI":"10.1287\/ijoc.9.4.319"},{"issue":"1","key":"41_CR16","doi-asserted-by":"publisher","first-page":"678","DOI":"10.1016\/j.eswa.2009.06.007","volume":"37","author":"M Yazdani","year":"2010","unstructured":"Yazdani M, Amiri M, Zandieh M (2010) Flexible job-shop scheduling with parallel variable neighborhood search algorithm. Expert Syst Appl 37(1):678\u2013687","journal-title":"Expert Syst Appl"},{"key":"41_CR17","unstructured":"Zemczak M, Kalinowski K (2014) Computer aided order sequencing in a mixed-model assembly system. Zarz\u0105dzanie Przedsi\u0119biorstwem 2014(2): 42\u201348"},{"key":"41_CR18","first-page":"2014","volume":"864\u2013868","author":"M Zemczak","year":"1036","unstructured":"Zemczak M, Krenczyk D (1036) A new procedure of production orders sequencing in mixed-model production systems. Adv Mater Res 864\u2013868:2014","journal-title":"Adv Mater Res"},{"key":"41_CR19","unstructured":"Zolkiewski S Testing composite materials connected in bolt joints. J Vibroeng 13(4): 817\u2013822"}],"container-title":["Advances in Intelligent Systems and Computing","10th International Conference on Soft Computing Models in Industrial and Environmental Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-19719-7_41","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,20]],"date-time":"2023-01-20T09:41:55Z","timestamp":1674207715000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-19719-7_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319197180","9783319197197"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-19719-7_41","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"27 May 2015","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}