{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,8]],"date-time":"2026-02-08T06:26:47Z","timestamp":1770532007038,"version":"3.49.0"},"publisher-location":"Cham","reference-count":12,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319213798","type":"print"},{"value":"9783319213804","type":"electronic"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-21380-4_99","type":"book-chapter","created":{"date-parts":[[2015,7,20]],"date-time":"2015-07-20T02:15:38Z","timestamp":1437358538000},"page":"582-586","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["An Artificial Bee Colony Algorithm for the Resource Contrained Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Broderick","family":"Crawford","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ricardo","family":"Soto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Franklin","family":"Johnson","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Enrique","family":"Norero","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Eduardo","family":"Olgu\u00edn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"99_CR1","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen, K., Lecocq, H.: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. Eur. J. Oper. Res. 149(2), 268\u2013281 (2003)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"99_CR2","doi-asserted-by":"publisher","first-page":"1899","DOI":"10.1016\/j.eswa.2009.07.024","volume":"37","author":"R-M Chen","year":"2010","unstructured":"Chen, R.-M., Wu, C.-L., Wang, C.-M., Lo, S.-T.: Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in psplib. Expert Syst. Appl. 37(3), 1899\u20131910 (2010)","journal-title":"Expert Syst. Appl."},{"issue":"1","key":"99_CR3","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1007\/s10732-011-9158-2","volume":"18","author":"M Chiarandini","year":"2012","unstructured":"Chiarandini, M., Di Gaspero, L., Gualandi, S., Schaerf, A.: The balanced academic curriculum problem revisited. J. Heuristics 18(1), 119\u2013148 (2012)","journal-title":"J. Heuristics"},{"issue":"7","key":"99_CR4","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1002\/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C","volume":"45","author":"S Hartmann","year":"1998","unstructured":"Hartmann, S.: A competitive genetic algorithm for resource-constrained project scheduling. Naval Res. Logistics (NRL) 45(7), 733\u2013750 (1998)","journal-title":"Naval Res. Logistics (NRL)"},{"key":"99_CR5","first-page":"1","volume":"0459","author":"J Herbots","year":"2004","unstructured":"Herbots, J., Herroelen, W., Leus, R.: Experimental investigation of the applicability of ant colony optimization algorithms for project scheduling. DTEW Res. Rep. 0459, 1\u201325 (2004)","journal-title":"DTEW Res. Rep."},{"key":"99_CR6","unstructured":"Karaboga, D.: An idea based on honey bee swarm for numerical optimization. Technical report, Technical report-tr06, Erciyes university, Engineering Faculty, Computer Engineering Department (2005)"},{"issue":"2","key":"99_CR7","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1016\/S0166-3615(99)00071-8","volume":"42","author":"K Kempf","year":"2000","unstructured":"Kempf, K., Uzsoy, R., Smith, S., Gary, K.: Evaluation and comparison of production schedules. Comput. Ind. 42(2), 203\u2013220 (2000)","journal-title":"Comput. Ind."},{"key":"99_CR8","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1007\/978-1-4615-1507-4_25","volume-title":"Essays and Surveys in Metaheuristics","author":"K Nonobe","year":"2002","unstructured":"Nonobe, K., Ibaraki, T.: Formulation and Tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro, C.C., Hansen, P. (eds.) Essays and Surveys in Metaheuristics, pp. 557\u2013588. Springer, London (2002)"},{"issue":"3","key":"99_CR9","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1002\/(SICI)1520-6750(200004)47:3<201::AID-NAV2>3.0.CO;2-L","volume":"47","author":"A Schirmer","year":"2000","unstructured":"Schirmer, A.: Case-based reasoning and improved adaptive search for project scheduling. Naval Res. Logistics (NRL) 47(3), 201\u2013222 (2000)","journal-title":"Naval Res. Logistics (NRL)"},{"issue":"2","key":"99_CR10","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1016\/j.ejor.2004.04.008","volume":"165","author":"V Valls","year":"2005","unstructured":"Valls, V., Ballest\u00edn, F., Quintanilla, S.: Justification and RCPSP: a technique that pays. Eur. J. Oper. Res. 165(2), 375\u2013386 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"99_CR11","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1016\/j.ijproman.2005.06.006","volume":"24","author":"H Zhang","year":"2006","unstructured":"Zhang, H., Li, H., Tam, C.: Particle swarm optimization for resource-constrained project scheduling. Int. J. Project Manag. 24(1), 83\u201392 (2006)","journal-title":"Int. J. Project Manag."},{"issue":"3","key":"99_CR12","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/j.autcon.2004.08.006","volume":"14","author":"H Zhang","year":"2005","unstructured":"Zhang, H., Li, X., Li, H., Huang, F.: Particle swarm optimization-based schemes for resource-constrained project scheduling. Autom. Constr. 14(3), 393\u2013404 (2005)","journal-title":"Autom. Constr."}],"container-title":["Communications in Computer and Information Science","HCI International 2015 - Posters\u2019 Extended Abstracts"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-21380-4_99","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,14]],"date-time":"2020-05-14T08:21:54Z","timestamp":1589444514000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-21380-4_99"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319213798","9783319213804"],"references-count":12,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-21380-4_99","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}