{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T08:53:34Z","timestamp":1743065614908,"version":"3.40.3"},"publisher-location":"Cham","reference-count":10,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319227559"},{"type":"electronic","value":"9783319227566"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-22756-6_54","type":"book-chapter","created":{"date-parts":[[2015,8,17]],"date-time":"2015-08-17T13:21:11Z","timestamp":1439817671000},"page":"439-446","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Job Shop Scheduling with Alternative Machines Using a Genetic Algorithm Incorporating Heuristic Rules -Effectiveness of Due-Date Related Information-"],"prefix":"10.1007","author":[{"given":"Parinya","family":"Kaweegitbundit","sequence":"first","affiliation":[]},{"given":"Toru","family":"Eguchi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,8,18]]},"reference":[{"issue":"9","key":"54_CR1","doi-asserted-by":"publisher","first-page":"1595","DOI":"10.1080\/00207549008942818","volume":"28","author":"N Nasr","year":"1990","unstructured":"Nasr, N., Elsayed, E.A.: Job shop scheduling with alternative machines. Int. J. Prod. Res. 28(9), 1595\u20131609 (1990)","journal-title":"Int. J. Prod. Res."},{"issue":"10","key":"54_CR2","doi-asserted-by":"publisher","first-page":"2695","DOI":"10.1080\/00207540701244820","volume":"46","author":"I Moon","year":"2008","unstructured":"Moon, I., Lee, S., Bae, H.: Genetic algorithm for job shop scheduling problems with alternative routing. Int. J. Prod. Res. 46(10), 2695\u20132705 (2008)","journal-title":"Int. J. Prod. Res."},{"doi-asserted-by":"crossref","unstructured":"Kaweegitbundit, P., Eguchi, T.: Job shop scheduling with alternative machines using genetic algorithm incorporating heuristic rules. In: Mechanical Engineering Congress, 2014 Japan[MECJ-14], No. 14-1, S1420140. The Japan Society of Mechanical Engineers, Tokyo (2014)","key":"54_CR3","DOI":"10.1299\/jsmemecj.2014._S1420104-"},{"doi-asserted-by":"crossref","unstructured":"Eguchi, T., Kaweegitbundit, P., Hoshino, N., Daido, T., Murayama, T.: Job shop scheduling with alternative machines\u2013experimental evaluation of the scheduling method using a genetic algorithm incorporating heuristic rules\u2013. In: Manufacturing Systems Division Conference 2015, No. 15-8, pp. 95\u201396. The Japan Society of Mechanical Engineers, Tokyo (2015)","key":"54_CR4","DOI":"10.1299\/jsmemsd.2015.95"},{"doi-asserted-by":"crossref","unstructured":"Yoda, M., Eguchi, T., Murayama, T.: Job shop scheduling for meeting due dates and minimizing overtime using genetic algorithm incorporating new priority rules. J. Adv. Mech. Des. Syst. Manufact. 8(5), paper no. 14\u201300076 (2014)","key":"54_CR5","DOI":"10.1299\/jamdsm.2014jamdsm0071"},{"issue":"4","key":"54_CR6","first-page":"459","volume":"72","author":"T Eguchi","year":"2006","unstructured":"Eguchi, T., Oba, F., Toyooka, S., Sato, Y.: A machine selection rule for dynamic job shop having alternative machines with different processing times. J. Jpn. Soc. Precis. Eng. 72(4), 459\u2013464 (2006)","journal-title":"J. Jpn. Soc. Precis. Eng."},{"issue":"703","key":"54_CR7","doi-asserted-by":"publisher","first-page":"1047","DOI":"10.1299\/kikaic.71.1047","volume":"71","author":"T Eguchi","year":"2005","unstructured":"Eguchi, T., Oba, F., Kozaki, S.: Dynamic scheduling using the mixture of a genetic algorithm and a priority rule. Trans. Jpn. Soc. Mech. Eng. Ser. C 71(703), 1047\u20131053 (2005). (in Japanese)","journal-title":"Trans. Jpn. Soc. Mech. Eng. Ser. C"},{"issue":"12","key":"54_CR8","doi-asserted-by":"publisher","first-page":"2277","DOI":"10.1080\/00207549008942866","volume":"28","author":"EJ Anderson","year":"1990","unstructured":"Anderson, E.J., Nyirenda, J.C.: Two new rules to minimize tardiness in a job shop. Int. J. Prod. Res. 28(12), 2277\u20132292 (1990)","journal-title":"Int. J. Prod. Res."},{"issue":"8","key":"54_CR9","doi-asserted-by":"publisher","first-page":"1035","DOI":"10.1287\/mnsc.33.8.1035","volume":"33","author":"APJ Vepsalainen","year":"1987","unstructured":"Vepsalainen, A.P.J., Morton, T.E.: Priority rules for job shop with weighted tardiness costs. Manage. Sci. 33(8), 1035\u20131047 (1987)","journal-title":"Manage. Sci."},{"issue":"4","key":"54_CR10","first-page":"228","volume":"16","author":"RW Conway","year":"1965","unstructured":"Conway, R.W.: Priority dispatching and job lateness in a job shop. J. Ind. Eng. 16(4), 228\u2013237 (1965)","journal-title":"J. Ind. Eng."}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-22756-6_54","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,16]],"date-time":"2019-08-16T20:11:25Z","timestamp":1565986285000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-22756-6_54"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319227559","9783319227566"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-22756-6_54","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"18 August 2015","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}