{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T22:54:05Z","timestamp":1742943245105,"version":"3.40.3"},"publisher-location":"Cham","reference-count":15,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319227559"},{"type":"electronic","value":"9783319227566"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-22756-6_67","type":"book-chapter","created":{"date-parts":[[2015,8,17]],"date-time":"2015-08-17T13:21:11Z","timestamp":1439817671000},"page":"549-557","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Performing Supply Chain Design in Three-Dimensional Concurrent Engineering: Requirements and Challenges"],"prefix":"10.1007","author":[{"given":"Ottar","family":"Bak\u00e5s","sequence":"first","affiliation":[]},{"given":"Kristoffer","family":"Mager\u00f8y","sequence":"additional","affiliation":[]},{"given":"B\u00f8rge","family":"Sj\u00f8bakk","sequence":"additional","affiliation":[]},{"given":"Maria Kollberg","family":"Thomassen","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,8,18]]},"reference":[{"issue":"2","key":"67_CR1","doi-asserted-by":"publisher","first-page":"536","DOI":"10.1016\/j.ejor.2004.08.040","volume":"171","author":"JE Carrillo","year":"2006","unstructured":"Carrillo, J.E., Franza, R.M.: Investing in product development and production capabilities: the crucial linkage between time-to-market and ramp-up time. Eur. J. Oper. Res. 171(2), 536\u2013556 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"67_CR2","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1111\/j.1937-5956.2000.tb00134.x","volume":"9","author":"CH Fine","year":"2000","unstructured":"Fine, C.H.: Clockspeed-based strategies for supply chain design. Prod. Oper. Manage. 9(3), 213\u2013221 (2000)","journal-title":"Prod. Oper. Manage."},{"issue":"3\u20134","key":"67_CR3","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.jom.2004.08.006","volume":"23","author":"SK Fixson","year":"2005","unstructured":"Fixson, S.K.: Product architecture assessment: a tool to link product, process, and supply chain design decisions. J. Oper. Manage. 23(3\u20134), 345\u2013369 (2005)","journal-title":"J. Oper. Manage."},{"key":"67_CR4","volume-title":"Clockspeed: Winning Industry Control in the Age of Temporary Advantage","author":"CH Fine","year":"1998","unstructured":"Fine, C.H.: Clockspeed: Winning Industry Control in the Age of Temporary Advantage. Basic Books, New York (1998)"},{"issue":"4","key":"67_CR5","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1108\/09600030710752523","volume":"37","author":"LM Ellram","year":"2007","unstructured":"Ellram, L.M., Tate, W.L., Carter, C.R.: Product-process-supply chain: an integrative approach to three-dimensional concurrent engineering. Int. J. Phys. Distrib. Logistics Manage. 37(4), 305\u2013330 (2007)","journal-title":"Int. J. Phys. Distrib. Logistics Manage."},{"issue":"2","key":"67_CR6","doi-asserted-by":"publisher","first-page":"264","DOI":"10.1108\/02635571111115173","volume":"111","author":"P Hilletofth","year":"2011","unstructured":"Hilletofth, P., Eriksson, D.: Coordinating new product development with supply chain management. Ind. Manage. Data Syst. 111(2), 264\u2013281 (2011)","journal-title":"Ind. Manage. Data Syst."},{"issue":"5","key":"67_CR7","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1108\/13598540610682390","volume":"11","author":"R Hoek van","year":"2006","unstructured":"van Hoek, R., Chapman, P.: From tinkering around the edge to enhancing revenue growth: supply chain-new product development. Supply Chain Manage. Int. J. 11(5), 385\u2013389 (2006)","journal-title":"Supply Chain Manage. Int. J."},{"issue":"4","key":"67_CR8","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1108\/13598540710759745","volume":"12","author":"R Hoek van","year":"2007","unstructured":"van Hoek, R., Chapman, P.: How to move supply chain beyond cleaning up after new product development. Supply Chain Manage. Int. J. 12(4), 239\u2013244 (2007)","journal-title":"Supply Chain Manage. Int. J."},{"key":"67_CR9","volume-title":"Strategic Supply Management: Principles Theories and Practice","author":"P Cousins","year":"2008","unstructured":"Cousins, P., et al.: Strategic Supply Management: Principles Theories and Practice. Person Education, Harlow (2008)"},{"issue":"4","key":"67_CR10","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1016\/S0019-8501(00)00109-7","volume":"29","author":"L-E Gadde","year":"2000","unstructured":"Gadde, L.-E., Snehota, I.: Making the most of supplier relationships. Ind. Mark. Manage. 29(4), 305\u2013316 (2000)","journal-title":"Ind. Mark. Manage."},{"issue":"3\u20134","key":"67_CR11","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0923-4748(02)00020-6","volume":"19","author":"F Corswant von","year":"2002","unstructured":"von Corswant, F., Tun\u00e4lv, C.: Coordinating customers and proactive suppliers: a case study of supplier collaboration in product development. J. Eng. Tech. Manage. 19(3\u20134), 249\u2013261 (2002)","journal-title":"J. Eng. Tech. Manage."},{"issue":"1","key":"67_CR12","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/S0019-8501(99)00110-8","volume":"29","author":"M Christopher","year":"2000","unstructured":"Christopher, M.: The agile supply chain: competing in volatile markets. Ind. Mark. Manage. 29(1), 37\u201344 (2000)","journal-title":"Ind. Mark. Manage."},{"issue":"3","key":"67_CR13","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.omega.2003.09.005","volume":"32","author":"R McIvor","year":"2004","unstructured":"McIvor, R., Humphreys, P.: Early supplier involvement in the design process: lessons from the electronics industry. Omega 32(3), 179\u2013199 (2004)","journal-title":"Omega"},{"key":"67_CR14","volume-title":"Case Study Research: Design and Methods","author":"RK Yin","year":"2009","unstructured":"Yin, R.K.: Case Study Research: Design and Methods. Sage Publications, Inc., Thousand Oaks (2009)"},{"key":"67_CR15","volume-title":"Multiple Case Study Analysis","author":"RE Stake","year":"2006","unstructured":"Stake, R.E.: Multiple Case Study Analysis. The Guilford Press, New York (2006)"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-22756-6_67","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,16]],"date-time":"2019-08-16T20:12:22Z","timestamp":1565986342000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-22756-6_67"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319227559","9783319227566"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-22756-6_67","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"18 August 2015","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}