{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T00:08:09Z","timestamp":1743034089192,"version":"3.40.3"},"publisher-location":"Cham","reference-count":23,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319242637"},{"type":"electronic","value":"9783319242644"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-24264-4_19","type":"book-chapter","created":{"date-parts":[[2015,9,18]],"date-time":"2015-09-18T06:32:28Z","timestamp":1442557948000},"page":"267-280","source":"Crossref","is-referenced-by-count":0,"title":["Yard Crane Dispatching to Minimize Total Weighted Vessel Turnaround Times in Container Terminals"],"prefix":"10.1007","author":[{"given":"Shell Ying","family":"Huang","sequence":"first","affiliation":[]},{"given":"Ya","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,20]]},"reference":[{"key":"19_CR1","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1016\/j.ijpe.2008.05.014","volume":"115","author":"Z Cao","year":"2008","unstructured":"Cao, Z., Lee, D.H., Meng, Q.: Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals. International Journal of Production Economics 115, 221\u2013228 (2008)","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"19_CR2","doi-asserted-by":"publisher","first-page":"412","DOI":"10.1016\/j.ejor.2013.10.054","volume":"235","author":"HJ Carlo","year":"2014","unstructured":"Carlo, H.J., Vis, I.F.A., Roodbergen, K.J.: Storage yard operations in container terminals: Literature overview, trends, and research directions. European Journal of Operational Research 235(2), 412\u2013430 (2014)","journal-title":"European Journal of Operational Research"},{"key":"19_CR3","unstructured":"Guo, X., Huang, S.Y., Hsu, W.J., Low, M.Y.H., Chan, T.H., Liu, J.H.: Vehicle Dispatching with real time location information in container terminals. In: Proceedings of the European Modeling and Simulation Symposium (2007)"},{"issue":"3","key":"19_CR4","doi-asserted-by":"publisher","first-page":"472","DOI":"10.1016\/j.aei.2011.02.002","volume":"25","author":"X Guo","year":"2011","unstructured":"Guo, X., Huang, S.Y., Hsu, W.J., Low, M.Y.H.: Dynamic Yard Crane Dispatching in Container Terminals with Predicted Vehicle Arrival Information. Advanced Engineering Informatics 25(3), 472\u2013484 (2011)","journal-title":"Advanced Engineering Informatics"},{"issue":"1","key":"19_CR5","doi-asserted-by":"publisher","first-page":"134","DOI":"10.1287\/trsc.1110.0383","volume":"46","author":"X Guo","year":"2012","unstructured":"Guo, X., Huang, S.Y.: Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals. Transportation Science 46(1), 134\u2013148 (2012)","journal-title":"Transportation Science"},{"key":"19_CR6","unstructured":"Huang, S.Y., Tay, Z.C.: A Framework for Automated Real Time Management of Container Handling Equipment. In: The 2013 International Conference on Logistics and Maritime Systems (2013)"},{"key":"19_CR7","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1007\/s10845-005-0020-y","volume":"17","author":"SH Jung","year":"2006","unstructured":"Jung, S.H., Kim, K.H.: Load scheduling for multiple quay cranes in port container terminals. Journal of Intelligent Manufacturing 17, 479\u2013492 (2006)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"19_CR8","doi-asserted-by":"crossref","unstructured":"Kemme, N.: RMG crane scheduling and stacking. In: Bose, J.W. (eds) Handbook of Terminal Planning. Springer (2010)","DOI":"10.1007\/978-1-4419-8408-1_14"},{"key":"19_CR9","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1007\/s00291-003-0148-0","volume":"26","author":"KH Kim","year":"2004","unstructured":"Kim, K.H., Kang, J.S., Ryu, K.R.: A beam search algorithm for the load sequencing of outbound containers in port container terminals. OR Spectrum 26, 93\u2013116 (2004)","journal-title":"OR Spectrum"},{"issue":"1","key":"19_CR10","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1287\/trsc.33.1.17","volume":"33","author":"KM Kim","year":"1999","unstructured":"Kim, K.M., Kim, K.Y.: An optimal routing algorithm for a transfer crane in port container terminals. Transportation Science 33(1), 17\u201333 (1999)","journal-title":"Transportation Science"},{"key":"19_CR11","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1002\/nav.10076","volume":"50","author":"KY Kim","year":"2003","unstructured":"Kim, K.Y., Kim, K.H.: Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals. Naval Research Logistics 50, 498\u2013514 (2003)","journal-title":"Naval Research Logistics"},{"key":"19_CR12","first-page":"335","volume":"67","author":"MM Kumar","year":"2008","unstructured":"Kumar, M.M., Omkar, S.N.: Optimization of yard crane scheduling using particle swarm optimizartion with genetic algorithm operators (PSOGAO). Journal of Scientific & Industrial Research 67, 335\u2013339 (2008)","journal-title":"Journal of Scientific & Industrial Research"},{"key":"19_CR13","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.ijpe.2006.08.003","volume":"107","author":"DH Lee","year":"2007","unstructured":"Lee, D.H., Cao, Z., Meng, Q.: Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm. International Journal of Production Economics 107, 115\u2013124 (2007)","journal-title":"International Journal of Production Economics"},{"key":"19_CR14","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/j.ejor.2008.08.019","volume":"198","author":"W Li","year":"2009","unstructured":"Li, W., Wu, Y., Petering, M., Goh, M., d. Souza, R.: Discrete time model and algorithms for container yard crane scheduling. European Journal of Operational Research 198, 165\u2013172 (2009)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"19_CR15","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1287\/trsc.36.1.63.576","volume":"36","author":"A Narasimhan","year":"2002","unstructured":"Narasimhan, A., Palekar, U.S.: Analysis and Algorithm for the Transtainer Routing Problem in Container Port Operation. Transportation Science 36(1), 63\u201378 (2002)","journal-title":"Transportation Science"},{"key":"19_CR16","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1016\/j.ejor.2003.11.025","volume":"164","author":"WC Ng","year":"2005","unstructured":"Ng, W.C.: Crane scheduling in container yards with intercrane interference. European Journal of Operational Research 164, 64\u201378 (2005)","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"19_CR17","doi-asserted-by":"publisher","first-page":"867","DOI":"10.1080\/03052150500323849","volume":"37","author":"WC Ng","year":"2005","unstructured":"Ng, W.C., Mak, K.L.: An effective heuristic for scheduling a yard crane to handle jobs with different ready times. Engineering Optimization 37(8), 867\u2013877 (2005a)","journal-title":"Engineering Optimization"},{"issue":"3","key":"19_CR18","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/j.apm.2004.09.009","volume":"29","author":"WC Ng","year":"2005","unstructured":"Ng, W.C., Mak, K.L.: Yard crane scheduling in port container terminals. Applied Mathematical Modelling 29(3), 263\u2013276 (2005b)","journal-title":"Applied Mathematical Modelling"},{"key":"19_CR19","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1007\/s00291-010-0209-0","volume":"32","author":"T Park","year":"2010","unstructured":"Park, T., Choe, R., Ok, S.M., Ryu, K.R.: Real-time scheduling for twin RMGs in an automated container yard. OR Spectrum 32, 593\u2013615 (2010)","journal-title":"OR Spectrum"},{"key":"19_CR20","doi-asserted-by":"publisher","first-page":"801","DOI":"10.1007\/s00291-008-0142-7","volume":"31","author":"MEH Petering","year":"2009","unstructured":"Petering, M.E.H., Wu, Y., Li, W., Goh, M., d. Souza, R.: Development and simulation analysis of real-time yard crane control systems for seaport container transhipment terminals. OR Spectrum 31, 801\u2013835 (2009)","journal-title":"OR Spectrum"},{"issue":"1","key":"19_CR21","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1504\/IJSTL.2010.029899","volume":"2","author":"R Stahlbock","year":"2010","unstructured":"Stahlbock, R., Voss, S.: Efficiency consideration for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals. International Journal of Shipping and Transport Logistics 2(1), 95\u2013123 (2010)","journal-title":"International Journal of Shipping and Transport Logistics"},{"key":"19_CR22","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s00291-003-0157-z","volume":"26","author":"D Steenken","year":"2004","unstructured":"Steenken, D., Vo\u00df, S., Stahlbock, R.: Container terminal operation and operations research \u2013 a classification and literature review. OR Spectrum 26, 3\u201349 (2004)","journal-title":"OR Spectrum"},{"issue":"6","key":"19_CR23","doi-asserted-by":"publisher","first-page":"1935","DOI":"10.1016\/j.cor.2008.06.010","volume":"36","author":"Q Zeng","year":"2009","unstructured":"Zeng, Q., Yang, Z.: Integrating simulation and optimization to schedule loading operations in container terminals. Computers & Operations Research 36(6), 1935\u20131944 (2009)","journal-title":"Computers & Operations Research"}],"container-title":["Lecture Notes in Computer Science","Computational Logistics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-24264-4_19","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T20:31:47Z","timestamp":1559248307000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-24264-4_19"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319242637","9783319242644"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-24264-4_19","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2015]]}}}