{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T22:36:57Z","timestamp":1742942217871,"version":"3.40.3"},"publisher-location":"Cham","reference-count":48,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319244976"},{"type":"electronic","value":"9783319244990"}],"license":[{"start":{"date-parts":[[2015,10,31]],"date-time":"2015-10-31T00:00:00Z","timestamp":1446249600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-24499-0_6","type":"book-chapter","created":{"date-parts":[[2015,10,30]],"date-time":"2015-10-30T15:26:26Z","timestamp":1446218786000},"page":"141-177","source":"Crossref","is-referenced-by-count":0,"title":["An Integrated Framework to Analyze the Performance of Process Industrial Systems Using a Fuzzy and Evolutionary Algorithm"],"prefix":"10.1007","author":[{"given":"Harish","family":"Garg","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,31]]},"reference":[{"key":"6_CR1","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/S0165-0114(86)80034-3","volume":"20","author":"KT Attanassov","year":"1986","unstructured":"Attanassov, K.T.: Intuitionistic fuzzy sets. Fuzzy Sets Syst. 20, 87\u201396 (1986)","journal-title":"Fuzzy Sets Syst."},{"issue":"1","key":"6_CR2","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/0165-0114(89)90215-7","volume":"33","author":"KT Attanassov","year":"1989","unstructured":"Attanassov, K.T.: More on intuitionistic fuzzy sets. Fuzzy Sets Syst. 33(1), 37\u201346 (1989)","journal-title":"Fuzzy Sets Syst."},{"key":"6_CR3","unstructured":"Barabady, J., Kumar, U.: Maintenance schedule by using reliability analysis: a case study at jajarm bauxite mine of iran. In: 20th World Mining Congress and EXPO2005, pp. 79\u201386. Tehran, Iran (2005a)"},{"key":"6_CR4","doi-asserted-by":"crossref","unstructured":"Barabady, J., Kumar, U.: Reliability and maintainability analysis of crushing plants in jajarm bauxite mine of iran. In: Proceedings of the Annual Reliability and Maintainability Symposium, pp. 109\u2013115 (2005b)","DOI":"10.1109\/RAMS.2005.1408347"},{"key":"6_CR5","volume-title":"Reliability Engineering: Theory and Practice","author":"A Birolini","year":"2007","unstructured":"Birolini, A.: Reliability Engineering: Theory and Practice, 5th edn. Springer, New York (2007)","edition":"5"},{"key":"6_CR6","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/S0951-8320(03)00166-2","volume":"82","author":"R Bris","year":"2003","unstructured":"Bris, R., Chatelet, E., Yalaoui, F.: New method to minimize the preventive maintenance cost of series-parallel systems. Reliab. Eng. Syst. Saf. 82, 247\u2013255 (2003)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"3","key":"6_CR7","doi-asserted-by":"publisher","first-page":"403","DOI":"10.1016\/0165-0114(95)00154-9","volume":"79","author":"H Bustince","year":"1996","unstructured":"Bustince, H., Burillo, P.: Vague sets are intuitionistic fuzzy sets. Fuzzy Sets Syst. 79(3), 403\u2013405 (1996)","journal-title":"Fuzzy Sets Syst."},{"key":"6_CR8","doi-asserted-by":"publisher","first-page":"531","DOI":"10.1007\/s00500-005-0483-y","volume":"10","author":"JR Chang","year":"2006","unstructured":"Chang, J.R., Chang, K.H., Liao, S.H., Cheng, C.H.: The reliability of general vague fault tree analysis on weapon systems fault diagnosis. Soft. Comput. 10, 531\u2013542 (2006)","journal-title":"Soft. Comput."},{"issue":"1","key":"6_CR9","first-page":"82","volume":"1","author":"SM Chen","year":"2003","unstructured":"Chen, S.M.: Analyzing fuzzy system reliability using vague set theory. Int. J. Appl. Sci. Eng. 1(1), 82\u201388 (2003)","journal-title":"Int. J. Appl. Sci. Eng."},{"issue":"1","key":"6_CR10","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1109\/4235.985692","volume":"6","author":"M Clerc","year":"2002","unstructured":"Clerc, M., Kennedy, J.F.: The particle swarm: explosion, stability, and convergence in a multi-dimensional complex space. IEEE Trans. Evol. Comput. 6(1), 58\u201373 (2002)","journal-title":"IEEE Trans. Evol. Comput."},{"issue":"3","key":"6_CR11","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1142\/S0218539307002623","volume":"14","author":"U Dinesh-Kumar","year":"2007","unstructured":"Dinesh-Kumar, U., Marquez, J.E.R., Nowicki, D., Verma, D.: A goal programming model for optimizing reliability, maintainability and supportability under performance based logistics. Int. J. Reliab., Qual. Saf. 14(3), 251\u2013261 (2007)","journal-title":"Int. J. Reliab., Qual. Saf."},{"key":"6_CR12","doi-asserted-by":"crossref","unstructured":"Eberhart, R., Kennedy, J.: A new optimizer using particle swarm theory. In: Proceedings of the Sixth International Symposium on Micro Machine and Human Science, pp. 39\u201343 (1995)","DOI":"10.1109\/MHS.1995.494215"},{"issue":"1","key":"6_CR13","doi-asserted-by":"publisher","first-page":"6","DOI":"10.1016\/j.isatra.2012.06.009","volume":"52","author":"H Garg","year":"2013","unstructured":"Garg, H.: Reliability analysis of repairable systems using Petri nets and Vague Lambda-Tau methodology. ISA Trans. 52(1), 6\u201318 (2013)","journal-title":"ISA Trans."},{"issue":"6","key":"6_CR14","doi-asserted-by":"publisher","first-page":"701","DOI":"10.1016\/j.isatra.2013.06.010","volume":"52","author":"H Garg","year":"2013","unstructured":"Garg, H., Rani, M.: An approach for reliability analysis of industrial systems using PSO and IFS technique. ISA Trans. 52(6), 701\u2013710 (2013)","journal-title":"ISA Trans."},{"key":"6_CR15","doi-asserted-by":"crossref","unstructured":"Garg, H., Rani, M., Sharma, S.P.: Fuzzy RAM analysis of the screening unit in a paper industry by utilizing uncertain data. Int. J. Qual., Stat. Reliab., Article ID: 203,842, 14\u00a0p (2012)","DOI":"10.1155\/2012\/203842"},{"issue":"4","key":"6_CR16","doi-asserted-by":"publisher","first-page":"1869","DOI":"10.1016\/j.asoc.2012.12.017","volume":"13","author":"H Garg","year":"2013","unstructured":"Garg, H., Rani, M., Sharma, S.P.: Predicting uncertain behavior of press unit in a paper industry using artificial bee colony and fuzzy Lambda-Tau methodology. Appl. Soft Comput. 13(4), 1869\u20131881 (2013)","journal-title":"Appl. Soft Comput."},{"issue":"2","key":"6_CR17","doi-asserted-by":"publisher","first-page":"489","DOI":"10.1016\/j.eswa.2013.07.075","volume":"41","author":"H Garg","year":"2014","unstructured":"Garg, H., Rani, M., Sharma, S.P.: An approach for analyzing the reliability of industrial systems using soft computing based technique. Expert Syst. Appl. 41(2), 489\u2013501 (2014a)","journal-title":"Expert Syst. Appl."},{"key":"6_CR18","doi-asserted-by":"publisher","first-page":"3157","DOI":"10.1016\/j.eswa.2013.11.014","volume":"41","author":"H Garg","year":"2014","unstructured":"Garg, H., Rani, M., Sharma, S.P., Vishwakarma, Y.: Intuitionistic fuzzy optimization technique for solving multi-objective reliability optimization problems in interval environment. Expert Syst. Appl. 41, 3157\u20133167 (2014b)","journal-title":"Expert Syst. Appl."},{"issue":"6","key":"6_CR19","doi-asserted-by":"publisher","first-page":"752","DOI":"10.1016\/j.isatra.2012.06.012","volume":"51","author":"H Garg","year":"2012","unstructured":"Garg, H., Sharma, S.P.: Stochastic behavior analysis of industrial systems utilizing uncertain data. ISA Trans. 51(6), 752\u2013762 (2012)","journal-title":"ISA Trans."},{"key":"6_CR20","doi-asserted-by":"publisher","unstructured":"Garg, H., Sharma, S.P.: A two-phase approach for reliability and maintainability analysis of an industrial system. Int. J. Reliab., Qual. Saf. Eng. (IJRQSE) 19(3) (2012). doi: 10.1142\/S0218539312500131","DOI":"10.1142\/S0218539312500131"},{"issue":"1","key":"6_CR21","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/j.cie.2012.09.015","volume":"64","author":"H Garg","year":"2013","unstructured":"Garg, H., Sharma, S.P.: Multi-objective reliability-redundancy allocation problem using particle swarm optimization. Comput. Ind. Eng. 64(1), 247\u2013255 (2013)","journal-title":"Comput. Ind. Eng."},{"issue":"4","key":"6_CR22","doi-asserted-by":"publisher","first-page":"371","DOI":"10.1007\/s13198-012-0128-3","volume":"3","author":"H Garg","year":"2012","unstructured":"Garg, H., Sharma, S.P., Rani, M.: Cost minimization of washing unit in a paper mill using artificial bee colony technique. Int. J. Syst. Assur. Eng. Manag. 3(4), 371\u2013381 (2012)","journal-title":"Int. J. Syst. Assur. Eng. Manag."},{"key":"6_CR23","doi-asserted-by":"publisher","first-page":"610","DOI":"10.1109\/21.229476","volume":"23","author":"WL Gau","year":"1993","unstructured":"Gau, W.L., Buehrer, D.J.: Vague sets. IEEE Trans. Syst., Man, Cybern. 23, 610\u2013613 (1993)","journal-title":"IEEE Trans. Syst., Man, Cybern."},{"issue":"9","key":"6_CR24","doi-asserted-by":"publisher","first-page":"1008","DOI":"10.1016\/j.ress.2005.11.053","volume":"91","author":"M Gen","year":"2006","unstructured":"Gen, M., Yun, Y.S.: Soft computing approach for reliability optimization: state-of- the-art survey. Reliab. Eng. Syst. Saf. 91(9), 1008\u20131026 (2006)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"6_CR25","volume-title":"Genetic Algorithm in Search, Optimization and Machine Learning","author":"DE Goldberg","year":"1989","unstructured":"Goldberg, D.E.: Genetic Algorithm in Search, Optimization and Machine Learning. Addison-Wesley, MA (1989)"},{"key":"6_CR26","volume-title":"Adaptation in Natural and Artificial Systems","author":"JH Holland","year":"1975","unstructured":"Holland, J.H.: Adaptation in Natural and Artificial Systems. The University of Michigan Press, Ann Arbor (1975)"},{"issue":"11","key":"6_CR27","doi-asserted-by":"publisher","first-page":"2688","DOI":"10.1016\/j.cor.2012.02.002","volume":"39","author":"TJ Hsieh","year":"2012","unstructured":"Hsieh, T.J., Yeh, W.C.: Penalty guided bees search for redundancy allocation problems with a mix of components in series\u2013parallel systems. Comput. Oper. Res. 39(11), 2688\u20132704 (2012)","journal-title":"Comput. Oper. Res."},{"key":"6_CR28","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/j.eswa.2006.08.023","volume":"34","author":"YS Juang","year":"2008","unstructured":"Juang, Y.S., Lin, S.S., Kao, H.P.: A knowledge management system for series-parallel availability optimization and design. Expert Syst. Appl. 34, 181\u2013193 (2008)","journal-title":"Expert Syst. Appl."},{"key":"6_CR29","unstructured":"Karaboga, D.: An idea based on honey bee swarm for numerical optimization. Tech. rep., TR06, Erciyes University, Engineering Faculty, Computer Engineering Department (2005)"},{"issue":"1","key":"6_CR30","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.amc.2009.03.090","volume":"214","author":"D Karaboga","year":"2009","unstructured":"Karaboga, D., Akay, B.: A comparative study of artificial bee colony algorithm. Appl. Math. Comput. 214(1), 108\u2013132 (2009)","journal-title":"Appl. Math. Comput."},{"key":"6_CR31","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1007\/s10898-007-9149-x","volume":"39","author":"D Karaboga","year":"2007","unstructured":"Karaboga, D., Basturk, B.: A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm. J. Global Optim. 39, 459\u2013471 (2007)","journal-title":"J. Global Optim."},{"key":"6_CR32","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.C.: Particle swarm optimization. In: IEEE International Conference on Neural Networks, vol. 4, pp. 1942\u20131948. Piscataway, Seoul (1995)","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"1","key":"6_CR33","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1109\/TR.2007.911248","volume":"57","author":"FI Khan","year":"2008","unstructured":"Khan, F.I., Haddara, M., Krishnasamy, L.: A new methodology for risk-based availability analysis. IEEE Trans. Reliab. 57(1), 103\u2013112 (2008)","journal-title":"IEEE Trans. Reliab."},{"issue":"1","key":"6_CR34","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0951-8320(01)00017-5","volume":"73","author":"J Knezevic","year":"2001","unstructured":"Knezevic, J., Odoom, E.R.: Reliability modeling of repairable systems using Petri nets and Fuzzy Lambda-Tau Methodology. Reliab. Eng. Syst. Saf. 73(1), 1\u201317 (2001)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"1","key":"6_CR35","first-page":"71","volume":"4","author":"A Kumar","year":"2006","unstructured":"Kumar, A., Yadav, S.P., Kumar, S.: Fuzzy reliability of a marine power plant using interval valued vague sets. Int. J. Appl. Sci. Eng. 4(1), 71\u201382 (2006)","journal-title":"Int. J. Appl. Sci. Eng."},{"issue":"2","key":"6_CR36","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1016\/j.isatra.2011.10.002","volume":"51","author":"M Kumar","year":"2012","unstructured":"Kumar, M., Yadav, S.P.: A novel approach for analyzing fuzzy system reliability using different types of intuitionistic fuzzy failure rates of components. ISA Trans. 51(2), 288\u2013297 (2012)","journal-title":"ISA Trans."},{"key":"6_CR37","volume-title":"Optimal Reliability Design\u2014Fundamentals and Applications","author":"W Kuo","year":"2001","unstructured":"Kuo, W., Prasad, V.R., Tillman, F.A., Hwang, C.: Optimal Reliability Design\u2014Fundamentals and Applications. Cambridge University Press, Cambridge (2001)"},{"issue":"3","key":"6_CR38","doi-asserted-by":"publisher","first-page":"62","DOI":"10.1287\/inte.32.3.62.43","volume":"32","author":"G Liberopoulos","year":"2002","unstructured":"Liberopoulos, G., Tsarouhas, P.: Systems analysis speeds up chipita\u2019s food processing line. Interfaces 32(3), 62\u201376 (2002)","journal-title":"Interfaces"},{"issue":"7","key":"6_CR39","doi-asserted-by":"publisher","first-page":"809","DOI":"10.1016\/j.ress.2005.08.004","volume":"91","author":"PS Rajpal","year":"2006","unstructured":"Rajpal, P.S., Shishodia, K.S., Sekhon, G.S.: An artificial neural network for modeling reliability, availability and maintainability of a repairable system. Reliab. Eng. Syst. Saf. 91(7), 809\u2013819 (2006)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"6_CR40","volume-title":"Fuzzy Logic with Engineering Applications","author":"TJ Ross","year":"2004","unstructured":"Ross, T.J.: Fuzzy Logic with Engineering Applications, 2nd edn. Wiley, New York (2004)","edition":"2"},{"issue":"6","key":"6_CR41","doi-asserted-by":"publisher","first-page":"913","DOI":"10.1016\/j.ress.2007.03.039","volume":"93","author":"RK Sharma","year":"2008","unstructured":"Sharma, R.K., Kumar, S.: Performance modeling in critical engineering systems using RAM analysis. Reliab. Eng. Syst. Saf. 93(6), 913\u2013919 (2008)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"6_CR42","doi-asserted-by":"crossref","unstructured":"Shi, Y., Eberhart, R.C.: Parameter selection in particle swarm optimization. evolutionary programming VII. In: EP 98, pp. 591\u2013600. Springer, New York (1998)","DOI":"10.1007\/BFb0040810"},{"issue":"2","key":"6_CR43","doi-asserted-by":"publisher","first-page":"1614","DOI":"10.1016\/j.asoc.2010.04.021","volume":"11","author":"S Taheri","year":"2011","unstructured":"Taheri, S., Zarei, R.: Bayesian system reliability assessment under the vague environment. Appl. Soft Comput. 11(2), 1614\u20131622 (2011)","journal-title":"Appl. Soft Comput."},{"key":"6_CR44","doi-asserted-by":"crossref","unstructured":"Yang, X.S., Deb, S.: Cuckoo search via l\u00e9vy flights. In: Proceedings of World Congress on Nature & Biologically Inspired Computing (NaBIC 2009), pp. 210\u2013214. IEEE Publications, USA (2009)","DOI":"10.1109\/NABIC.2009.5393690"},{"issue":"11","key":"6_CR45","doi-asserted-by":"publisher","first-page":"1465","DOI":"10.1016\/j.cor.2010.10.028","volume":"38","author":"WC Yeh","year":"2011","unstructured":"Yeh, W.C., Hsieh, T.J.: Solving reliability redundancy allocation problems using an artificial bee colony algorithm. Comput. Oper. Res. 38(11), 1465\u20131473 (2011)","journal-title":"Comput. Oper. Res."},{"issue":"2","key":"6_CR46","doi-asserted-by":"publisher","first-page":"404","DOI":"10.1109\/TR.2011.2134190","volume":"60","author":"WC Yeh","year":"2011","unstructured":"Yeh, W.C., Su, J.C.P., Hsieh, T.J., Chih, M., Liu, S.L.: Approximate reliability function based on wavelet latin hypercube sampling and bee recurrent neural network. IEEE Trans. Reliab. 60(2), 404\u2013414 (2011)","journal-title":"IEEE Trans. Reliab."},{"key":"6_CR47","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh, L.A.: Fuzzy sets. Inf. Control 8, 338\u2013353 (1965)","journal-title":"Inf. Control"},{"key":"6_CR48","doi-asserted-by":"crossref","unstructured":"Zavala, A., Diharce, E., Aguirre, A.: Particle evolutionary swarm for design reliability optimization. In: Lecture Notes in Computer Science 3410, Presented at the Third International Conference on Evolutionary Multi-Criterion Optimization, pp. 856\u2013869, Guanajuato (2005)","DOI":"10.1007\/978-3-540-31880-4_59"}],"container-title":["Intelligent Systems Reference Library","Intelligent Decision Making in Quality Management"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-24499-0_6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,12]],"date-time":"2024-06-12T04:02:21Z","timestamp":1718164941000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-24499-0_6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,31]]},"ISBN":["9783319244976","9783319244990"],"references-count":48,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-24499-0_6","relation":{},"ISSN":["1868-4394","1868-4408"],"issn-type":[{"type":"print","value":"1868-4394"},{"type":"electronic","value":"1868-4408"}],"subject":[],"published":{"date-parts":[[2015,10,31]]}}}