{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T21:20:01Z","timestamp":1725830401925},"publisher-location":"Cham","reference-count":20,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319252544"},{"type":"electronic","value":"9783319252551"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-25255-1_25","type":"book-chapter","created":{"date-parts":[[2015,9,24]],"date-time":"2015-09-24T05:39:46Z","timestamp":1443073186000},"page":"304-315","source":"Crossref","is-referenced-by-count":0,"title":["Spare Part Demand Prediction Based on Context-Aware Matrix Factorization"],"prefix":"10.1007","author":[{"given":"Jianwei","family":"Ding","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yingbo","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuan","family":"Cao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Li","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianmin","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,11,13]]},"reference":[{"key":"25_CR1","doi-asserted-by":"publisher","first-page":"212","DOI":"10.1016\/j.ijpe.2014.08.019","volume":"157","author":"M.Z. Babai","year":"2014","unstructured":"Babai, M.Z., Syntetos, A., Teunter, R.: Intermittent demand forecasting: An empirical study on accuracy and the risk of obsolescence. International Journal of Production Economics\u00a0157, 212\u2013219 (2014)","journal-title":"International Journal of Production Economics"},{"key":"25_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ress.2013.09.012","volume":"123","author":"A. Barabadi","year":"2014","unstructured":"Barabadi, A., Barabady, J., Markeset, T.: Application of reliability models with covariates in spare part prediction and optimization\u2013a case study. Reliability Engineering & System Safety\u00a0123, 1\u20137 (2014)","journal-title":"Reliability Engineering & System Safety"},{"issue":"15","key":"25_CR3","first-page":"6785","volume":"10","author":"Y. Cao","year":"2014","unstructured":"Cao, Y., Li, Y.: A two-stage approach of forecasting spare parts demand using particle swarm optimization and fuzzy neural network. Journal of Computational Information Systems\u00a010(15), 6785\u20136793 (2014)","journal-title":"Journal of Computational Information Systems"},{"issue":"6","key":"25_CR4","doi-asserted-by":"publisher","first-page":"4358","DOI":"10.1016\/j.eswa.2009.11.092","volume":"37","author":"F.-L. Chen","year":"2010","unstructured":"Chen, F.-L., Chen, Y.-C., Kuo, J.-Y.: Applying moving back-propagation neural network and moving fuzzy neuron network to predict the requirement of critical spare parts. Expert Systems with Applications\u00a037(6), 4358\u20134367 (2010)","journal-title":"Expert Systems with Applications"},{"key":"25_CR5","first-page":"1","volume":"2","author":"M. Chui","year":"2010","unstructured":"Chui, M., L\u00f6ffler, M., Roberts, R.: The internet of things. McKinsey Quarterly\u00a02, 1\u20139 (2010)","journal-title":"McKinsey Quarterly"},{"key":"25_CR6","doi-asserted-by":"crossref","unstructured":"Hu, Q., Bai, Y., Zhao, J., Cao, W.: Modeling spare parts demands forecast under two-dimensional preventive maintenance policy. Mathematical Problems in Engineering (2015)","DOI":"10.1155\/2015\/728241"},{"issue":"2","key":"25_CR7","doi-asserted-by":"publisher","first-page":"1035","DOI":"10.1016\/j.amc.2006.01.064","volume":"181","author":"Z. Hua","year":"2006","unstructured":"Hua, Z., Zhang, B.: A hybrid support vector machines and logistic regression approach for forecasting intermittent demand of spare parts. Applied Mathematics and Computation\u00a0181(2), 1035\u20131048 (2006)","journal-title":"Applied Mathematics and Computation"},{"key":"25_CR8","doi-asserted-by":"crossref","unstructured":"Hyndman, R., Koehler, A.B., Ord, J.K., Snyder, R.D.: Forecasting with exponential smoothing: the state space approach. Springer Science & Business Media (2008)","DOI":"10.1007\/978-3-540-71918-2"},{"key":"25_CR9","doi-asserted-by":"crossref","unstructured":"Jardine, A.K.S., Tsang, A.H.C.: Maintenance, replacement, and reliability: theory and applications. CRC Press (2013)","DOI":"10.1201\/b14937"},{"issue":"2","key":"25_CR10","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1016\/S0925-5273(01)00174-8","volume":"76","author":"W.J. Kennedy","year":"2002","unstructured":"Kennedy, W.J., Patterson, J.W., Fredendall, L.D.: An overview of recent literature on spare parts inventories. International Journal of Production Economics\u00a076(2), 201\u2013215 (2002)","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"25_CR11","doi-asserted-by":"publisher","first-page":"79","DOI":"10.9709\/JKSS.2012.21.3.079","volume":"21","author":"K.-R. Kim","year":"2012","unstructured":"Kim, K.-R., Yong, H.-Y., Kwon, K.-S.: Optimization for concurrent spare part with simulation and multiple regression. Journal of the Korea Society for Simulation\u00a021(3), 79\u201388 (2012)","journal-title":"Journal of the Korea Society for Simulation"},{"key":"25_CR12","doi-asserted-by":"crossref","unstructured":"Koren, Y., Bell, R., Volinsky, C.: Matrix factorization techniques for recommender systems. Computer\u00a0(8), 30\u201337 (2009)","DOI":"10.1109\/MC.2009.263"},{"key":"25_CR13","unstructured":"Langville, A.N., Meyer, C.D., Albright, R., Cox, J., Duling, D.: Algorithms, initializations, and convergence for the nonnegative matrix factorization. arXiv preprint arXiv:1407.7299 (2014)"},{"key":"25_CR14","doi-asserted-by":"publisher","first-page":"1513","DOI":"10.4028\/www.scientific.net\/AMM.519-520.1513","volume":"519","author":"H.L. Mao","year":"2014","unstructured":"Mao, H.L., Gao, J.W., Chen, X.J., Gao, J.D.: Demand prediction of the rarely used spare parts based on the bp neural network. Applied Mechanics and Materials\u00a0519, 1513\u20131519 (2014)","journal-title":"Applied Mechanics and Materials"},{"issue":"1","key":"25_CR15","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/s13243-015-0010-y","volume":"5","author":"M. Matsumoto","year":"2015","unstructured":"Matsumoto, M., Ikeda, A.: Examination of demand forecasting by time series analysis for auto parts remanufacturing. Journal of Remanufacturing\u00a05(1), 1\u201320 (2015)","journal-title":"Journal of Remanufacturing"},{"issue":"2","key":"25_CR16","doi-asserted-by":"publisher","first-page":"794","DOI":"10.1016\/j.ijpe.2012.02.012","volume":"140","author":"S. Moon","year":"2012","unstructured":"Moon, S., Hicks, C., Simpson, A.: The development of a hierarchical forecasting method for predicting spare parts demand in the south korean navy\u2013a case study. International Journal of Production Economics\u00a0140(2), 794\u2013802 (2012)","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"25_CR17","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1109\/SURV.2013.042313.00197","volume":"16","author":"C. Perera","year":"2014","unstructured":"Perera, C., Zaslavsky, A., Christen, P., Georgakopoulos, D.: Context aware computing for the internet of things: A survey. IEEE Communications Surveys & Tutorials\u00a016(1), 414\u2013454 (2014)","journal-title":"IEEE Communications Surveys & Tutorials"},{"key":"25_CR18","first-page":"44","volume":"7","author":"L. Qu","year":"2006","unstructured":"Qu, L., Zhang, Q.: An overview of inventory management for spare parts. Research and Exploration in Laboratory\u00a07, 044 (2006)","journal-title":"Research and Exploration in Laboratory"},{"key":"25_CR19","doi-asserted-by":"crossref","unstructured":"Wang, Z., Hu, C., Wang, W., Kong, X., Zhang, W.: A prognostics-based spare part ordering and system replacement policy for a deteriorating system subjected to a random lead time. International Journal of Production Research, 1\u201317 (2014) (ahead-of-print)","DOI":"10.1080\/00207543.2014.988892"},{"key":"25_CR20","first-page":"30","volume":"8","author":"W.-S.. Li","year":"2007","unstructured":"Li, W.-S.: An overview of spare parts demand prediction technology. Logistics Technology\u00a08, 30\u201333 (2007)","journal-title":"Logistics Technology"}],"container-title":["Lecture Notes in Computer Science","Web Technologies and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-25255-1_25","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T01:36:01Z","timestamp":1559266561000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-25255-1_25"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319252544","9783319252551"],"references-count":20,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-25255-1_25","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2015]]}}}