{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:25:25Z","timestamp":1759667125784,"version":"3.41.0"},"publisher-location":"Cham","reference-count":27,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319282695"},{"type":"electronic","value":"9783319282701"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-28270-1_18","type":"book-chapter","created":{"date-parts":[[2016,1,22]],"date-time":"2016-01-22T07:59:41Z","timestamp":1453449581000},"page":"209-220","source":"Crossref","is-referenced-by-count":3,"title":["A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems"],"prefix":"10.1007","author":[{"given":"Ismail M.","family":"Ali","sequence":"first","affiliation":[]},{"given":"Saber Mohammed","family":"Elsayed","sequence":"additional","affiliation":[]},{"given":"Tapabrata","family":"Ray","sequence":"additional","affiliation":[]},{"given":"Ruhul A.","family":"Sarker","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,1,23]]},"reference":[{"doi-asserted-by":"crossref","unstructured":"Zhai, X., Tiong, R.L.K., Bjornsson, H.C., Chua, D.K.H.: A simulation-GA based model for production planning in precast plant. In: Proceedings of the 38th Conference on Winter Simulation, pp. 1796\u20131803. Winter Simulation Conference (2006)","key":"18_CR1","DOI":"10.1109\/WSC.2006.322957"},{"key":"18_CR2","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/0164-1212(91)90052-8","volume":"15","author":"DF Mathaisel","year":"1991","unstructured":"Mathaisel, D.F., Comm, C.L.: Course and classroom scheduling: an interactive computer graphics approach. J. Syst. Softw. 15, 149\u2013157 (1991)","journal-title":"J. Syst. Softw."},{"key":"18_CR3","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0969-6997(02)00006-6","volume":"8","author":"SC Chang","year":"2002","unstructured":"Chang, S.C.: A new aircrew-scheduling model for short-haul routes. J. Air Transp. Manag. 8, 249\u2013260 (2002)","journal-title":"J. Air Transp. Manag."},{"unstructured":"Fleming, P.J., Fonseca, C.M.: Genetic algorithms in control systems engineering: a brief introduction. In: IEE Colloquium on Genetic Algorithms for Control Systems Engineering, pp. 1\/1\u20131\/5. IET (1993)","key":"18_CR4"},{"key":"18_CR5","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. Oper. Res. 112, 3\u201341 (1999)","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR6","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R Kolisch","year":"2001","unstructured":"Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega 29, 249\u2013272 (2001)","journal-title":"Omega"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1\u201314 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR8","doi-asserted-by":"publisher","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E Demeulemeester","year":"1992","unstructured":"Demeulemeester, E., Herroelen, W.: A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manag. Sci. 38, 1803\u20131818 (1992)","journal-title":"Manag. Sci."},{"doi-asserted-by":"crossref","unstructured":"Li, C., Bettati, R., Zhao, W.: Static priority scheduling for ATM networks. In: Proceedings of the 18th IEEE Real-Time Systems Symposium, pp. 264\u2013273. IEEE (1997)","key":"18_CR9","DOI":"10.1109\/REAL.1997.641288"},{"doi-asserted-by":"crossref","unstructured":"Lupetti, S., Zagorodnov, D.: Data popularity and shortest-job-first scheduling of network transfers. In: ICDT 2006 International Conference on Digital Telecommunications, pp. 26\u201326. IEEE (2006)","key":"18_CR10","DOI":"10.1109\/ICDT.2006.28"},{"key":"18_CR11","first-page":"585","volume":"12","author":"X Cheng","year":"2006","unstructured":"Cheng, X., Wu, C.: Hybrid algorithm for complex project scheduling. Comput. Integr. Manuf. Syst. Beijing 12, 585 (2006)","journal-title":"Comput. Integr. Manuf. Syst. Beijing"},{"key":"18_CR12","doi-asserted-by":"publisher","first-page":"6039","DOI":"10.1016\/j.eswa.2015.04.009","volume":"42","author":"X-L Zheng","year":"2015","unstructured":"Zheng, X.-L., Wang, L.: A multi-agent optimization algorithm for resource constrained project scheduling problem. Expert Syst. Appl. 42, 6039\u20136049 (2015)","journal-title":"Expert Syst. Appl."},{"key":"18_CR13","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1007\/978-1-4615-1507-4_25","volume-title":"Essays and Surveys in Metaheuristics","author":"K Nonobe","year":"2002","unstructured":"Nonobe, K., Ibaraki, T.: Formulation and tabu search algorithm for the resource constrained project scheduling problem. Essays and Surveys in Metaheuristics, pp. 557\u2013588. Springer, Berlin (2002)"},{"key":"18_CR14","doi-asserted-by":"publisher","first-page":"890","DOI":"10.1016\/j.cor.2011.07.010","volume":"39","author":"C Fang","year":"2012","unstructured":"Fang, C., Wang, L.: An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem. Comput. Oper. Res. 39, 890\u2013901 (2012)","journal-title":"Comput. Oper. Res."},{"key":"18_CR15","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1504\/IJCSM.2014.059386","volume":"5","author":"W Chen","year":"2014","unstructured":"Chen, W., Ni, X.: Chaotic differential evolution algorithm for resource constrained project scheduling problem. Int. J. Comput. Sci. Math. 5, 81\u201393 (2014)","journal-title":"Int. J. Comput. Sci. Math."},{"key":"18_CR16","doi-asserted-by":"publisher","first-page":"2653","DOI":"10.1016\/j.cor.2008.11.010","volume":"36","author":"N Damak","year":"2009","unstructured":"Damak, N., Jarboui, B., Siarry, P., Loukil, T.: Differential evolution for solving multi-mode resource-constrained project scheduling problems. Comput. Oper. Res. 36, 2653\u20132659 (2009)","journal-title":"Comput. Oper. Res."},{"doi-asserted-by":"crossref","unstructured":"Cheng, M.Y., Tran, D.H.: An efficient hybrid differential evolution based serial method for multimode resource-constrained project scheduling. KSCE J. Civil Eng. 1\u201311 (2015)","key":"18_CR17","DOI":"10.1007\/s12205-015-0414-0"},{"key":"18_CR18","doi-asserted-by":"publisher","first-page":"3175","DOI":"10.1016\/j.ins.2011.03.018","volume":"181","author":"D Jia","year":"2011","unstructured":"Jia, D., Zheng, G., Khan, M.K.: An effective memetic differential evolution algorithm based on chaotic local search. Inf. Sci. 181, 3175\u20133187 (2011)","journal-title":"Inf. Sci."},{"key":"18_CR19","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/0377-2217(87)90240-2","volume":"29","author":"N Christofides","year":"1987","unstructured":"Christofides, N., Alvarez-Vald\u00e9s, R., Tamarit, J.M.: Project scheduling with resource constraints: a branch and bound approach. Eur. J. Oper. Res. 29, 262\u2013273 (1987)","journal-title":"Eur. J. Oper. Res."},{"key":"18_CR20","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1007\/978-1-4615-5533-9_7","volume-title":"Project Scheduling","author":"R Kolisch","year":"1999","unstructured":"Kolisch, R., Hartmann, S.: Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz, J. (ed.) Project Scheduling, vol. 14, pp. 147\u2013178. Springer, Berlin (1999)"},{"key":"18_CR21","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1023\/A:1008202821328","volume":"11","author":"R Storn","year":"1997","unstructured":"Storn, R., Price, K.: Differential evolution\u2013a simple and efficient heuristic for global optimization over continuous spaces. J. Global Optim. 11, 341\u2013359 (1997)","journal-title":"J. Global Optim."},{"key":"18_CR22","first-page":"1","volume-title":"Evolutionary Optimization. Variants of Evolutionary Algorithms for Real-World Applications","author":"C Blum","year":"2012","unstructured":"Blum, C., Chiong, R., Clerc, M., De Jong, K., Michalewicz, Z., Neri, F., Weise, T.: Evolutionary Optimization. Variants of Evolutionary Algorithms for Real-World Applications, pp. 1\u201329. Springer, Berlin (2012)"},{"key":"18_CR23","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1007\/978-1-4615-5533-9_9","volume-title":"Project Scheduling","author":"R Kolisch","year":"1999","unstructured":"Kolisch, R., Schwindt, C., Sprecher, A.: Benchmark instances for project scheduling problems. In: Weglarz, J. (ed.) Project Scheduling, vol. 14, pp. 197\u2013212. Springer, Berlin (1999)"},{"key":"18_CR24","doi-asserted-by":"publisher","first-page":"252","DOI":"10.1080\/05695557808975212","volume":"10","author":"JP Stinson","year":"1978","unstructured":"Stinson, J.P., Davis, E.W., Khumawala, B.M.: Multiple resource\u2013constrained scheduling using branch and bound. AIIE Trans. 10, 252\u2013259 (1978)","journal-title":"AIIE Trans."},{"doi-asserted-by":"crossref","unstructured":"Ronkkonen, J., Kukkonen, S., Price, K.V.: Real-parameter optimization with differential evolution. In: Proceedings of IEEE CEC, Vol. 1, pp. 506\u2013513 (2009)","key":"18_CR25","DOI":"10.1109\/CEC.2005.1554725"},{"key":"18_CR26","doi-asserted-by":"publisher","first-page":"5870","DOI":"10.1016\/j.eswa.2014.03.027","volume":"41","author":"A Fahmy","year":"2014","unstructured":"Fahmy, A., Hassan, T.M., Bassioni, H.: Improving RCPSP solutions quality with stacking justification-application with particle swarm optimization. Expert Syst. Appl. 41, 5870\u20135881 (2014)","journal-title":"Expert Syst. Appl."},{"key":"18_CR27","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.ejor.2013.03.005","volume":"229","author":"R Zamani","year":"2013","unstructured":"Zamani, R.: A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. Eur. J. Oper. Res. 229, 552\u2013559 (2013)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Lecture Notes in Computer Science","Artificial Life and Computational Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-28270-1_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,1]],"date-time":"2025-06-01T06:15:12Z","timestamp":1748758512000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-28270-1_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319282695","9783319282701"],"references-count":27,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-28270-1_18","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2016]]}}}